The document is a penetrant examination report for repairs to a 5000 KL tank at a fuel terminal. It summarizes the inspection of welds on a 4" diameter pipe carrying air. All 10 welds inspected were accepted without any indications found. The inspection was performed after welding using a visible red penetrant method according to API 650 standards.

Uploaded by

rizky youlanda
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views

Pt. Gintam Tehnik: Inspeksi

The document is a penetrant examination report for repairs to a 5000 KL tank at a fuel terminal. It summarizes the inspection of welds on a 4" diameter pipe carrying air. All 10 welds inspected were accepted without any indications found. The inspection was performed after welding using a visible red penetrant method according to API 650 standards.

Uploaded by

rizky youlanda
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PT.

GINTAM INSPEKSI TEHNIK


NDT Service Solution Cert No. IDN 08

PENETRANT EXAMINATION REPORT


Owner : PT. PERTAMINA PATRA NIAGA Contractor : PT. Indoteknik Tjandra Utama Report No. : DPT-GIT/ITU/III/2023 - 001

Project : PERBAIKAN TANKI TIMBUN NO. 08 KAP 5000 KL Procedure No. : GIT-PT-API650-01 Date : 27 March 2023

Subject : JALUR PIPA AIR Aplicable CODE : API 650 Drawing No :

Material Spec. : GLV ASTM A53 Welding Process : SMAW

Penetrant Type / Method : X Visible X Solvent Removable Other


Brand's Name / Type : Magnaflux Penetrant : SKL-SP2 Cleaner : SKC-S Developer : SKD-S2
Method Pre-Cleaning : X Solvent Spray Drying After Cleaning : 5 Minutes
Penetrant Application : X Brush X Spray Dwell Time : 10 Minutes Temperature : Ambient
Light Intensity : Min. 100 fc Light Source : Natural light
Method Removing Excess Penetrant : Wiping with dry clean cloth
Drying After Remove Penetrant : 2 Minutes Developer App. : Spray Developing Time : 10 Minutes
Batch No. : Penetrant : 190612 Cleaner : 190601 Developer : 190603

Surface Preparation : X As awelded Machining Grinding Others


Time of Examination : X After Welding After Hydro-Test After PWHT Others
Scope of Examination : Base Metal Edge Preparation Back Chipping
X Weld Part Repair Weld Others

Diameter Thickness Result Type of


No. Part Name Joint No. Remarks
( Inch ) ( Sch) Accepted Rejected Discontinuities

JT. 02 4" 40 Accepted - No indication

JT. 03 4" 40 Accepted - No indication

JT. 04 4" 40 Accepted - No indication

JT. 05 4" 40 Accepted - No indication

JT. 06 4" 40 Accepted - No indication

JALUR
JT. 07 4" 40 Accepted - No indication
PIPA AIR Ø 4"
JT. 08 4" 40 Accepted - No indication

JT. 09 4" 40 Accepted - No indication

JT. 10 4" 40 Accepted - No indication

TOTAL 9
Sketch ( Identify discontinuities listed above ) if necessary

Examined by, Reviewed / Witnessed by, Witnessed/Approved by :


PT. Gintam Inspeksi Tehnik PT. Indoteknik Tjandra Utama PT. Pertamina Patra Niaga FT Sibolga

Name : Vrengky Tampubolon Name : M. Safaat Ridho Name :


Position : MT/PT Level II Position : Site Manager Position : Fuel Terminal Manager
PT. GINTAM INSPEKSI TEHNIK
NDT Service Solution Cert No. IDN 08

PENETRANT EXAMINATION REPORT


Owner : PT. PERTAMINA PATRA NIAGA Contractor : PT. Indoteknik Tjandra Utama Report No. : DPT-GIT/ITU/III/2023 - 002

Project : PERBAIKAN TANKI TIMBUN NO. O8 KAP 5000 KL Procedure No. : GIT-PT-API650-01 Date : 27 March 2023

Subject : JALUR PIPA AIR Aplicable CODE : API 650 Drawing No :

Material Spec. : GLV ASTM A53 Welding Process : SMAW

Penetrant Type / Method : X Visible X Solvent Removable Other


Brand's Name / Type : Magnaflux Penetrant : SKL-SP2 Cleaner : SKC-S Developer : SKD-S2
Method Pre-Cleaning : X Solvent Spray Drying After Cleaning : 5 Minutes
Penetrant Application : X Brush X Spray Dwell Time : 10 Minutes Temperature : Ambient
Light Intensity : Min. 100 fc Light Source : Natural light
Method Removing Excess Penetrant : Wiping with dry clean cloth
Drying After Remove Penetrant : 2 Minutes Developer App. : Spray Developing Time : 10 Minutes
Batch No. : Penetrant : 190612 Cleaner : 190601 Developer : 190603

Surface Preparation : X As awelded Machining Grinding Others


Time of Examination : X After Welding After Hydro-Test After PWHT Others
Scope of Examination : Base Metal Edge Preparation Back Chipping
X Weld Part Repair Weld Others

Diameter Thickness Result Type of


No. Part Name Joint No. Remarks
( Inch ) ( Sch) Accepted Rejected Discontinuities

JT. 11 4" 40 Accepted - No indication

JT. 13 4" 40 Accepted - No indication

JT. 14 4" 40 Accepted - No indication

JT. 15 4" 40 Accepted - No indication

JT. 16 4" 40 Accepted - No indication

JALUR
JT. 17 4" 40 Accepted - No indication
PIPA AIR Ø 4"
JT. 18 4" 40 Accepted - No indication

TOTAL 7
Sketch ( Identify discontinuities listed above ) if necessary

Examined by, Reviewed / Witnessed by, Witnessed/Approved by :


PT. Gintam Inspeksi Tehnik PT. Indoteknik Tjandra Utama PT. Pertamina Patra Niaga FT Sibolga

Name : Vrengky Tampubolon Name : M. Safaat Ridho Name :


Position : MT/PT Level II Position : Site Manager Position : Fuel Terminal Manager
PT. GINTAM INSPEKSI TEHNIK
NDT Service Solution Cert No. IDN 08

DYE PENETRANT DOCUMENTATION


Owner : PT. PERTAMINA PATRA NIAGA Contractor : PT. Indoteknik Tjandra Utama Drawing No. :
Project : Perbaikan Tanki Timbun No. 08 Kap 5000 KL Location : Fuel Terminal Sibolga Date : 27 Maret 2023

Subject : JALUR PIPA AIR Aplicable CODE : API 650 Remarks : PIPA AIR Ø 4"
PT. GINTAM INSPEKSI TEHNIK
NDT Service Solution Cert No. IDN 08

DYE PENETRANT DOCUMENTATION


Owner : PT. PERTAMINA PATRA NIAGA Contractor : PT. Indoteknik Tjandra Utama Drawing No. :
Project : Perbaikan Tanki Timbun No. 08 Kap 5000 KL Location : Fuel Terminal Sibolga Date : 28 Maret 2023

Subject : Shell to Bottom Plate Annular Aplicable CODE : API 650 Remarks : SHELL TO ANNULAR