Untitled
Untitled
Page 1
~ rl1l n n lieal <q] Ib~
WTC - Tower B
• Strawlnskylo!leln 1725
1.077 XX Arn!Otor"dam
Th@ Netherl~nds
Tel: +3120 5707100
Fi!IIx: -+-31 20 570 7170
CALL OFF
To: Drake and Scull international PJSC Contract Ref.: 5000008451 - WI Network Installation.
P.O.box 65794 - Dubai - UAE.
Call Off No.: 21 Rev 0
Att. Mr A. Eissa (PD)
Att. Mr M. Shaker (PM) 5 Additional Railway Crossing for 12" gas Line and 1 Additional Tie in to HM existing WI out
Attachments:
Work Order Values -TOTAL Value of previously approved Call Offs $ 59,251,311.39
$ 300,000.00
Value of this Call Off (USD)
Description of the Work: Installation of additional 5 Crossing open cut (payable as good will proposed and agreed by Contractor 4.3159839
only) for 2 lines 12" gas railway crossing and additional 1 Tie in HM existing WI out respectively - Annex A1.2 & A4.2 in accordance with
00250600BGSC95048- Appendix D Technical Specification SOW REV 4 (Article 8 - Engineering, Procurement, Construction, pre-
commissioning, commissioning and Start up) annexes, deliverables and Aooendix A - Compensation
Invoicing and payments -In accordance with the Terms and Conditions of Contract - 5000008451 - Annex A1.2b & A4.2 respectively Flow
lines and Crossings of Appendix-A and its annexes.
Page 2
~ !f1l n n If ca1<q] Ib>~
WTC - Tower 6
• Str~V'llnskylean 1725
1077 XX Am!:terdarn
The Netherlelnds
Tel: +31 20 570 7100
Fax: +31205707170
Please refer to the original SOW #00250600BGSC95049 - Appendix 0 Technical Specification SOW REV 4
Paragraph 2 Scope of Work Executive STRATEGY, paragraph 4.1,5.3,5.4 and 5.5 SoW for Water Injection Flowlines
and paragraph 8 Engineering, Procurement, Construction, Pre-commissioning, Commissioning and Start up.
1. 5 No Open Cut Crossings (payable as good will agreed by Contractor 4.3159839 only)
2. 1 WI Tie-ins
The WORK includes all the Project Management, Engineering, Procurement, Construction, Pre-Commissioning,
Commissioning and Start up.
COMPANY will free issue to CONTRACTOR the majority of material to be installed, as mentioned in Contract.
CONTRACTOR shall supply remaining material, minor and plant and consumables as described in Appendix 0, Annexes
of Appendix A and deliverables.
CONTRACTOR shall supply material as required by appendix 0 and Appendix A and deliverables of the Contract based
on MTO that shall be checked and revised by Contractor during engineering phase.
CONTRACTOR shall be responsible to collect and transport issued material to his premises or installation place.
The CONTRACTOR, for this Scope of WORK, shall be responsible for defining all the interfaces between these facilities
and other existing/new facilities.
Contractor shall be responsible to define routing of lines and/or endorse Company's preliminary route or corridor.
In addition, the tentative schedule shall be subjected to availability of COMPANY supplied material.
SCHEDULE
Contractor have 15 days from approved Call off to revise/confirm the completion dates.
In case Contractor will not achieve the completion date LD's shall be applied, counted on the portion of work value subject
to delay only.
All the works shall be completed in full compliance with Article 34 of the Contract General Conditions and Article 27 of the
Contract Special Conditions.
Company reserve the right to change the location if necessary according to Oil field development indication.
Page 3
<e fill n n If cal <q] Ib~
WTC - Tower 6
• Strc!lwinskyloon 1.725
1077 XX AmstordoOm
The Netherlemds
Tel: +31 20 570 7100
Fox: +31205707170
PAYMENT BASIS
PAYMENT BASIS - APPENDIX A - ANNEX A1.2 - WI flow lines tie ins inside existing DGS/facilities - LS
A1.2 - WATER INJECTION TIE INS ACTIVITIES - LUMP SUM PRICE (LS)
In accordance with the distinct activities related to WATER FLOWLINE TIE-INS into WATER DISTRIBUTOR Remote Header or DGS Extended manifolds as defined ~thin Appendix D.
Price includes all operations to complete the execution of the works as reported in Appendix A Compensation and SOW - Appendix D
The above price include Engineering, Procurement, Installation, pre-commissioning, commissioning and start-up of 1
Tie-ins in existing OGS/facilities.
trhe plice I:st contains Canals, Roads and Ra.!ways to be crossed by trenchles.s me~od (thruS1bOnng or Auger bonng) and open cuts CONTRO\CTOR shall perform necessary .enflcat!ons in order to define type and length fOf supp:'
Iof ma:enal Jnd realise the crOSSings. TOOSOW worl<s is summar-ed w::h:n U1edescrtptlOn: for de!3:led bre3kdo"Nn of 3ct'l'tt!eS refer to SOW-Appe.nd!x 0
Crossing pnce Includes aUoperations to complete the execution of the 'Io'OJ1ls but nOll1Rl1ted10
Management and !le""lCeS, J~Ipermlts from a authoritIes, teams mob::~sa~on, suppty d aMthe petm3OI!flt mbltatlon ma:enals (e" c..1WIO, collar spJcer, end sell. venl, dra:n, etc. as defined but not I:mited to the SoW and attached
standard draw-ngs), conSnJction of the pipe!:ne cr03s:n-~ w-~ fu~ responsibil!oJ fer any darr-age to the crossed faa~1Jesincludes srte prepJralion. in tmc transportation for a!1malenal & eQu:pments. right of way preparatoo, ~0:1
investigation. Plpel'ne crOSSing mJ~enJI transport:Jtion, p:pe:ine cross:ng MANUAl eXC3'13jon, p:petne crossing fallncation and tie-in, v.-eld;ng. NOT. y,.-eldedjamt cOJtings app~J, 1'101:d31de:ecton test. p:pe!'ne crossing lo'A'enng In
:renCh. sand beddJOQ. sand padding. protection Ilef>Neen (he new and the eXI5tng P'Pe(b, concre1e slab Insta'13tlOn or casmQ). p;:pehne bJcUi:llnlJ. Tc~t!nCJ. sign m3~er suppll' and Instill! (f.lbncahon 3nd ercct:on). cle:lO up.
re!flsta!ement of wooing Site, as but:! documenb:1on. comp.!etel:nal techOlcal dOSSierand (Jeneral demobjl1Za~:onfor the fob bsk. as per COmpany speCification For p:pel:ne crOSSJr.gse."(ecu!ed by bonng, tl1e fOe ~h.J1Ibe laId In
protective HOPE conduit The HDPE conduil shall be 13:dalong w;!h the p;pehne
Price incrudes a:1opera~s to comp!ete the execu:.OO of the 'NorJ\s as reported in AppendJy.A Compen53~'OOand SOW - AppendiX 0
ITEM DESCRIPTION
U.M. PRICE ca. Total Price
Firm SoWOTY Ola/inch Range Notes
UP/Crossinll IUSOSI IUSOSI
The above price include Engineering, Procurement, Installation, pre-commissioning, commissioning and start-up of 5
crossings for railway change on specification.
Page 4
~ If1l n n If @l <q] It»'W
WTC - Tower B
• Strawlnt>kyllllan 1725
.1077 XX Amstardarn
The Netherlonds
Tel: +3120 5707100
Fax: +31205707170
CALL OFF 21
5 Crossing
A4.2 - Main Crossings - WI-CRS-002 Open Cut
PRICE BREAKDOWN SCHEDULE Payable
4.3159839
ITEM ITEM L1 DESCRIPTION
Full SoW
-_----- "~.-.-
O.Oa Project Management $1,068.11
Page 5
~ rill n n Ii Cd)<qJ Ib>~
WTC - Tower B
• Str<"iwlnskyl~on 1 725
1077 XX Amstord",m
The Netherlonds
Tel: +31 20 570 7100
Fax: +31 20rS_7_0__ 7_'_7_0 ~
CALL OFF 21
1.0 ENGINEERING
Page 6
~lf1ln nrr@l<qj Ib~
WTC - Tower B
Strawinskylaeln 1725
1077 XX Amsterdam
The Netherl8nds
Tel: +31 20 570 71.00
Fax: +31 20 570 7170
Page 7