Project of Business Plus Mall: Request For Inspection and Approval

The contractor requests inspection and approval of fire pipe installations at the Business Plus Mall project. The installations are located on the ground floor at the specified location and are ready for review at 11:00 AM on the date listed. Attached documents include drawings, checklists, test reports, and previous requests for information or approval. The contractor certifies coordination with relevant subcontractors and packages.

Uploaded by

Volt Sheriif
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views

Project of Business Plus Mall: Request For Inspection and Approval

The contractor requests inspection and approval of fire pipe installations at the Business Plus Mall project. The installations are located on the ground floor at the specified location and are ready for review at 11:00 AM on the date listed. Attached documents include drawings, checklists, test reports, and previous requests for information or approval. The contractor certifies coordination with relevant subcontractors and packages.

Uploaded by

Volt Sheriif
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT OF BUSINESS PLUS MALL

REQUEST FOR INSPECTION AND APPROVAL

MEC-FF-01
Contractor : ELALAMIA AIR CONDITIONING co. Request No. :
Package No. : BUSINESS PLUS Revision : 0
Date : 27\ 02 \2023

To : The Quality and Construction Team


The following items are ready for your inspection on (Date): 11:00:00 AM

Installations for fire pipes

Location : INVEST WELL Level : Axis :


Drawing Ref. : Activity ID: MECH

Attachments: Submittal No. Code Remarks


DWG √
Checklist
Test Reports
Previous RFIA

Description:

Inspection and approval of installation for Fire Fighting pipes

Location: GROUND Floor

We certify that the above items have been coordinated with the following Subcontractors and other relevant packages

Electrical : Mechanical : √ Elevators : Others :

QA/QC Site Engineer: Project Manager:


(Contractor) (Contractor)

Received Dat : Time : Consultant's Signature :

Consultant's / Owner's Approval / Comments: Code "A" - Approved Code B - Approved with
Code
Comments
"C" - Rejected and Resubmit

Signature : Date :

Received Dat : Time : Contractor's Rep. :