This call off is for additional scope of work on the Zubair Oil Field Development Project water injection network installation, including: 1. Installation of 5 additional open cut railway crossings for a 12" gas line (payable as goodwill agreed by Contractor only). 2. Installation of 1 additional tie-in to the HM existing water injection outlet. The value of this call off is $300,000 USD, bringing the cumulative call off total to $59,551,311.39 USD. The completion date for the railway crossings is July 31, 2018 and for the tie-in is May 21, 2018.

Uploaded by

Mohammed Hijazi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views

Untitled

This call off is for additional scope of work on the Zubair Oil Field Development Project water injection network installation, including: 1. Installation of 5 additional open cut railway crossings for a 12" gas line (payable as goodwill agreed by Contractor only). 2. Installation of 1 additional tie-in to the HM existing water injection outlet. The value of this call off is $300,000 USD, bringing the cumulative call off total to $59,551,311.39 USD. The completion date for the railway crossings is July 31, 2018 and for the tie-in is May 21, 2018.

Uploaded by

Mohammed Hijazi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Zubair Oil Field Development Project

EPC for Water Injection Network Installation

Contract No. 5000008451

Call - Off 21 ( Revision 1)

Issued 20th May 2018

5 Additional Railway Crossing for 12" gas Line and 1


Additional Tie in to HM existing WI out

Page 1
~ rl1l n n lieal <q] Ib~
WTC - Tower B

• Strawlnskylo!leln 1725
1.077 XX Arn!Otor"dam
Th@ Netherl~nds
Tel: +3120 5707100
Fi!IIx: -+-31 20 570 7170

ZUBAIR PROJECT -IRAQ - WI Network Installation

CALL OFF
To: Drake and Scull international PJSC Contract Ref.: 5000008451 - WI Network Installation.
P.O.box 65794 - Dubai - UAE.
Call Off No.: 21 Rev 0
Att. Mr A. Eissa (PD)
Att. Mr M. Shaker (PM) 5 Additional Railway Crossing for 12" gas Line and 1 Additional Tie in to HM existing WI out

Attachments:

1) Description Of Work to be Performed


2) Call Off Calculation
3) ACV progress
4) CONTRACTOR OFFER

Schedule & Milestones Effective Commencement date of this WO Commencement date:


51
01 June 2018
----------------------------------------- ----------------------------------------------------
Scheduled Complete date: 31 July 2018

Work Order Values -TOTAL Value of previously approved Call Offs $ 59,251,311.39

$ 300,000.00
Value of this Call Off (USD)

Cumulative Call off to Date (USD)


$ 59,551,311.39
,

Description of the Work: Installation of additional 5 Crossing open cut (payable as good will proposed and agreed by Contractor 4.3159839
only) for 2 lines 12" gas railway crossing and additional 1 Tie in HM existing WI out respectively - Annex A1.2 & A4.2 in accordance with
00250600BGSC95048- Appendix D Technical Specification SOW REV 4 (Article 8 - Engineering, Procurement, Construction, pre-
commissioning, commissioning and Start up) annexes, deliverables and Aooendix A - Compensation

Invoicing and payments -In accordance with the Terms and Conditions of Contract - 5000008451 - Annex A1.2b & A4.2 respectively Flow
lines and Crossings of Appendix-A and its annexes.

Approved bv Company Contract Holder Approved by Contractor Representative

Name Loris Tealdi Name

Signed Date Signed Date

Page 2
~ !f1l n n If ca1<q] Ib>~
WTC - Tower 6

• Str~V'llnskylean 1725
1077 XX Am!:terdarn
The Netherlelnds
Tel: +31 20 570 7100
Fax: +31205707170

CALL OFF 21 REV 1

Installation of 5 Crossings and 1 Tie in


SUMMARY of SOW

ENGINEERING PROCUREMENT, INSTALLATION,PRE-COMMISSIONING, COMMISSIONING AND START UP OF WI


FLOWLINES

Please refer to the original SOW #00250600BGSC95049 - Appendix 0 Technical Specification SOW REV 4
Paragraph 2 Scope of Work Executive STRATEGY, paragraph 4.1,5.3,5.4 and 5.5 SoW for Water Injection Flowlines
and paragraph 8 Engineering, Procurement, Construction, Pre-commissioning, Commissioning and Start up.

COMPANY requires to perform:

1. 5 No Open Cut Crossings (payable as good will agreed by Contractor 4.3159839 only)
2. 1 WI Tie-ins

The WORK includes all the Project Management, Engineering, Procurement, Construction, Pre-Commissioning,
Commissioning and Start up.

COMPANY will free issue to CONTRACTOR the majority of material to be installed, as mentioned in Contract.
CONTRACTOR shall supply remaining material, minor and plant and consumables as described in Appendix 0, Annexes
of Appendix A and deliverables.

CONTRACTOR shall supply material as required by appendix 0 and Appendix A and deliverables of the Contract based
on MTO that shall be checked and revised by Contractor during engineering phase.

CONTRACTOR shall be responsible to collect and transport issued material to his premises or installation place.

The CONTRACTOR, for this Scope of WORK, shall be responsible for defining all the interfaces between these facilities
and other existing/new facilities.

Contractor shall be responsible to define routing of lines and/or endorse Company's preliminary route or corridor.

In addition, the tentative schedule shall be subjected to availability of COMPANY supplied material.

SCHEDULE

Completion date shall be tentatively as below:

1) 12" railway crossings 31/07/2018


2) Tie in additional in HM Existing 21/05/2018

Contractor have 15 days from approved Call off to revise/confirm the completion dates.
In case Contractor will not achieve the completion date LD's shall be applied, counted on the portion of work value subject
to delay only.

All the works shall be completed in full compliance with Article 34 of the Contract General Conditions and Article 27 of the
Contract Special Conditions.
Company reserve the right to change the location if necessary according to Oil field development indication.

Page 3
<e fill n n If cal <q] Ib~
WTC - Tower 6

• Strc!lwinskyloon 1.725
1077 XX AmstordoOm
The Netherlemds
Tel: +31 20 570 7100
Fox: +31205707170

PAYMENT BASIS

PAYMENT BASIS - APPENDIX A - ANNEX A1.2 - WI flow lines tie ins inside existing DGS/facilities - LS

A1.2 - WATER INJECTION TIE INS ACTIVITIES - LUMP SUM PRICE (LS)

In accordance with the distinct activities related to WATER FLOWLINE TIE-INS into WATER DISTRIBUTOR Remote Header or DGS Extended manifolds as defined ~thin Appendix D.
Price includes all operations to complete the execution of the works as reported in Appendix A Compensation and SOW - Appendix D

(A) (B) (C) (D) (E) (G) (H) (I)

U.M. Price ea. (USD Tolal Price (USD


ITEM DESCRIPTION Optional QTY Cia/inch Range Noles
LSlTie~n $) $)

Tie-in W.I. Unes #1500 to existing


Facilities (DGS'S)lsloUmanifold #1500-
CiviUMechlPipingiStructuraUE&1 Lump Lump Sum Price in accordance with
Wt-TIE-OOl
Sum (LS). Company free issue material:
ea. 14 $146,335 $2.046,697 NIA
Appendix A & D section 5.7 & 5.6
line pipe, piping, manual and actuated
valves

The above price include Engineering, Procurement, Installation, pre-commissioning, commissioning and start-up of 1
Tie-ins in existing OGS/facilities.

APPENDIX A - ANNEX A4.2 -Installation of Crossings - UP


A4.2· Main Crossings Thrust Boring/Open cuts UNIT PRICE (UP)

trhe plice I:st contains Canals, Roads and Ra.!ways to be crossed by trenchles.s me~od (thruS1bOnng or Auger bonng) and open cuts CONTRO\CTOR shall perform necessary .enflcat!ons in order to define type and length fOf supp:'
Iof ma:enal Jnd realise the crOSSings. TOOSOW worl<s is summar-ed w::h:n U1edescrtptlOn: for de!3:led bre3kdo"Nn of 3ct'l'tt!eS refer to SOW-Appe.nd!x 0

Crossing pnce Includes aUoperations to complete the execution of the 'Io'OJ1ls but nOll1Rl1ted10
Management and !le""lCeS, J~Ipermlts from a authoritIes, teams mob::~sa~on, suppty d aMthe petm3OI!flt mbltatlon ma:enals (e" c..1WIO, collar spJcer, end sell. venl, dra:n, etc. as defined but not I:mited to the SoW and attached
standard draw-ngs), conSnJction of the pipe!:ne cr03s:n-~ w-~ fu~ responsibil!oJ fer any darr-age to the crossed faa~1Jesincludes srte prepJralion. in tmc transportation for a!1malenal & eQu:pments. right of way preparatoo, ~0:1
investigation. Plpel'ne crOSSing mJ~enJI transport:Jtion, p:pe:ine cross:ng MANUAl eXC3'13jon, p:petne crossing fallncation and tie-in, v.-eld;ng. NOT. y,.-eldedjamt cOJtings app~J, 1'101:d31de:ecton test. p:pe!'ne crossing lo'A'enng In
:renCh. sand beddJOQ. sand padding. protection Ilef>Neen (he new and the eXI5tng P'Pe(b, concre1e slab Insta'13tlOn or casmQ). p;:pehne bJcUi:llnlJ. Tc~t!nCJ. sign m3~er suppll' and Instill! (f.lbncahon 3nd ercct:on). cle:lO up.
re!flsta!ement of wooing Site, as but:! documenb:1on. comp.!etel:nal techOlcal dOSSierand (Jeneral demobjl1Za~:onfor the fob bsk. as per COmpany speCification For p:pel:ne crOSSJr.gse."(ecu!ed by bonng, tl1e fOe ~h.J1Ibe laId In
protective HOPE conduit The HDPE conduil shall be 13:dalong w;!h the p;pehne
Price incrudes a:1opera~s to comp!ete the execu:.OO of the 'NorJ\s as reported in AppendJy.A Compen53~'OOand SOW - AppendiX 0

(A) (8) (e) (0) IE) (G) IH) (I)

ITEM DESCRIPTION
U.M. PRICE ca. Total Price
Firm SoWOTY Ola/inch Range Notes
UP/Crossinll IUSOSI IUSOSI

IFirm SOW) UNIT RATE Pnco in


WI-CRS-{)Ol One Crossing Trust bonng Wi:h Caslflg pipe ea. $68.557 S137.114 N/A accordance wrth AppendiX A & 0
sectlon 513

(Firm SOW) UNIT RATE Pnce in


WI-CRS-{)02 Road Crossing open cui up ea. $35.604 $71.207 N/A accordance with Appendi;( A & D
section 513

The above price include Engineering, Procurement, Installation, pre-commissioning, commissioning and start-up of 5
crossings for railway change on specification.

Page 4
~ If1l n n If @l <q] It»'W
WTC - Tower B

• Strawlnt>kyllllan 1725
.1077 XX Amstardarn
The Netherlonds
Tel: +3120 5707100
Fax: +31205707170

Call Off 21 Calculation

CALL OFF 21
5 Crossing
A4.2 - Main Crossings - WI-CRS-002 Open Cut
PRICE BREAKDOWN SCHEDULE Payable
4.3159839
ITEM ITEM L1 DESCRIPTION
Full SoW

0.0 PROJECT MANAGEMENT AND SUPPORT ACTIVITIES

-_----- "~.-.-
O.Oa Project Management $1,068.11

O.Ob Support Activity $712.07


-----_-_--- --_- -

1.0 ENGINEERING $1,780.18


,--- .-
MATERIAL SUPPLY $3,560.36
2.0
---- -- --- -_ - --------- - -------- ----------------- -

3.0 INSTALLATION $26,702.69


,_---- ---_ -
4.0 PRE-COMMISSIONING, COMMISSIONING AND START UP
,--
4.0a Mechanical Completion Dossier documentation $1,780.18
---_-- _. .-- --_-- ---_-- -- -

--- - ,- _ - ----- ----------_-- . _ .. ----

TOTAL Relative Weight (per each crossing) $35,603.59

5 Crossing OC (payable as agreed by Contractor 4.3159839 only) $153,664.52

Page 5
~ rill n n Ii Cd)<qJ Ib>~
WTC - Tower B

• Str<"iwlnskyl~on 1 725
1077 XX Amstord",m
The Netherlonds
Tel: +31 20 570 7100
Fax: +31 20rS_7_0__ 7_'_7_0 ~

CALL OFF 21

A1.2 - Water Injection Tie-in Activites - WI-TIE-001 1Manifold Tie in


PRICE BREAKDOWN SCHEDULE -LUMP SUM PRICE (LS) SoW

ITEM LO ITEM Ll ITEM L2 ITEM L3 Description Full SoW


0.0 PROJECTMANAGEMENT AND SUPPORTACTIVITIES

O.Oa Project Management $4,390.06


O.Ob Support Activity $2,926.71

1.0 ENGINEERING

LOa Survey $1,097.52

LOb Civil Plot-Plan/Layouts and Details $1,463.35

1.0c Piping Plot Plan/Welding Map/Isometric/Piping Layouts $2,560.87

1.0d Detailed bill of material $1,463.35

1.0e As Built documentation $731.68


2.0 MATERIAL SUPPLY
---+---------~-- --~-- ---jl------~-.-~----~~-~~-~-~~~~~~~--~
--~--~~-.~-.~-- ~--~~--~-~~~
_~ ~_~~.
__~
2.0a Material Take off $2,195.03
- - ,-~~~-
2.0b Purchase Order Placed $5,853.42
2.0c Material on Site $6,585.10
3.0 INSTALLATION
3.0a Civil and Structural Works $30,730.45
3.0b Piping, supports, Equipment and Painting Works $51,217.43

3.0c Mechanical Completion dossier $10,243.48

3.0d 'Fi~al Mechanical Hook-up and tie-ins $10,243.48


4.0 PRE-COMMISSIONING, COMMISSIONING AND STARTUP
~~------ I-------~------II
4.0a Pre-commissioning $7,316.77
_"-------------------

4.0b Commissioning and Start-up $7,3i6.78

TOTAL PRICE $146,335.48

1 Additional Tie in in HM existing $ 146,335.48

Page 6
~lf1ln nrr@l<qj Ib~
WTC - Tower B
Strawinskylaeln 1725
1077 XX Amsterdam
The Netherl8nds
Tel: +31 20 570 71.00
Fax: +31 20 570 7170

Contract Call Off Progress

Contract 5000008451 DSI PJSC


CO# Description Amount
1 Mobilization $ 748,126.22
2 Installation of 32.6(OPT) km of WI 10" U/G Flow Lines $ 7,742,359.82
3 Prefab.& Install. of nr. 11 (OPT.) WI 10" Well Head $ 8,041,711.26
4 Installation of no 3 TB + 23 OC Crossing (OPTIONAL SoW) $ 1,030,922.69
5 Inst.nr.6 WI Tie ins in exist.DGS (OPTIONAL SoW) $ 878,012.88
6 Top up materials (cost plus fee) $ 543,106.23
7 Top up materials (cost plus fee) $ 1,895,063.41
8 Material for DGS N interconnecting (cost plus fee) $ 1,449,748.92
9 DGS N interconnecting 3.2 km Trunkline 18" and Tie in in HM Existing $ 1,269,320.39
10 Water-Injection 9.2 km Trunk lines Network North Area $ 3,551,560.34
11 Installation of no 3 TB + 6 OC Crossing $ 421,899.33
12 Inst.nr.2 WI Tie ins in existJacility $ 292,670.96
13 Water-Injection 10.2 kmTrunk lines Network South West Area $ 4,042,048.32
14 RAW GAS 4.2 km Interconnecting from ZM to PPG $ 8,268,201.57
15 RAW GAS 22 km Interconnecting from HM IPF to PPG $ 9,063,787.00
16 INTERNAL CO for VO 001 Water out inside DGS N $ 2,597,638.33
17 River & Rejected Water Interconnecting fm ZM to PPG $ 2,784,621.00
18 Installation of 15 km of WI 8"&12" U/G FL + 3 TB+14 OC $ 4,270,934.00
19 PPG nos. 10 OC crossings at PPG area $ 284,828.72
20 Drilling of bored piles in DGS N (Cost plus fee) $ 74,750.00
21 5 Add.Railway CrossJor 12" gas Line and 1 Add.Tie HM existing WI out $ 300,000.00

Total Call Ofts 59,551,311.39