The Dubai Development Authority has updated its drawings submission standards. Drawings must now be submitted in A1 size and DWF format, in black and white except for perspectives. Drawings should be arranged sequentially under the appropriate discipline tab and file names should indicate the drawing name and number based on the new naming convention. Any design revisions must clearly cloud changes on the drawings between the latest approved and proposed versions.

Uploaded by

Abdul Ghaffar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views

Circular 400

The Dubai Development Authority has updated its drawings submission standards. Drawings must now be submitted in A1 size and DWF format, in black and white except for perspectives. Drawings should be arranged sequentially under the appropriate discipline tab and file names should indicate the drawing name and number based on the new naming convention. Any design revisions must clearly cloud changes on the drawings between the latest approved and proposed versions.

Uploaded by

Abdul Ghaffar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Circular 400: Drawings Submission Standards

Date: September 29, 2021

Dear Valued Customer,

We would like to kindly inform you that we have recently updated the drawings submission
standards.

Below are the new standards that consultants and contractors must adhere to when preparing and
submitting drawings to Dubai Development Authority:

 All drawings should be in A1 size and in DWF format


 All drawings should be in black and white /monochrome format except for perspectives
and Shaded Area Diagrams
 Drawings should be arranged sequentially and submitted under the appropriate discipline
tab, clearly indicating the name and number of each file, as follows:

o Tabs: Architecture, Structural, Mechanical and Fit out (If applicable).


o Drawing naming (sheets): The names of the relevant discipline drawings must be as
shown in the link below (for example, architecture drawings must start with A-00-
xxx (Drw. No.) and then the “Name”). Please refer to the following link for additional
information on the discipline-specific naming conventions:
Link: Drawings Submission Standards

 Design revisions, re-design, and building modification submissions:


o All changes must be clearly clouded on the drawings (latest approved stamped
drawings (YELLOW cloud) and proposed drawings (RED cloud)).

PO Box 478844, Dubai, UAE


T +971 800-4-DDA (332)
F +971 4 427 2449
dda.gov.ae
o The approved stamped drawings must be converted to DWF and named “As
Approved” drawings (for example, architecture drawings must start with A-00-xxx
(Drw. No.) and then the “Name” “As Approved”), and the proposed changes must
be highlighted on the “As Proposed” drawings (for example, architecture drawings
must begin with A-00-xxx (Drw. No.) and then the “Name” “As Proposed”).

 Third party survey reports: Colored shaded area diagram and digital copy of AutoCAD and
polyline diagram drawings should be submitted.

NOTE: Each drawing / sheet must be uploaded in a separate file (DWF format). Drawings
that are combined into a single file will not be accepted.

After the design has been approved, the approved drawings can be viewed/downloaded in Zoning
eServices under the corresponding design submission.

Should you have any queries, please contact us on 800-4-DDA (332) or via Connect with Us.