This document provides a cost estimate for building a 200 square foot monolithic slab foundation and small exterior structure. It estimates the foundation will cost $2850 including excavation, concrete, rebar, gravel, and finishing. Framing is estimated at $3800 for lumber and plywood. Insulation costs are projected to be $3100. Exterior finishing such as siding, roofing, windows and doors are budgeted at $2600. The total estimated cost before overestimating and sales tax is $9840.

Uploaded by

Jeffrey Witty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views2 pages

A 200sq FT Monolithic Slab Has A Rough DIY Cost of

This document provides a cost estimate for building a 200 square foot monolithic slab foundation and small exterior structure. It estimates the foundation will cost $2850 including excavation, concrete, rebar, gravel, and finishing. Framing is estimated at $3800 for lumber and plywood. Insulation costs are projected to be $3100. Exterior finishing such as siding, roofing, windows and doors are budgeted at $2600. The total estimated cost before overestimating and sales tax is $9840.

Uploaded by

Jeffrey Witty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

A 200sq ft monolithic slab has a rough DIY cost of $5 to $7/sq ft (Hi-end cost = $7 x 200 = $1400)

 Budget: $1400 + assume 7% more cost for safety = approx. $1500


 Finishing: Assume $100 “unbudgeted costs”

Grade/Excavation:

 12’ deep (1ft) excavation + 1’ lime + 4’ gravel + 6’ of concrete = 5’ exposed “grade” (130mm)
 Footing is accounted for in all math (monolithic slab)
 500sq ft (460sq ft + waste) of 6mm polyethylene barrier below (continuous), laid before aggregate
 Digging is DIY free, barrier will cost under $100

Concrete

 10’x20’, monolithic, 6” thick, with 12” footing (monolithic)


 Volume of Concrete: 3.70 Yards
How many pre-mix bags
 40lbs Bags: 333 bags
 60lbs Bags: 222 bags
 80lbs Bags:167 bags
 At $6.50/80lbs bag Canadian dollars per bag = $1100

Rebar

 14x Bars (1/4” diameter) 9’-6” Length


 8x Bars (1/4” diameter) 19’-6" Length
 Spacing between each bar along the grid length/width: 1' 6" Length & 1' 4 5/16" Width Grid Size
 The size of the rebar grid, accounting for the edge clearance. 19' 6" Length & 9' 6" Width
 At $18 Canadian Dollars per rebar length = $400

Gravel fill (Aggregate Mix = Coarse: Crushed 1/4’ and less, Fine: Dry “coarse/fill” sand)

 10’x20’, 4” thick/deep
 2.74 cubic yards / 3.5 US tons / 3.18 metric tons / 3175 kg
 For gravel (dry, 1/4 to 2 in) with density of 105lb/ft³
 2.47 cubic yards / 4 US tons / 3.63 metric tons / 3629 kg
 Above = For gravel (with sand) with density of 120lb/ft³
 At $240 Canadian Dollars per yard = $700

Finishing of foundation

 Finish surfaces, Sides of slab sloped to prevent moisture sitting/raising = DIY free
 When set, clad in R10 ci (ridged foam), top and ALL sides (bottom to top, even below grade)
 When set, clad top surface in r5 ci (rigid foam) and mount four 4”x8”, 1/2 inch plywood on top
 200sq ft R5 ci rigid insulation & 60sq ft of R10 ci rigid insulation
 At $28 Canadian Dollars per EPS Rigid Insulation 96Inch X 48Inch X 1.5Inch (R5.65 ci) sheet = $100
 At $45 Canadian Dollars per GPS Rigid Insulation 96Inch X 48Inch X 2.13Inch (R5.65 ci) sheet = $350

100 + 100 + 1100 + 400 + 700 + 100 + 350 = $2850 Monolithic Slab Foundation Costs (with built-in safety $$)

///

Exterior Framing

(You will need about 50 pieces of 2x4, 10ft long, 20x sheets of 4ft x 8ft plywood ½ inch, also)

Framing, how to estimate lumber needed: (assuming: $12.75 per 2x6, 10ft long / $7 per 2x4 10ft long / $44 per 4x8 plywood ½”)

Budget: My estimate is roughly 145 pieces of 2x6 lumber, or $1750 worth ($2000 with 15% waste)
 Multiply the total wall length (in feet) by 0.75 (for 16-inch on-center stud spacing).
 Add three studs for each 90-degree corner.
 Add four studs for each 45-degree corner.
 Add two studs for each wall intersection (where another wall abuts the wall you are estimating).
 Add two studs for each opening that is 5 feet wide or less.
 Add one stud for each opening over 5 feet wide.
 Multiply the total count by 1.15 to add 15 percent for waste.

2x6 budget of $2000 + 4x8 plywood budget of 1000 + 2x4 budget of $800 = $3800 Framing Costs (with built-in safety $$)

//

Insulation costs (Full R-60, pure in roof/additive R-40+ exterior wall/R-12 Sound barrier in bathroom interior wall)

 850 sq feet of R10 ci rigid GPS insulation = $44 Canadian Dollars per 32sq ft sheet, Need 9 sheets = $400
 R12 (Sound barrier, bathroom) = $25 Canadian dollars per 78.3 sq ft bag, Need 2 = $50
 R40 = $133 Canadian Dollars per 48 sq ft bag, NEED 13 bags = $1800
 R60 = $87 Canadian Dollars per 32.6sq ft bag, NEED 8 bags = $750
 Vapor Barrier will cost roughly $100

400 + 50 + 1800 + 750 + 100 = $3100 Insulating Costs

//

Exterior Finish

 Might as well add the main & bathroom vent fans, both solar = $200 (and “grill cover” all over ventilation areas)
 Siding, 20 pieces per carton 200 sq ft per carton at $250 per carton, Need 3 = $800 (Abtco Cedar Creek D5D Pine)
 Roofing, Charcoal Laminated 3-Tab Shingles, 33.3 sq ft at $36 per Bundle, Need 8 = $300 (GAF Marquis WeatherMax)
 Flashing + soffits + various “trim/grill” bits, exterior light hardware = $300
 Exterior door = FREE (if you can not find a free door, check swap & buy/sell sites, easily under $20 at most. May need to
paint it)
 2x Egress (loft & bathroom), 40.25 inch x 22.5 inch Hopper Vinyl Window Top Hinged (7sq ft each > bathroom) = $500
 2x 30 inch x 24 inch Sliding Vinyl Window with Frame & Screen (5sq ft each, + 7 sq ft = 17sqft > main room) = $500

200 + 800 + 300 + 300 + 500 + 500 = $2600 Exterior Finish Costs

2600 + 3100 + 3800 + 2850 = $12350 Canadian Dollars (sales taxes included, slight/10% over estimate)

Before over estimate = $11115

Before sales taxes = Approx. $9840, AND we still have over estimated materials by an average of 7% (under $200 mind you)