This document is a checklist for handing over control of an elevator from the builder to the owner. It contains 25 check points to inspect relating to the elevator pit, hoistway, car, machine room, and automatic rescue device. Any check points marked "NO" means the elevator should not be handed over until the issues are resolved. The checklist includes the elevator specification, date, and signatures of the site supervisor and lift company representative to acknowledge completion.

Uploaded by

Anirban Karmakar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views

9Fo13Ot72) : Bateo7/1o/so2

This document is a checklist for handing over control of an elevator from the builder to the owner. It contains 25 check points to inspect relating to the elevator pit, hoistway, car, machine room, and automatic rescue device. Any check points marked "NO" means the elevator should not be handed over until the issues are resolved. The checklist includes the elevator specification, date, and signatures of the site supervisor and lift company representative to acknowledge completion.

Uploaded by

Anirban Karmakar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Checklist anding

for ianding over of elevater itor benifiial 15age


i Name
Elevator 13 i Contracct No haoroin. Buldrg 2os
Equipment Type L-OH617 Bateo7/1o/so2
Elevator Specification pasenger Lft
15P, 3-Eandhé paD,ARD,12Sms make: JohnSon
S.NO.Check point Description Check iist Remarks
YES NO
Pit Inspection cihecklist
iPt should be clean
Sto &Dry
swilches working{P1&P2
Pit Laaider &Pit Light
4Pit Car & Ct.wt Buffers available
& Guideai! Oil cups {ixect
CGoverner switch working
Hoistway & Car
6P'rovisian of Hoistway Equipnient
Lighting
A Cnance gaps &sill gaps closed properly
8Car top Inspection swilch &Stop Switch /Claddng compieted.
9Cartop UP/DOWN operation working woriing
10
Car top barricates fixed
11 Car Top light wOrking
12 Door sensor working Socka_available fr lLh
13 Ali
Landing doors &Car Duor in salcty circuit
Machine Room/Over Head
24 Landing door,Caabin keys available
15 Controls equipped with
lockout &tagout.
16 Final limit switchesworking
7 Healthy Three phase supply &proper eartiing available
18Shaftis clean &free fronm unwanted material.
19provisiun of Eartiing -machine fcontroller
20 Over Head adequate lighti1g avialability.
Governer switch working_
AUTOMATIC RESCUE DEVICE LARD)
22 ARD Fixed & Battery
charged
23 ARD Operation ok
24 ARD ModeEmergency Lightworking
25 ARD Mode Announcement
w0Tking

iO
above check point
"
donot
please donot
is NO please handover elevatorfor
handover elevator tor operation & ensure
If any of before handig over of elevator. revised checklist made

# 3 3 T E o g

F l e m o n /T e k n s n

kw2 Mepsesedtive
Site Supervisor LnD K/o/2e2/
Kepresestabve.
Sign&date e7heps lO7753+2 South Centyol
faitoy )
kafMeg
7 9 2 SF
u leldy

)
9Fo13Ot72)
can witn Cam>cainer