PPDS S4 Features
PPDS S4 Features
Planning)
Jomerce PJ SAP
SAP S/4HANA
Why PP/DS
PP/DS supports various features, that is considered
as very advanced features
What’s new
PP/DS for S/4HANA has made several improvements
Standalone SCM-APO-PP/DS to simplify CIF in one
system, eventhough its not completely eliminated.
Improvements are made in following topics
Implementation considerations
The concept for PP/DS for S/4HANA starts with
classifying if a material is relevant for advanced
planning or not.
It is recommended that all downstream materials
should be Advanced Planning-relevant if planned
together with MRP Live. This means the data
modelling should be such that once a material at one
BOM level is PP/DS-relevant (Advanced Planning-
relevant), then the materials above that BOM level
should also PP/DS-relevant (Advanced Planning-
relevant). This is to ensure that depended demands
are also in liveCache or PP/DS.
Plant(1610 only)
Source of supply for external
procurement(purchase info record, contracts,
scheduling agreements)
Classes and characteristics in case of using
CDP(characteristics depended planning) using
integration model for organisational area
Setup groups
Maintenance and network orders(material
Independed)
more.. (HINT: To see what all objects needs
integration model in Txn CFM1, and in Logical
System male the entry of same logical
system(own logical system) and press ENTER)
Parameter efficiency
Extended order generation (EOG)
Multiple output planning (MOP)
TABLE : MATLOC:
PP/DS Horizon
Alternative : use
in Calendar
CONVH value from Model
Days
Used by standard
heuristic
Requirements SAP_PP_014.
Ascertainment Ascertaining
CTHOR
Horizon in Pl.Ind.Requirement
Workdays s. You can
maintain this in
Heuristics settings.
Strategy for Always considered
Container
CONRESS
Resource-
TRAT
based Pegging
Quantity Propagation By
CONF_PROPAG
Confirmations
ATION
CONF_DURATIO /SAPAPO/
N DM_CONF_DURATION
Table : MATRQ:
Defaulted to Max
value. Alerts are
Maximum
the way forward.
Allowed
Not used in
PEG_PAST_M Lateness for a
netting
AX Receipt
calculation. Only
Element
used in dynamic
pegging.
Maximum Defaulted to Max
Allowed value. Alerts are
Earliness for a the way forward.
Receipt
Not used in
PEG_FUTURE Elementequire netting
ments
_MAX calculation. Only
Ascertainment
used in dynamic
Horizon in
Workdays
pegging
Always False.
Alternative : In
case custom
solution needs to
be achieved, it
could be solved
Deactivate by an extension
PEG_NO_DY
Dynamic with the heuristic
N
Pegging framework of
PP/DS. you need
to have to copy
the standard lot
heuristics and in
the copy turn off
dynamic pegging.
TABLE: MATLOTSZ
Use Always
from product
Target
master. User
/SAPAPO/ Stock Level
Option
TARGET_METHOD Method
available in
Heuristics.
Alternatives:
Forecast Management
Since PP/DS is the only APO solution embedded with
S/4AHANA, it it required to have forecast
management and creation in S/4HANA and integrate
that with PP/DS. You will have to adopt you business
process to achieve this.
Forecast Consumption
Consumption period is calculated in calendar days in
PP/DS for SAP S/4HANA and in working days in SAP
S/4HANA. Also it should be noted that since the
consumption BAdI’s are not available, its not possible
to also have a working day calendar set to enable
consumption in working days.
Alternatives:
A new consumption type “5 – Period-Based
Consumption“ is also supported which will support
Forecast periods into account for consumption. For
more details refer SAP Note 2567437 – Forecast
consumption with mode 5 (Period-Based
Consumption) for Advanced Planning materials
Subcontracting
Subcontracting is modeled with subcontracting MRP
areas for components in PP/DS for SAP S/4HANA,
inline with S/4HANA modelling. Subcontracting is only
supported with rough cut planning. So a finite planning
of subcontractor is not possible
Alternatives:
In case it is needed to have finite scheduling model for
subcontracting some work around like below could be
evaluated.
Alternatives:
PP/DS Deployment Multiple
SAP_DEPL_MUL Products
PP/DS Deployment Single
SAP_DEPL_SNG
Product
Planning Shortage Quantities
SAP_PP_CTP
for CTP
Stage-Numbering Algorithm
SAP_SNP_LLC
for SNP
Propagation of descriptive
SAP_PP_023
char. Values
Planning of Shortage
SAP_PP_003
Quantities
Migration Options
There is no standard migration tools available yet for
To migrate PP/DS for SAP S/4HANA. But there are
few options to help.
Fiori Apps
Following Fiori apps are delivered with PP/DS for SAP
S/4 HANA.
Shift management
From S/4HANA OP1709 onwards there is a Fiori App
to manage shifts (Monitor Capacity Utilization – Object
Page) for PP/DS for S/4HANA. This powerful app
helps you to change the shifts and operations in
simulation mode and then see capacity
situation/utilization depending on different parameters
like order type, materials to adapt the changes
Combined Orders
From S/4HANA OP1709 onwards order combination
for production/process orders are supported. The
details can be found in PP/DS Help Landing Page: