This is a peaking inspection report from Siemens for a client. It documents the inspection of a tank, including the tank number, description, applicable code, date, and drawing number. It lists 25 inspection points on the tank identified by weld number, and whether each point was accepted or rejected based on permissible deviation measurements at points A, B, and C. The report was prepared by a Siemens engineer and signed off by the client.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
417 views
Peaking Inspection Report
This is a peaking inspection report from Siemens for a client. It documents the inspection of a tank, including the tank number, description, applicable code, date, and drawing number. It lists 25 inspection points on the tank identified by weld number, and whether each point was accepted or rejected based on permissible deviation measurements at points A, B, and C. The report was prepared by a Siemens engineer and signed off by the client.