0% found this document useful (0 votes)
65 views3 pages

NB 12

Boonyanuch Engineering Co., Ltd. is applying to renew their National Board "R" Certificate of Authorization for metallic and non-metallic repairs and alterations in both shop and field locations. They are requesting the "R" certificate scope with their contracted Authorized Inspection Agency, ABSG Consulting Inc. The application provides contact information for the primary contact, Mr. Anusorn Sornkajorn, and recommends logistical details for the review team such as airport, transportation, and hotel accommodations near their facility in Rayong, Thailand.

Uploaded by

Karthik S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views3 pages

NB 12

Boonyanuch Engineering Co., Ltd. is applying to renew their National Board "R" Certificate of Authorization for metallic and non-metallic repairs and alterations in both shop and field locations. They are requesting the "R" certificate scope with their contracted Authorized Inspection Agency, ABSG Consulting Inc. The application provides contact information for the primary contact, Mr. Anusorn Sornkajorn, and recommends logistical details for the review team such as airport, transportation, and hotel accommodations near their facility in Rayong, Thailand.

Uploaded by

Karthik S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

NB‐12 

Rev. 30 (6/2019)      

APPLICATION FOR THE NATIONAL BOARD “R” CERTIFICATE OF AUTHORIZATION 
Application Type:  [1] NEW  [2]  RENEWAL Applying For:  [3] “R” ONLY  [4] “R” WITH ASME

Company name and address listed in this section should be listed exactly as it appears in your QC Manual and  
exactly as it will appear on your Certificate of Authorization with this issuance. 
Boonyanuch Engineering Co., Ltd.
[5a] Company Name:  

-
[5b] Division (if applicable):  

[6] Requested Abbreviation for Stamping (if applicable):  
BEC

[7] Physical Address   [8] Mailing Address (if different from physical address)  

19, Watchaklukya Road, Tambol Huaypong, Amphur Same as Physical Address


Muangrayong, Rayong 21150, Thailand

[9] When shipping via courier (UPS or DHL), which address should be used?  ■ Physical Address  Mailing Address  

[10a]  Does this application include a location change from your previously issued Certificate?   ■ NO  YES 


[10b]  If YES ‐ address on current Certificate:   
[11a]  Does this application include a name change from your previously issued Certificate?   ■ NO  YES 
[11b]  If YES ‐ company name on current Certificate:   
[11c]  Is this name change due to an Ownership Change?            YES*              NO
*By checking the box below, the new owners agree that they will take full responsibility for all work previously performed under this “R”
Certificate of Authorization.  If the new owners do not want to take responsibility for previous work performed under this “R” Certificate, an
NB‐12 form will need to be submitted to apply for a new “R” Certificate of Authorization.  Yes, we accept responsibility. 

Check All Requested Scopes:  [12]  Repairs [15] Shop [18] ■ Metallic  [20] Design Only


[13]  Alterations [16] Field [19] *Non‐Metallic
[14]  ■ Both [17] ■ Both
* Graphite    RP

Authorized Inspection Agency (AIA) or Owner‐User Inspection Organization (OUIO): 
[21a]   
ABSG Consulting Inc.   [21b]  
(AIA/OUIO Name)  (Effective date of AIA contract) 

IMPORTANT FOR NEW APPLICANTS AND AIA CHANGES:   A copy of your contract cover page with your AIA must also be submitted. 
Primary Contact Information: 
Mr.Anusorn Sornkajorn President
[22a]    [22b] 
(First and Last Name)  (Title) 
66(0) 38 687067-71 [email protected]
[23]    [24]   
(Telephone Number) (Email Address)  

[25]   66(0) 38 687072 [26]   www.boonyanuch.com


(Fax Number) (Company Web Address) 

By signing this form, you acknowledge that the information above is correct and that you have read and understand the conditions, the statement 
of due process and confidentiality and demonstration on page 2 of this application. 

 [27]  X Oct. 18, 2019 [28]   


Mr.Anusorn Sornkajorn - president
Signature of company’s authorized representative  Date  Print name & title of company’s authorized representative 

Page 1 of 3
NB‐12 Rev. 30 (6/2019)      

Conditions 
 The Certificate and “R” Symbol Stamp shall be used only by the named company and in the manner prescribed in the National Board Inspection Code
(NBIC) and NB‐415, Accreditation of “R” Repair Organizations.  The company must have all parts of the current edition of the NBIC when performing 
work under the Certificate of Authorization. 
 The Certificate and stamp will be surrendered should the company discontinue the above activities, at the request of the National Board or at the
expiration of the Certificate.  The company will pay any and all legal fees and National Board costs associated with the recovery of the Certificate and 
stamp. 
 The National Board member jurisdiction or the National Board may make audits or unannounced visits as deemed necessary to ensure compliance 
with the rules of the National Board. 
 For renewals, if the Certificate is issued after it expires, and no Certificate extension was issued, there will be a lapse in the organization’s ability to 
perform any Repair/Alteration activity between the expiration date and issuance date.  If the certificate is issued more than 6 months past 
expiration, a new “R” number may be assigned. 
 Under no circumstances shall the National Board “R” Symbol Stamp be used without the acceptance of a National Board Commissioned Inspector.
Statement of Due Process and Confidentiality 
 The  Review  Team’s  responsibility  is  to  document  any  findings  and  report  them  to  the  National  Board  along  with  a  recommendation  concerning
issuance of a Certificate of Authorization. 
 Team members are prohibited from discussing your company’s proprietary information as well as the information contained in their report at any 
time, except with National Board staff or Appeals Committee members.  Information obtained by the team member, staff or committee members 
will be held in strict confidence.  A copy of their report will be left with the applicant upon request. 
 National Board policy provides for due process by an aggrieved party.  Individuals may request information concerning this procedure by contacting 
the Appeals Committee, 1055 Crupper Avenue, Columbus, Ohio 43229‐1183 or fax 614.847.1828. 
Demonstration 
 A Review Team will conduct an evaluation of the company’s Quality System. The company must demonstrate sufficient implementation  of the 
Quality System to provide evidence of the company’s knowledge of welding, nondestructive examination, postweld heat treatment  and other 
repair or alteration activities performed as applicable for the requested scope of work. 
 The evaluation of the Quality System must include a demonstration of welding, if included within the scope of activities applied for. 
 The implementation demonstration must include any ongoing or current repair/alteration work at the time of the review, otherwise, a mock‐
up, or a combination of a mock‐up and non‐repair/alteration work may be used. 

Suwarnabhumi International Airport


[29] Recommended Airport:  [29a] Name of Airport:  

Samutprakarn
[29b] City:    [29c] Three Letter Airport Code:   

[30a] Do you recommend renting a car?  [30b] Alternate mode of transportation: 

  Yes    No  (If No, please complete [30b]) Pick up by Company

[31] Recommended Hotel/Motel for Review Team: 
Kantary bay 66(0) 38 804844
(Hotel/Motel Name) (Phone) 
50, Leap Chai fang Road 100
(Address) (Miles from airport to lodging) 
Paknam, Rayong 21000, Thailand. 20
(Miles from lodging to shop review location) 
December 25,2019 to 03, January 2020
[32] Unacceptable dates for review:  

[33] Please check if any safety items below are required for the Team Leader: 

Safety Shoes    Safety Glasses/    Hard Hat Gloves Other:


    Side Shields 

[34] Please check the days of the week that your company is open for business: 

  Sunday    Monday    Tuesday  Wednesday Thursday Friday    Saturday

Submit completed form to:  The National Board Please Note: An incomplete/improperly completed 


[email protected]  or  1055 Crupper Avenue  application may delay the processing of this request.  
Columbus, Ohio  43229‐1183  Please be sure your form is complete before submitting. 
Page 2 of 3
NB‐12 Rev. 30 (6/2019)      

GUIDE FOR COMPLETING THE APPLICATION FOR THE NATIONAL BOARD “R” CERTIFICATE OF AUTHORIZATION 
[1]    Check this box if this is an application for new issuance of an “R” Certificate of Authorization. 
[2]    Check this box if this is an application for a renewal of an existing “R” Certificate of Authorization. 
[3]   Check this box if you do not hold and/or are not applying for ASME Certificates.  This will be considered an “R” Only. 
[4]  Check this box if you also hold or are applying for an ASME Certificate.  This will be considered an “R w/ASME”. 
Print your company name exactly as it appears in your Quality Control Manual and how it will appear on this issuance of the Certificate.  
[5a]   
Punctuation, spacing, abbreviations and capitalization of the name are important.  If your company is having a name change at your 
review for renewal, print the new company name on line [5a] and the name on your current Certificate on line [11b]. 
When applicable, print your company division name exactly as it appears on your QC Manual cover page and how it will appear on this 
[5b] 
issuance of the Certificate.  Punctuation, spacing, abbreviations and capitalization of the division name are important. 
If applicable, print the exact abbreviation used for marking or stamping as required by the NBIC. For example, ABC Boiler Company may use 
[6] 
(ABC or ABCBC) for their name for the stamping. NOTE: Company Name (not the Abbreviation) is required for "R" Reports of Repair. 
Physical address exactly as listed in your company’s Quality Control Manual and how it will appear on this issuance of the Certificate. 
[7]  Punctuation, spacing, abbreviations and capitalization of the name are important.  If your company is having a location change at your 
review for renewal, print the new location on line [7] and the location on your current Certificate on line [10b]. 
Mailing address, if different from your physical address (i.e. PO Box).  This address will be used to mail your renewed certificate by USPS 
[8] 
mail.   
If a steel symbol stamp is being sent along with this issuance, check the box you would like your steel stamp and Certificate delivered.  Steel 
[9] 
stamps and Certificates are shipped via UPS or DHL depending on location (determined by the National Board). 
[10a]  If you are including a location change with your renewal issuance, please indicate by checking “Yes” and then complete line [10b] 
[10b]  If you checked “Yes” on line [10a], print the address exactly as it appears on your previously issued Certificate. 
[11a]  If you are including a name change with your renewal issuance, please indicate by checking “Yes” and then complete line [11b] 
[11b]  If you checked “Yes” on line [11a], print the full company name exactly as it appears on your previously issued Certificate. 
By checking “Yes”, you are stating the company name change being done at the time of renewal is due to an ownership change.  By 
checking “No” that means this is a company name change, but not an ownership change.   
[11c] 
* By checking the “Yes, we accept responsibility”, the new ownership of the company is accepting responsibility for all previous work
performed under the revised “R” Certificate. 
[12]  Check this box if your program only covers repairs as defined in the NBIC. 
Check this box if your company will be performing alterations only as defined in the NBIC and will perform physical work to the pressure 
[13] 
retaining item. 
[14]  Check this box if your company will be performing repairs and alterations as defined in the NBIC. 
Check this box if your company will be performing work only at the address on the Certificate of Authorization (see SHOP in NBIC Part 3, 
[15] 
Section 9). 
[16]  Check this box if your company will be performing code work at field locations only (see FIELD in NBIC Part 3, Section 9). 
Check this box if your company will be performing work at both the address on the Certificate of Authorization and field locations 
[17] 
controlled by the address listed on the Certificate of Authorization. 
[18]  Check this box if your company will be performing work on metallic pressure‐retaining items. 
Check this box if your company will be performing work on non‐metallic pressure‐retaining items. 
[19] 
*specify if the non‐metallic work is on graphite and/or RP.
Check this box if your company will be performing code calculations for re‐rating or alterations as defined in the NBIC and will not perform 
[20] 
physical work to the pressure‐retaining item except for the “R” stamping or NDE. 
[21a]  Name of your Authorized Inspection Agency or Owner‐User Inspection Organization. 
[21b]  Supply effective date of the contract/agreement with your company’s Authorized Inspection Agency. 
[22a]   Print the name of your company’s primary contact.  This is the person the National Board will contact with any questions or concerns. 
[22b]  Print the title of your company’s primary contact. 
[23]  Telephone number of your company. 
[24]  Email address of your company which is routinely monitored. 
[25]  Fax number of your company. 
[26]  Web site of your company.  If your company does not have a web site, please note “N/A”. 
[27]  Signature of your company’s Authorized Representative. Required for both new, renewal & revision applications. 
[28]  Print the name & title of the Authorized Representative who signed line [27]. 
[29a]  Print the name of the recommended airport where the Team Leader will arrive. 
[29b]  Print the city of the airport where the Team Leader will arrive. 
[29c]  The three digit code of the airport where the Team Leader will arrive. 
[30a]  Do you recommend the Team Leader rent a car?  
[30b]  If you have checked “No” on line [30‐a], list an alternate mode of transportation. 
[31]  Provide complete information for the recommended hotel/motel for the review team. 
[32]  Provide any dates that will be unacceptable for scheduling your review. 
[33]  Check the boxes, as applicable, for any safety items the Team Leader will need for the Shop Review. 
[34]  Check the boxes of the days of the week your company is open for business (for a Review). 

Page 3 of 3

You might also like