Monthly Work Programme
Monthly Work Programme
NH-353J
Nagpur-Katol
CONTRACT PACKAGE : I
EPC CONTRACTOR:
M/s. Joint Stock Company “ Industrial Association” Vozrozhdenie”. With N.P Infra India Pvt Ltd (Joint Venture)
Aurangabad
Name of Works : Balance work for construction
Authority NATIONAL HIGHWAYS AUTHORITY OF INDIA
Authority's Engineer
Contractor joint stock pvt ltd
Cost of Project
In cr 5,909,300,000 1,183
1 2 3 4 5 6 7 10 11 27
B. ROB
Major Bridge
(Length >60m)
2. Sub Structure Rm 14.34% 81,688,745 178.32 458,102
works &
RUB/ROB/Eleva 3.Super Structure (including Bearings) Rm 30.86% 175,796,002 178.32 985,846
3 9.64% 569656520
ted Sections/
Flyovers 4. Others (Incliding crash
including barrier,Expansion joint, Railing Rm 2.97% 16,918,799 178.32 94,879
Viaducts. painting etc complete )
D. Other Works
(a). Bus Bays & bus Shelters No. 2.00% 21,060,745 28 752,169
(d) Street Light, Highmast Blinkers No. 3.17% 33,381,281 826 40,413.17
4 Others Work
17.82% 1053037260 Base line completion w
Weightage in
pecentage to Total value as per contract Percentage Value as per Contract
S.no Item Stage for Payment Unit Scope of Work Rate / Unit Dec-22
the Contract (Rs) Weightage (Rs)
Price
Electrical Utilities
and public
utilities( waterline
7.71% 455607030 (ii) HT/LT iLines & Crossings Rm 47.48% 216,322,218 48.200 4,488,013
sewage lines etc)
Name of Works : Balance work for construction
Authority NATIONAL HIGHWAYS AUTHORITY OF INDIA
Authority's Engineer
Contractor joint stock pvt ltd
Cost of Project
In cr 5,909,300,000 1,183
(iii) Water pipe line & Crossings etc Rm 20.97% 95,540,794 48.200 1,982,174
Individual % work to be
0.00%
executed
Cumullative % work to be
#REF!
executed
S.no Mile stone Progess % Duration Start date End date Individual MS
1 1st (First)
2 2nd(Second)
3 3rd (Third)
4 Schedule Completion
Total Value in Cr 590.93
Name of Works : Balance work for construction of 4 laning of Barasat Krishnanager section of NH-34
Authority :NATIONAL HIGHWAYS AUTHORITY OF INDIA
Contractor : KCC Buildcon Pvt Ltd
S-Curve
20.00
Milestone - I Milestone - II
Milestone - III
0.00
-20.00
-40.00
-60.00
-80.00
-100.00
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23
Month Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23
Planned Value (%) Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total length of
Existing after
8 MJB Exist
deduction of
structure
Total length of
Realingment after
9 MJB Realing
deduction of
structure
1ST MILESTON 10% 590,930,000 73866250
2N MILESTONE 35 % 2,068,255,000 295465000
3RD MILE STONE 70% 4,136,510,000
4TH MILE STONE 100% 5,909,300,000
SRK Constructions & Projects Pvt, Ltd.
Major Bridge:
Minor Bridge:
Work Planned to execute in this month of Dec-2022
Retaining Wall:
Total 53.00 M
Upgradation of Umred-Bhisi-Chimur-Warora, NH-353E, Package – II, Chimur to Warora, from Km. 47+700 to Km. 98+350 (Design
Project : Chainage) excluding 7.90 Km. length from Km. 52+700 to Km. 60+600 to two lane with paved shoulder configuration in the state of
Maharashtra on EPC mode.
Client : Public Works Department, Maharashtra (Ministry of Road Transport & Highways, Government of India)
Authority's Engineer : Highway Engineering Consultant
EPC Contractor : SRK Constructions & Projects Pvt, Ltd.
IPC No. : IPC No. - 24
Period : Period From 20.10.2021 to 16.12.2021
ROYALTY STATEMENT
Quantities Utilized
BOQ Executed Aggregates Sand
Description Unit Upto Date Qty Moorum Quantity
Item No. Length in KM
Rate of consump-tion / Rate of consump- (Cum)
Quantity Quantity
cum tion / cum
a b c g h i=gxh j k=gxj l=g