0% found this document useful (0 votes)
417 views

Peaking Inspection Report

This is a peaking inspection report from Siemens for a client. It documents the inspection of a tank, including the tank number, description, applicable code, date, and drawing number. It lists 25 inspection points on the tank identified by weld number, and whether each point was accepted or rejected based on permissible deviation measurements at points A, B, and C. The report was prepared by a Siemens engineer and signed off by the client.

Uploaded by

Faizan Raza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
417 views

Peaking Inspection Report

This is a peaking inspection report from Siemens for a client. It documents the inspection of a tank, including the tank number, description, applicable code, date, and drawing number. It lists 25 inspection points on the tank identified by weld number, and whether each point was accepted or rejected based on permissible deviation measurements at points A, B, and C. The report was prepared by a Siemens engineer and signed off by the client.

Uploaded by

Faizan Raza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

SIEMENS PEAKING INSPECTION REPORT CLIENT

Tank No. : Description : Report No:

Dwg. No. : Applicable Code : Date:

Peaking Permissible Deviation in Course No.


Inspection Points Accepted /
S. No. Weld No. Remarks
A B C Rejected

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

PREPARED BY SIEMENS CLIENT

Name

Date

Sign

SPE/103/003