This daily drilling report summarizes work done on hole BH-01 on February 8, 2022. Drilling was done from 7:00 to 17:55 to a depth of 10 meters. Standard Penetration Tests were conducted periodically, with N-values (blow counts) ranging from 6 to over 60, indicating soil densities from loose to very dense. Remarks note soils ranging from sand to very stiff clay.

Uploaded by

Muh Rajih Musdar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views

Daily Report of Drilling: (Laporan Harian Pemboran)

This daily drilling report summarizes work done on hole BH-01 on February 8, 2022. Drilling was done from 7:00 to 17:55 to a depth of 10 meters. Standard Penetration Tests were conducted periodically, with N-values (blow counts) ranging from 6 to over 60, indicating soil densities from loose to very dense. Remarks note soils ranging from sand to very stiff clay.

Uploaded by

Muh Rajih Musdar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Sheet : 1

Project : Perencanaan Percepatan DED, EIA, dan LARP Ruas Mamasa-Bts. Sulsel,
Provinsi Sulawesi Barat, Tahun 2022

DAILY REPORT OF DRILLING


(LAPORAN HARIAN PEMBORAN)
DAY (Hari) : Selasa HOLE NO : BH-01 OPERATOR : Bahri Sada (Tim Bor-01) Geodetic Eng. : Ir. H.A. Muh. Idhil Maming, MT
DATE (Tanggal) : 8 Feb. 2022 LOCATION : STA. 0+00 GWL : - (in the morning) Machine : TOHO MZ-1
Time (Waktu) Depth (Kedalaman) Core Bit Core Drilling Standard Penetration Test (SPT) Cashing Pipe
Core Recovered

N.1 (Blows/cm)

N.2 (Blows/cm)

N.3 (Blows/cm)

Numb. of Blows
From To From To Recovery Type Dia Barrel Method Depth Dia.
Kind REMARKS

(Blow/cm)
of Rock (Keterangan)

=N2+N3
(hh:mm) (hh:mm) (m) (m) (m) (m) (% ) (M/D)*1 (mm) (S/D/T)*2 (D / W / SPT / UDS)*3
(m) (mm)
7:00 7:45 0.00 1.20 1.20 1.20 100 M 73 S D 18 89
3 3 3 6
8:00 8:30 1.20 2.00 0.80 0.80 SPT 18 89
15.00 15.00 15.00 30.00
8:40 9:20 2.45 3.00 0.55 0.55 100 M 73 S D 18 89
9:25 10:00 3.00 3.50 0.50 0.50 100 M 73 S D 18 89
3 6 11 17
10:05 10:30 3.50 4.00 0.50 0.50 SPT 18 89
15.00 15.00 15.00 30.00
10:40 11:10 4.45 5.00 0.55 0.55 100 M 73 S D 18 89
11:15 11:30 5.00 5.35 0.35 0.35 100 M 73 S D 18 89
15 30 44 74 SPT-N > 60
11:35 12:00 5.35 6.00 0.65 0.65 SPT 18 89
15.00 15.00 15.00 30.00
12:00 13:00 73 Istirahat
13:00 13:30 6.45 6.75 0.30 0.30 100 M 73 S D 18 89
13:35 14:00 6.75 7.05 0.30 0.30 100 M 73 S D 18 89
14:05 14:35 7.05 7.40 0.35 0.35 100 M 73 S D 18 89
14:40 15:25 7.40 7.50 0.10 0.10 100 M 73 S D 18 89
24 35 47 82 SPT-N > 60
15:30 16:00 7.50 8.00 0.50 0.50 SPT 18 89
15.00 15.00 15.00 30.00 pasir kasar sedikit lempung sangat keras
16:10 16:45 8.45 9.00 0.55 0.55 100 M 73 S D 18 89
16:50 17:20 9.00 9.40 0.40 0.40 100 M 73 S D 18 89
34 60 SPT-N > 60
17:25 17:55 9.40 10.00 0.60 0.60 SPT > 60 18 89
15.00 13.00 pasir kasar sangat padat & keras
*1 M:METAL, D:DIAMOND *2 S:SINGLE, D:DOBLE, T:TRIPLE 3* D:Dry, W:Wet, SPT:Standart Penetration Test, UDS:Undisturbed Sample
(water loss,spring, cavty, artesian water, machine troble, jamming, etc, should be recorded)

Submited By (dilaporkan Oleh) Checkid By (diperiksa Oleh)

Ir. H.A. Muh. Idhil Maming, MT ………………………………….