0% found this document useful (0 votes)
50 views

Data Centre Design Data

This document provides details about conducting an audit of an existing data center infrastructure setup. It collects information on the data center's location, size, electrical and mechanical systems, fire protection, security, and plans for upgrades. Key sections cover the general setup, architectural features, structural specifications, and types of electrical, mechanical, fire protection and security systems currently implemented. The objective is to evaluate compliance and identify areas for potential expansion or improvement of reliability.

Uploaded by

Untuk Dia
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

Data Centre Design Data

This document provides details about conducting an audit of an existing data center infrastructure setup. It collects information on the data center's location, size, electrical and mechanical systems, fire protection, security, and plans for upgrades. Key sections cover the general setup, architectural features, structural specifications, and types of electrical, mechanical, fire protection and security systems currently implemented. The objective is to evaluate compliance and identify areas for potential expansion or improvement of reliability.

Uploaded by

Untuk Dia
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Data Centre Infrastructure Setup

Project:
Location:
Owner:
Date of Survey:

(A) OBJECTIVE:

1 Objective of this exercise (please tick):

To audit the existing Data Centre infrastructure setup compliance with


Tier-I, II, III or IV System.

To audit the existing Data Centre infrastructure setup compliance with


Green Building Index.

To audit the existing Data Centre infrastructure setup compliance with


contracted scope of works & specifications.

To audit the existing Data Centre infrastructure setup for expansion.

To upgrade the Electrical System for higher reliability.

To upgrade the Mechanical System for higher reliability.

To resolve Electrical Technical issues of existing Data Centre setup.


Please specify:

To resolve Mechanical Technical issues of existing Data Centre setup.


Please specify:

Others please specify:

(A) GENERAL:

1 Existing net area of Data Centre Server Farm / White Floor Space:

2 Quantity of Rack accommodated in the existing Data Centre:


i Network Rack: nos.
ii Server Rack: nos.
iii Storage Rack: nos.
iv Others please specify:

3 Existing net area of Mechanical & Electrical Utilities Space supporting Data Centre:

4 How old is the Data Centre:


months

5 Others please specify:

(B) ARCHITECTURAL:

1 How many levels is the existing building:


levels

2 Data Centre is located at which level of the building:


level

3 Mechanical & Electrical Utilities are located at which level of the building:
i Standby Generator Set: level
ii Diesel Fuel Tank: level
iii Incoming Power Switch Room: level
iv Power Transformer: level
v Electrical Main Switch Board: level
vi UPS & Battery: level
vii Air-Conditioning Chiller System: level
viii Air-Conditioning Outdoor Condenser System: level

4 Clearance height in existing Data Centre:


i From building floor slab to raised floor system: mm
ii From raised floor system to false ceiling: mm
i From false ceiling to building structural beam soffit: mm
i From building structural beam soffit to building ceiling slab soffit: mm
5 Others please specify:

(C) STRUCTURAL:

1 Structural floor loading in existing Data Centre:


kN/m²

2 How many hours fire rated of existing Data Centre parameter walls:
hours fire rated

3 Others please specify:

(D) ELECTRICAL SYSTEM:

1 Quantity & Capacity of Electrical Equipments:


i Incoming Utility Power Source: feeds V
ii Standby Generator Set: nos. kVA
iii Diesel Fuel Tank: nos. Hours
iv Power Transformer: nos. kVA
v Electrical Main Switch Board: nos. A
vi UPS: Brand: Model:
nos. kVA
vii Battery: sets Minutes
viii Isolation Transformer: nos. kVA
ix Power Distribution Unit (PDU): nos. A
x Commando Plug:
16A SPN (Single-Phase): nos.
16A TPN (Three-Phase): nos.
32A SPN (Single-Phase): nos.
32A TPN (Three-Phase): nos.
63A SPN (Single-Phase): nos.
63A SPN (Three-Phase): nos.

2 Existing Consumption / Usage of Electrical System:


i Electrical Main Switch Board: A %
ii UPS: kVA %

3 Others please specify:

(E) MECHANICAL SYSTEM:


1 Type of Data Centre Precision Air-Conditioning
(PAC / CRAC) Unit: Air Cooled / Water Cooled / Chilled Water Cooled
Brand:
Model:
Others please specify:

2 Data Centre Precision Air-Conditioning


(PAC / CRAC) Unit: nos.
kW Sensible Cooling Capacity

3 Air-Conditioning Chiller System: nos.


RT

4 Existing Consumption / Usage of Mechanical System:


i Existing Data Centre Temperature: °C
ii Existing Data Centre Humidity: %RH

5 Others please specify:

(F) FIRE PROTECTION SYSTEM:

1 Type of Fire Protection System in existing Data Centre:


Water Sprinkler / Dry Pipe System / Water Mist / IG-55 / FM-200
Argonite / FE-13 / Smoke & Heat Detectors only
Others please specify:

2 Type of Fire Protection System in existing Mechanical & Electrical Utilities Rooms:
Water Sprinkler / Dry Pipe System / Water Mist / IG-55 / FM-200
Argonite / FE-13 / Smoke & Heat Detectors only
Others please specify:

3 Coverage of Fire Protection in existing Data Centre:


i Under Raised Floor Protection: (Yes / No)
ii Data Centre Room Protection: (Yes / No)
iii Above False Ceiling Protection: (Yes / No)

4 Others please specify:

(G) HIGH SENSITIVITY EARLY SMOKE DETECTION SYSTEM:


1 Type of High Sensitivity Early Smoke Detection System in existing Data Centre:
VESDA / HSSD / None
Others please specify:

2 Coverage of High Sensitivity Early Smoke Detection in existing Data Centre:


i Under Raised Floor Protection: (Yes / No)
ii Data Centre Room Protection: (Yes / No)
iii Above False Ceiling Protection: (Yes / No)

3 Others please specify:

(H) WATER DETECTION SYSTEM:

1 Type of Water Detection System in existing Data Centre:


TTK / ELSA / None
Others please specify:

(I) CENTRAL MONITORING SYSTEM:

1 Type of Central Monitoring System in existing Data Centre:


High Level with Graphical User Interface / Low Level On-Off signal / None
Others please specify:

(J) SECURITY SURVEILLANCE CCTV SYSTEM:

1 Type of Security Surveillance CCTV System in existing Data Centre:


Analogue Type / Digital IP Type / None
Others please specify:

(K) SECURITY DOOR ACCESS SYSTEM:

1 Type of Security Door Access System in existing Data Centre:


Yes / None
Others please specify:

(L) IMMEDIATE PLAN:

1 To expand Data Centre space: (Yes / No)


If Yes, how much is the expansion area: m²
2 To increase quantity of Rack: (Yes / No)
Network Rack: nos.
Server Rack: nos.
Storage Rack: nos.
Others please specify:

3 To upgrade Electrical System: (Yes / No)


Please specify:

4 To upgrade Mechanical System: (Yes / No)


Please specify:

5 To upgrade Fire protection System: (Yes / No)


Please specify:

6 To upgrade High Sensitivity Early Smoke Detection System: (Yes / No)


Please specify:

7 To upgrade Water Detection System: (Yes / No)


Please specify:

8 To upgrade Central Monitoring System: (Yes / No)


Please specify:

10 To upgrade Security Surveillance CCTV System: (Yes / No)


Please specify:

11 To upgrade Security Door Access System: (Yes / No)


Please specify:

12 Others please specify:

You might also like