Factory Drawings
Factory Drawings
1 1a 2 3 4 5 5a
Feb 15, 2023 - 3:13pm
F5
F11
A
A1 F1 F1 F1
F4
F2 F3 F3 F3 F2
SCHEDULE OF FOOTINGS
F2 F3 F3 F3 F2
C
00 FEB 2023 ISSUED FOR CONSTRUCTION M.A
CLIENT:
CENTURY MECHANICAL
SYSTEMS FACTORY W.L.L
E DIWAN AL EMARA
ARCHITECTS, ENGINEERS & PLANNERS
POST BOX NO: 22235 I DOHA I QATAR
TEL NO : 4483 3195 I 4483 3620 I FAX- 4483 3196
Email: [email protected]
F3 F3 F3
UNii Engineering Consultancy
F12 F2
F Tel: +974-4-4146652
Fax: +974-4-4146653
P.O. Box: 11490 - Doha
Email: [email protected]
Website: www.uniidesign.com
Address: 20th Floor, Palm Tower,
Majlis Altaawon St., WestBay, Doha, Qatar
MAIN CONTRACTOR:
G F7 F13
F14
F7
IMAR ISTANBUL
Twin Palm Tower B, Office 3601, Floor 36 West Bay, Doha / Qatar
t:+974 44696238 [email protected]
f:+974 44696238 www.imaristanbul.com
H F9 F10
GRADE GRADE
CONSULTANT REG. NO. 22592 CONSULTANT REG. NO.
A
H2 F8
CONSULTANT STAMP & SIGNATURE CONSULTANT STAMP & SIGNATURE
F5 F9
F5 F5
J
F15
F9 F8
F5 F5 TECHNICAL MANAGER: TECHNICAL MANAGER:
SIGNATURE
Scale - 1:150
CAD FILE 230215 - 01 NH RC FOundation - Factory.dwg