To complete all works as per drawings including the glass canope at entrance
BEDROOM 1
lots of damaged corners in furniture
some of finger handle are not good
electrical fittings are not good
metal furring can be seen clearly from vanity
Arifin - do we have the mattress divider?
Arifin - the curtains are too short. Also we need to
do lining as discussed.
messy
cable should not be visible
bad
terrazzo on the glass
overall bedroom 1 is not finish. There's still major problem in electrical.
BEDROOM 2
another poor finger handle. Notice that the one at
left are good, but the one in right are bad. Use the
left one as standard
another damages in furniture corner
another damages in furniture corner. This one is
worse. And paint job are not good, see the white
paint drop at black paint face
bad finishing under terrazzo table. Seen clearly
from bed.
terrazzo at side of vanity table that meet stone
wall are not polished. It can be seen clearly .
paint in mirror's side
fix this mistake. Either replace the wood or fill it and
make it invisible
this side of deck is clearly seen from outside of
room. Treat this corners like the other exposed side
BEDROOM 3
bed base finishing are not good, some of
melamine layer are damaged/wrinkled
mirror glue aren't working. Some of mirror corners
came off
vanity underside corners are damaged. Clearly
seen when lay on bed
vanity front underside corners are not finish. Make it
smooth an white paint finish.
damaged spots in ceiling. This one is right above
user head when lay on bed
fungus spread from behind glass. Assumed that
there is no air flow behind it will make humidity that
grows it. But the one in toilet work just fine.
in almost every pivot installment in beam and floor,
finishing around it are bad.
lots of damaged in terrazzo floor. Lots of glass
dividers are broken. Some are still covered with
terrazzo.
gap between terrazzo and wall are not clean.
There's a concrete adding in floor. It shouldn't be
there
water mixer fallen apart. And rusty inside
does extract work?
BEDROOM 4
There should be 170mm sofa base instead of
100mm. Check terrace cushion sketch. Arifin do
you have cushion details??
there's steel sticking out in ceiling
no paint on glass
bath spout
mess to back of mirror
get lines good
dimmer working?
pipe sticking out from wall in ceiling
wall behind mixer base are not finished.
front side of mixer base are not finished.
MASTER BEDROOM
door hinge at wardrobe are not good installed.
wardrobe finishing stain in floor.
paint wood piece under the bed base to black
broken edge of terrazzo floor
curtains too short
chk bed quality
as above
krei installment in ceiling are not good. Some are
deform and we can see the glue
can see ceiling furring
sealent placement aren't good. Some edges of
glass placed without sealent
walls broken by glass installment aren't treated
properly
mess and doesn’t work in wardrobe. Very hard to
close. Need handles
holes for vent so can cl9ose doors, not near good
enough
stains on timber
arifin - looks bad,
too short at base
LIVING, DINING, KITCHEN
Arifin, sofa not correct. Should be sat on step and
console table forward to glass line. Looks 60 mm
wrong. Pls see detail.
mess. Sandblast to glass
sliding glass for food access in kitchen are not
done properly. Can be better than this.
tap wrong and broken
Arifin we need a blind in the guest shower in living
room.
AV ROOM
TV table aren't build as drawn. Check av room
table sketch. Need shadow gaps and division
between materials
there's a friction mark from wall to door. It
damaged the door. Handrail is not strong enough.
FITNESS ROOM
door swing is blocked
EXTERNAL
groove line ends are not good
some area, especially gaps aren't finished properly
wood beneath deck, what for ? Should be a clean
floating deck
pump for what ?
bad finishing of fix glass.
bad finishing of fix glass.
bad finishing of gap between frame and wall
some lamp aren't hid properly
bad finish
broken wood edge
bad finishing in gap between deck and planter
wall
bad finishing
bad finishing
surface broken by nail not fixed