Ppap 4 Edition Roll-Out: & ISO/TS 16949 Status Conference
Ppap 4 Edition Roll-Out: & ISO/TS 16949 Status Conference
1
Status of TS 16949
ISO/TS 16949
Launched 1999
Current Edition
2nd Edition. – March 2002*
(based on and including ISO
*corrected version 12/15/03
9001:2000)
Oversight IATF
VDA-QMC ANFIA SMMT IAOB
Office France
# of CB’s 3 19 3 6 23
Management
responsibility
Customers Customers
Measurement,
Resource
analysis and Satisfaction
Management
improvement
Input Output
Product
Requirements realization Product
INPUT OUTPUT
Customer who Customer who
has a need has a need met
1 2 3 “N”
Input Output
CUSTOMER CUSTOMER
Customer
Purchase Order /
Customer-Specific
An Example Record of
Approved
PSW
Requirements
ORGANIZATION
Customer Validated
Process Design Completion Process
Gather
Requirements of [PSO / Run at
Information
PSW Rate]
Supplier Initiated
Changes
Customer Approved
PPAP Table 4.1
Specifications PSW
Records Customer Initiated
Changes
to Part ,
Specifications, etc.
Customer
Logistics
Requirements
June 1, 2006
PSW
Safety and/or Government Regulation Yes No Purchase Order No. Weight (kg)
6
Checking Aid No.
9 10 Dated
Checking Aid Engineering Change Level
Revised and
Supplier Name & Supplier/Vendor Code Customer Name/Division
12 14
Street Address Buyer/Buyer Code
15
City Region Postal Code Country Application
Reorganized
MATERIALS REPORTING
Has customer-required Substances of Concern information been reported?.
16 Yes n/a
No
Are polymeric parts identified with appropriate ISO marking codes? 17 Yes No n/a
REASON FOR SUBMISSION (Check at least one)
Initial Submission
18 Change to Optional Construction or Material
Engineering Change(s) Supplier or Material Source Change
Tooling: Transfer, Replacement, Refurbishment, or additional Change in Part Processing
Correction of Discrepancy Parts Produced at Additional Location
Tooling Inactive > than 1 year Other – please specify
REQUESTED SUBMISSION LEVEL (Check one) 19
Level 1 – Warrant only (and for designated appearance items, an Appearance Approval Report) submitted to customer.
Level 2 – Warrant with product samples and limited supporting data submitted to customer.
Level 3 – Warrant with product samples and complete supporting data submitted to customer.
Level 4 – Warrant and other requirements as defined by customer.
Level 5 – Warrant with product samples and complete supporting data reviewed at organization's manufacturing location.
SUBMISSION RESULTS 20
The results for dimensional measurements material and functional tests appearance criteria statistical process package
These results meet all design record requirements: Yes NO (If “NO” – Explanation Required) 21
Mold / Cavity / Production Process 22
DECLARATION
I affirm that the samples represented by this warrent are representative of our parts, which were made by a process that meets all Production Part
Approval Process Manual 4th Edition Requirements. I further affirm that these samples were produced at the production rate of 23 / 24 hours.
I also certify that documented evidence of such compliance is on file and available for review. I have noted any deviations from this declaration below.
EXPLANATION/COMMENTS:
25
Is each Customer Tool properly tagged and numbered? Yes No 26
27
Organization Authorized Signature Date
Deletions:
Agreement
Critical Characteristic (both Ford and GM definition)
Customer Product Approval Activity
Documentation
Environment
Full Approval
Gage Repeatability & Reproducibility (Gage R&R)
Initial Sample
Interim Approval
Deletions (continued)
Key Characteristics (All four)
MSA Studies
Rejected
Remote Location
Repeatability and Reproducibility
Safety Characteristics
Self Certifying Supplier
Subcontractor
Tooling Maintenance
Tooling Refurbishment
Revised:
Approved
Attribute Data
Customer
Initial Process Study
Part Submission Warrant
Process
Process Flow Diagram
Quality Indices
Saleable Product
Revised (continued):
Significant Production Run
Site
Special Characteristics
Specification
Stable Process
Suppliers
Statistical Control
Submission Level
Variables Data
Added:
Authorized Customer Representative(s)
Black Box
Organization
Production Rate