Assignment4 Casting
Assignment4 Casting
2. Which among the following factor affects the pouring time of the casting?
a) Location of riser
b) Porosity of sand mould
c) Fluidity of casting metal
d) Area of pouring basin
4. Which among the following is correct regarding the functions of gating system?
a) Time taken for pouring or filling of molten metal into the cavity should be minimum as
possible
b) Time taken for pouring or filling of molten metal into the cavity should be as
maximum as possible
c) It ensures the filtration of impurities present in molten metal.
d) It ensures smooth and quiet entry of molten metal inside the cavity.
6. In a sand casting process, a sprue of 10 mm base diameter and 250 mm height leads to
a runner which fills a cubical mould cavity of 100 mm size. The volume flow rate (in
mm3/sec) and the mould filling time (in second) are
a) 0.8× 105, 2.8
b) 1.1× 105, 7.54
c) 1.7× 105, 5.78
d) 2.3× 105, 8.41
8. Which of the following statement(s) is/are correct for unpressurized gating system?
i.
gating system.
ii. It reduces turbulence in the gating system.
a) i only
b) ii only
c) Both i & ii
d) None of the above