N.N Fasion Quality Assurance Manual
N.N Fasion Quality Assurance Manual
NN FASHION
Soft Goods Quality Assurance Manual
2014
Index
1. About the NN Fashion Quality Assurance Manual ------------------------------- 3
2. The Five Critical Processes ------------------------------------------------------------ 4
3. Departmental responsibility ------------------------------------------------------------ 5
4. Introduction of a new Vendor/factory & supplier -------------------------------- 7
5. Style file used by merchandisers ------------------------------------------------------9
6. Set up QC file --------------------------------------------------------------------------------9
7. Product release – the handover of QC files --------------------------------------10
8. Fabric / Trim card - bulk submission of fabric / trims ---------------------------10
9. Color assessment -------------------------------------------------------------------------11
10. Shade Band Submission -----------------------------------------------------------------12
11. Laboratory testing -------------------------------------------------------------------------13
12. Fabric inspection --------------------------------------------------------------------------15
13. The inspection flow -----------------------------------------------------------------------19
14. Pre-production Review meeting ------------------------------------------------------20
15. Standard makes specifications --------------------------------------------------------21
16. QC Check points for SPECIFIC areas ------------------------------------------------25
17. Garment washing & finishing -----------------------------------------------------------27
18. Cut part inspection ------------------------------------------------------------------------28
19. Fusing procedure --------------------------------------------------------------------------29
20. Start up production line ------------------------------------------------------------------30
21. The inline inspection ----------------------------------------------------------------------31
22. Top samples / rack samples / shipment samples ---------------------------------32
23. Random inspection method -------------------------------------------------------------33
24. The 8 steps in the Pre-final / Final inspection -------------------------------------35
25. Classification of defects------------------------------------------------------------------42
26. Verifying the Acceptability of a Shipment ------------------------------------------44
27. Fault categories ----------------------------------------------------------------------------45
28. Writing QC reports ------------------------------------------------------------------------49
29. Closing Meeting after inspection-----------------------------------------------------50
30. Shipment release procedure ----------------------------------------------------------52
1. About the NN Fashion Quality Assurance Manual
The N N Fashion Quality Manual specifies how our technical staff should perform in the
company. Everyone within the company is working contained by the same guidelines and
therefore maintaining a consistent high level of quality.
Quality statement: Quality in this instance is not just the quality of the product, but quality of
all performance related areas:
• Quality of product
• Quality of work
• Quality of service / communication
• Quality of information
• Quality of process
• Quality of division
• Quality of people
• Quality of system
• Quality of objectives
This manual cannot cover all areas of each job role, but it is hoped that from the information
contained within, all staff will be able to make correct decisions and judgments as required.
3. Departmental responsibility
Management
• To ensure the requirements of the manual are implemented and maintained
• To communicate regularly with all parties involved so that difficulties and suggestions
will be recognized. Furthermore, the requirements and development of the company can
be conveyed.
• To spot check the quality records and operating procedures.
• To be involved in the management review of the manual.
Merchandising Department
• To liaise between customers and factories so that the requirements of the customer can
be fully understood and conveyed to suppliers.
• To present customer and suppliers information to QA department, in order that a
suitable standard/specification can be used for inspection. This can be supported by
completing all the specified documents.
• Factory sourcing to obtain a good quality product and a wide variety of options.
Quality Assurance Department
• Quality Assurance.
• Social compliance monitoring.
• Upgrade the quality systems of the suppliers systematically.
• Approve samples of new product development.
• Provide technical support for merchandising department
• Maintain a QC library with international and individual customer standards
• Conduct planned and systematic inspections to ensure the product and service will
satisfy the quality requirement.
• Initiate action to prevent the occurrence of product nonconformity.
Shipping & Accounting
• To ensure all documentation for shipments is sent to the customer in sufficient time for
them to conduct import procedures before docking of vessels / aircraft.
• To ensure all payments are implemented on due date, therefore maintaining a good
working relationship with our sources.
• To check all L/C’s are received from customers within time for shipment and that the
documents conform to those requested.
Date: Date: Date: Date: Date:
*IMPORTANT: Must obtain all signatures for maker/factory activation
For Bottoms:
- Waist relaxed - High hip - Low hip - Thigh
Any component with a sharp edge or point that could cut or Critical
Z2 cause bodily harm to a customer
Loose stones in a garment that has been “stone washed” Critical
Z3 and which is intended for a child
Drawstrings at the head or neck of a garment that is intended Critical
Z4 for a child
Any other fault or defect that might cause injury to the end Critical
Z5 user
Wash and wear
Product conformity (Check against approved Sample and Specification)
Code Defect Classification
Q1 Overall appearance Major
Q2 Fit on Dummy (size/capacity) Major
Q3 Does not satisfactorily complete 5 full performance cycles Major
Q4 Washing or finishing standard Major
Q5 Garment Shape (Knit wear) Major
Q6 Side seam twisted >2 cm or 5% of the length of side seam Major
27.1 Fault categories and fault codes
Raw materials and components
Fabric
Code Defect Zone A Zone B
F1 Cuts, holes, tears, Broken yarn Major Major
F2 Weight +/- 5% (knitwear) Major Major
F3 Handle / softness different to quality standard Major Major
F4 Print/Design different to specification Major Major
F5 Wash effect different to quality standard Major Major
F6 Fabric flaws, Barrie’, weaving faults, slubs longer than 2cm Major Minor
F7 Colour bleeding Major Major
F8 Foreign particles caught into the fabric (contamination) Major Major
F9 Stop marks, broken / missing p ic k and fill in woven Major Minor
F10 Needle lines in a knitted fabric Major Minor
F11 Bowing or skewing of the fabric Major Minor
F12 Knot or repair that affects appearance of the fabric Major Major
F13 Dye spots that are obviously noticeable Major Minor
Trims – button, stud etc
Code Defect Zone A Zone B
T1 Defective, broken, cracked Major Major
T2 Not as design / specification requirement Major Minor
T3 Omission of component Major Minor
Zippers
Code Defect Zone A Zone B
T6 Incorrect zipper type/size/color used Major Minor
T7 Zipper not auto-stop as specified Major Major
T8 Top or bottom metal clip stick out and form a sharp point. Major Major
T9 Invisible zipper showing due to improper stitching Major Minor
T10 Zipper end not securely finished. Major Major
T11 Zipper waving Major Minor
Interlinings
Code Defect Zone A Zone B
T12 Strike through – adhesive melts through to face fabric Major Major
T13 Rippling – corrugation of fabric or fusing Major Minor
T14 Bubbling – areas of unfused interlining/fabric Major Minor
T15 Delaminating – fusing peels away from fabric Major Major
T16 Incorrect color Major Minor
27.2 Fault categories and fault codes
Aesthetics
Color
Code Defect Zone A Zone B
C1 Colour different to standard Major Major
C2 Shade bar Major minor
C3 Shade parts (panel to panel) Major minor
C4 Off approved shade band (tops to bottoms) Major
Appearance
Code Defect Zone A Zone B
G1 Impression marks, glazing, abrasion Major Minor
G2 Pleats visible, excess crease Major Minor
G3 Mould Major Major
G4 Infestation Major Major
G5 Dampness Major Major
G6 Excessive odor Major Major
Cleanliness and thread trimming
Code Defect Zone A Zone B
D1 Spot cleaning circle Major Major
D2 Dirt, chalk mark, oil stain over 0.5cm in diameter Major Minor
D3 Threads not trimmed over 3cm Major Minor
D4 Excessive quantity and length of loose threads Major Major
Printing
Code Defect Zone A Zone B
P1 Design or colour different to specification Major Major
P2 Printing design not clear Major minor
P3 Uneven printing (smudging) Major minor
P4 Printing off registration Major minor
P5 Cracking of print Major Major
Embroidery
Code Defect Zone A Zone B
E1 Design, size, colour different to specification Major Minor
E2 Crooked, tight tension of thread Major Minor
E3 Uneven in shape Major Minor
E4 Not level Major Minor
E5 Off Position over 1cm Major Minor
E6 Omitted, incomplete Major Major
E7 Broken, loose stitch, unravelling Major Major
27.2 Fault categories and fault codes
Construction
Layered construction (Pocket/ flap/ Zipper stand/ Placket/ Waistband/ Cuff/ Collar)
Code Defect Zone A Zone B
A1 Pleated, twisted or bulging Major Minor
A2 Distorted, poorly Shaped Major Minor
A3 Misaligned over 0.3cm (flap over a pocket) Major Minor
A4 Underneath visible on front (under collar showing) Major Major
A5 Uneven in width Major Minor
A6 Fullness unevenly distributed Major Minor
A7 Paired components not symmetrical in shape or position Major Minor
A8 Hi Lo over 0.5cm, 2 pockets / yoke seams Major Minor
A9 Collar points which vary more than 2.5mm Major Major
A10 Uneven placket width Major Major
A11 Top and bottom placket uneven in length by 3 mm+ Major Major
Sewing
Code Defect Zone A Zone B
S1 Run off stitching, over 2 steps Major Minor
S2 Twist seam (roping) Major Minor
S3 Puckering Major Minor
S4 Open seam (non-inclusion) Major Major
S5 Wrong sewing thread Major Minor
S6 Skip stitch Major Minor
S7 Broken stitch, over 1 step for washed garment Major Minor
S8 Drop stitch (knit wear) Major Major
S9 Wrong tension Major Minor
S10 Raw edge over 1cm (over locking) Major Major
S11 Distortion Major Minor
S12 Un-slightly over-lapping stitch (untidy joint) Major Minor
S13 Misalignment over 0.3cm Major Minor
S14 Needle damage Major Major
Button / Stud/ Buttonhole / Keyhole
Code Defect Zone A Zone B
B1 Incorrect size of buttonhole/keyhole for button/stud Major Minor
B2 Button/Stud and buttonhole not aligning Major Major
B3 Button and buttonhole position not as specification required Major Minor
B4 Incomplete stitching or uncut buttonhole/keyhole Major Minor
B5 One or more skipped stitches in buttonhole Major Minor
B6 Buttonhole fraying causing button to catch on thread Major Major
B7 Buttonhole poorly stitched affecting appearance Major Minor
B8 Engraved button/stud placed upside down Major Minor
B9 Buttonhole/Keyhole fraying around edges Major Minor
B10 Button or buttonhole thread color different to specification Major Minor
B11 Not attached securely Major Major
28. Writing QC reports
NN Fashion QC must complete and sign all copies of inspection reports. The inspection report
will be sent to NN Fashion office the next working day after inspection. QA Manager must sign
all summary sheets upon return to office and pass the report to merchandisers for shipping and
accounting processing.
QC Inspector must complete a 3 page final inspection report to include:
1. Workmanship Inspection Report
o List comments on all points of workmanship which do not meet required standards together
with a final result Passed / Failed.
2. Measurement check report
o A full measurement report records the measurement of at least 3 pieces in each size. If a
measurement falls outside the zone of tolerance, it is circled.
3. The shipment letter (Summary Page with packing details)
o Indicates the final result upon which the QC has agreed.
The supplier will be asked to sign the reports and receive a copy. The shipment release letter
(SRL) will only be released once results have been reviewed and shipment released.
Accepted
o All sheets to be signed by supplier and a copy of the SRL passed over for release of shipment.
Reject
o If the goods do not pass inspection, the QC Inspector cannot release the SRL to the supplier.
Without the shipment release letter, factories have no authorization to ship the goods
This report must be filed at the front of the case file and the file returned to Merchandising
within a maximum of 1 day following inspection.
In case it takes time to transfer the report to office, QC should fax or email the reports to the
attention of the merchandiser no later than 1 day following the inspection.
29. Closing Meeting after inspection
Immediately following the QC inspection, NN Fashion QC will hold a meeting with factory
production personnel to review the result of the inspection.
An authorized representative of the factory must sign the inspection reports to acknowledge their
understanding of the QC report:
Understand and review all findings of NN Fashion QC staff
Raise questions and suggestions
Liaise with production staff and main office to solve problem
Inspection results
The NN Fashion QC indicates the inspection results clearly on the QC reports. Merchandising
follows up with factory and /or customer if the shipment day is affected.
Passed
The shipment is released.
The Shipment Release letter will be released to factories.
Files can be returned to Merchandising after QC manager sign off copies of final inspection
report.
Rejected
In case the shipment is rejected, the factory management and QC have to agree a corrective
action.
Repairable
If possible the factory must repair the faults and a second final inspection be arranged.
If the goods can be repaired quickly or out sorted as only a small percentage.
The factory will then proceed with this process immediately, and a 2nd final inspection arranged.
Non-repairable
QC reports the case to QC manager and Merchandising
Merchandising advises customer to see if the defect can be accepted or not.
Merchandising follows up with the supplier afterward.
Following is the possible outcome:
o Customer takes in the goods with discount
o Style cancelled and not replaced
o Style to be replaced
Repairable but time not allowed for the same shipment date to be maintained
QC advises QC manager and the merchandiser of this situation
Merchandising follows up with the supplier for a solution
Merchandising informs the customer of a late shipment and obtains their further instruction.
Following is the possible outcome:
A new shipment date agreed with the customer.
If the customer will not agree to a delayed shipment, an agreement must be reached between
customer/ NN Fashion /Factory about “how to ship”.
Send to Customer for further comment. Customer may accept goods or they may require a
discount to accept
Signatures
QC - must sign all copies once supplier signed.
QC Manager - must sign all summary sheets upon return to office.
30. Shipment release procedure
Purpose
To ensure the shipment is released to the forwarders with proper NN Fashion QC sign off.
Scope
No shipment should leave the country without passing our QC inspection. All related
departments work closely together to ensure no faulty lot to be shipped to customers.
Responsibility
QC issues Shipment Release Letter, SRL when the shipment passes final inspection
The vendor has to present this SRL to the forwarder together with the cargo.
The forwarder cannot take in any merchandise if the factory can present this shipment release
letter when they deliver the cargo to the forwarder.
Procedure
Issue of shipment release letter - QC issues the SRL if the final inspection is passed. This SRL
should be printed on copy paper with 2 copies behind the original and handed to the following
parties:
o Original - stays in the QC File
o First copy – give to the vendor on site
o Second copy – to Shipping Department within 2 working days after the inspection
day.
The vendor and QC should sign the SRL at the factory; no QC manager signature is required at
this point. QC manger will sign the SRL when QC handover the file to office.
Pass the SRL to the forwarder - the vendor passes the ORIGINAL COPY of the SRL to the
forwarder and keeps a photocopy as own record.
Physical copy / e-mail: In case physical handover is not possible or practical, the vendor can
request Shipping department to routinely e-mail the SRL as an attachment to the forwarder.
Expenses related to shipment cancellation: The vendors are responsible for any additional
expenses related to shipment cancellations, due to failed inspections, late or missing SRL’s. Most
vendors can cancel the shipment booking up to 2 days before closing time without additional
charges. However, different regulations might apply for different forwarders and countries.
Processing by the FORWARDER - the customer’s Forwarder should accept cargo, only if
vendor can present the original copy of the SRL to them. If goods arrive without such SRL, they
should contact our Shipping department for confirmation.
Failed inspections: In case the goods failed to pass final inspection, QC will stop the
shipment at the factories. The shipping department will also notify the forwarder accordingly to
cancel the shipping booking and ask them not to accept the cargo.