HPC at VUP Transition

The document shows a diagram of a proposed pipe culvert with dimensions. It includes a 16,000 mm wide viaduct with 6,000 mm slip roads on either side. Below is a cross section showing the culvert structure which is 1,200 mm in diameter surrounded by compacted granular material or concrete. Earth fill and stone pitching are used to support the structure and road above.

Uploaded by

Shivam Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

HPC at VUP Transition

The document shows a diagram of a proposed pipe culvert with dimensions. It includes a 16,000 mm wide viaduct with 6,000 mm slip roads on either side. Below is a cross section showing the culvert structure which is 1,200 mm in diameter surrounded by compacted granular material or concrete. Earth fill and stone pitching are used to support the structure and road above.

Uploaded by

Shivam Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

30000 TOTAL WIDTH

16000 ROB VIADUCT


6000 500 FRL 500 6000
SLIP ROAD KERB KERB SLIP ROAD
SLOPE* SLOPE*
U/S SLOPE 2.5 % SLOPE 2.5 % D/S

CRUST CRUST HEAD WALL


IN PCC M20
EARTH FILL 300 THK DRY STONE
EARTH FILL EARTH FILL PITCHING OVER
150 THK GRANULAR
2 2 MATERIAL BACKING
BED LVL 1 INV. LVL.(U/S) INV. LVL.(D/S) 1
SLOPE 1 IN 1000
300
1500 3000

COMPACTED GRANULAR ℄ OF STRUCTURE 300 THK STONE


PITCHING FOR APRON
MATERIAL OR PCC M15
SECTION A-A
RUBBLE FILLING INCLUDING
FILLING VOIDS WITH SAND/GRIT

℄ OF STRUCTURE

SLOPE 2:1 6000 B 500 16000 500 6000 SLOPE 2:1

SLOPE 2.50% SLOPE 2.50% SLOPE 2.50% SLOPE 2.50%

℄ OF STRUCTURE
6400 (LENGTH OF HEAD WALL)
A U/S D/S A

COMPACTED GRANULAR
MATERIAL OR PCC M15

SLOPE 2.50% SLOPE 2.50% SLOPE 2.50% SLOPE 2.50%

SLOPE 2:1 SLOPE 2:1


B

DRAWING TITLE

GENERAL ARRANGEMENT DRAWING OF NEW PROPOSED PIPE


CULVERT 1X1200 mm UNDER ROB PORTION