Module 10.2 Testing of Usefulness
Module 10.2 Testing of Usefulness
ToC
Materiality
Risk assessment and Accept-reject
response sampling
U
n
d
e Risk Register
r
Lead schedule
s SToD: Testing
SToD: Approach &
t single/once off
accumulation per target
a achievements
n
SToD: Testing
d
C,M,R,P&D
i
n SToD: Testing per
SToD: Testing per
popultation
g
population
Adjustments
Overall
Conclusion Evaluation of uncorrected misstatements and concluding
summary
For SM per indicator For SM per target Per target Per population per assertion
①
Usefulness assertions
Usefulness assertions
Usefulness
CMRP
Rule - Consistency
For discussion:
Verifiable 1. Are TIDs required for an
indicator to be well-defined?
2. What does specific imply?
3. Is time-bound implied due to
inclusion in an ANNUAL
performance plan
4. What if no documented
processes and policies?
Must be predetermined and consistently
applied by auditee throughout the year
Rule - Measurability
Well defined For indicator (and its targets):
• Possible to verify the
Verifiable processes and systems that
produce the indicator
For discussion:
• What is the link with
existence of systems, if any?
Test whether
• a comparison between planned and actual or
current and prior year performance have been
disclosed in the annual performance report
• measures taken to improve performance have
been disclosed in the annual performance report
• the reliability of the measures taken to improve
performance tested to corroborating source
documentation
Rule -
Presentation and disclosure
Uncorrected
Communicate Adjustments misstatements
Audit
all by per target –
adjustments
misstatements management? transfer to
Evaluation WP
Evaluating usefulness misstatements
NB
ToC
Materiality
Risk assessment and Accept-reject
response sampling
U
n
d
e Risk Register
r
Lead schedule
s SToD: Testing
SToD: Approach &
t single/once off
accumulation per target
a achievements
n
SToD: Testing
d
C,M,R,P&D
i
n SToD: Testing per
SToD: Testing per
popultation
g
population
Adjustments
Overall
Conclusion Evaluation of uncorrected misstatements and concluding
summary
For SM per indicator For SM per target Per target Per population per assertion
Exercise
Go to the folder: Course material/Module 10 AOPO
Open the working paper:
“SToD - AoPO - CMRPD DFF”