2.1 Fuel Conversion System
2.1 Fuel Conversion System
(DIESEL-CNG/LNG)
CNG cylinders, as per Sinogas conversion kits Sinogas works with Weichai
ISO11439 standard, BV package with control valves and Yuchai for long term
inspection, WP200Bar, and panel, all certified as per cooperation, able to supply
available from 20L to ISO11550 and ISO14469 gas engine with long term
2080L in water volume. standard with certificate. after services.
LNG fuel sysetm
Step 1. to check diesel engine truck Step 2. Sinogas will do R&D work
condition evaluate whether we can do for conversion system and supply
conversion or not for this vehicle, all parts: gas engine, conversion
select engine type, storage capacity. kits and gas cylinders packages.
Step 3. Sinogas dispatch technicans to Step 4. Install all new components and
Egypt for training, workers take off existing make sure they are well connect acc to
old engine and put on new gas engine and calculation and safety requlations, set the
conversion kits, CNG cylinders pacakge. best performance of engines.
Step 5. To do manifold leakage testing Step 6. to take road and load test for 1-2
and refilling test, to set best parameters of months and approve the type approval
gas engine by software and PC terminal. testing, and convert more trucks, all
components shall have quality warranty.
Project reference
A total
number of
79 garbage
truck has
been
convert to
CNG fuel in
2018 in
Puebla; All
In 2018, a total number of 81 buses has trucks has
been converted into CNG from diesel in good
Monttery, Mexico, all buses have reliable performance.
and good performance.
Certificate
Sinogas services promise
● Sinogas will give training to local engine to do conversion and give software knowhow;
● Low cost of mantainance after sales with Brand new NG engine and CNG fuel system.
● Warranty 24 months or 400,000 km for full system along with gas engine factory.
www.repowergas.com