Circular 400
Circular 400
We would like to kindly inform you that we have recently updated the drawings submission
standards.
Below are the new standards that consultants and contractors must adhere to when preparing and
submitting drawings to Dubai Development Authority:
Third party survey reports: Colored shaded area diagram and digital copy of AutoCAD and
polyline diagram drawings should be submitted.
NOTE: Each drawing / sheet must be uploaded in a separate file (DWF format). Drawings
that are combined into a single file will not be accepted.
After the design has been approved, the approved drawings can be viewed/downloaded in Zoning
eServices under the corresponding design submission.
Should you have any queries, please contact us on 800-4-DDA (332) or via Connect with Us.
Regards,
Dubai Development Authority