0% found this document useful (1 vote)
95 views

Achievement Test

This document appears to be an achievement test consisting of multiple choice questions related to logistics and supply chain management. There are 16 questions in total, testing knowledge of topics like PM Gati Shakti initiative, warehouse operations, ERP systems, ABC analysis, logistics definitions and concepts, quality management approaches, and economic order quantity models. The test taker answered 12 out of 16 questions correctly, achieving a score of 40 out of a possible 50 total points.

Uploaded by

Keshav kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
95 views

Achievement Test

This document appears to be an achievement test consisting of multiple choice questions related to logistics and supply chain management. There are 16 questions in total, testing knowledge of topics like PM Gati Shakti initiative, warehouse operations, ERP systems, ABC analysis, logistics definitions and concepts, quality management approaches, and economic order quantity models. The test taker answered 12 out of 16 questions correctly, achieving a score of 40 out of a possible 50 total points.

Uploaded by

Keshav kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

Achievement Test Total points 40/50

Email *

[email protected]

The total budget allotment to PM Gati Shakti initiative is   * 2/2

A. 80 Lakhs crores

B. 120 Lakhs crores

C. 150 Lakhs crores

D. 100 Lakhs crores

There are _____pillars on which PM Gati Shakti Project is *2/2


based. 

A. Eight

B. Six

C. Four

D. None of above

1 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

The date of launching the PM Gati Shakti Project by the *2/2


Hon’ble Prime Minister is ……. 

A. 15th August, 2022

B. 15th October, 2021

C. 13th October, 2021

D. 13th October, 2022

PM Gati Shakti – National Master Plan for Multi-modal *2/2


Connectivity, a digital platform, will bring _______Ministries
including Railways and Roadways together for integrated
planning and coordinated implementation of infrastructure
connectivity projects. 

A. 16

B. 14

C. 18

D. 10

Which of the following is/are the possible outcome/s of PM *2/2


Gati Shakti – National Master Plan. 

A. Reduction in logistic cost and Time Delays

B. Providing gainful employments.

C. Bringing speed in the movements of goods and services

D. All of the above.

2 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

The process of converting relatively larger lot size in to *2/2


relatively smaller lot size in warehouse is called as 

A. Sorting

B. Assorting

C. Consolidation

D. Bulk breaking

The process of converting relatively heterogeneous lot in to *2/2


multiple homogeneous lots in warehouse is called as
___________.

A. Sorting

B. Assorting

C. Consolidation

D. Bulk breaking

The process of converting multiple relatively heterogeneous *2/2


lots into single homogeneous lot in warehouse is called as
__________.

A. Sorting

B. Accumulation

C. Consolidation

D. Bulk breaking

3 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

The process where multiple product come into warehouse *0/2


from multiple places and go out form warehouse in multiple
combinations to multiple destinations is called as ___

A. Sorting

B. Assorting

C. Consolidation

D. Bulk breaking

Correct answer

B. Assorting

The process where multiple product come into warehouse *2/2


from multiple places and go out form warehouse as single
consignment to single destination is called as

A. Sorting

B. Assorting

C. Consolidation

D. Bulk breaking

4 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

The process where the goods come to warehouse and go out *2/2
of warehouse without any change in quantity or combination
is called as 

A. Transshipment

B. Assorting

C. Consolidation

D. Bulk breaking

Which among the following is the objective of the Enterprise *2/2


Resource Planning system?.

A. Manage purchase order

B. Control the flow of dependent demand inventories

C. Organize external management information

D. Balance supply and demand

5 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

Which of the following models is used to calculate the timing *0/2


of the inventory order?

A. Economic order quantity model

B. Fixed order quantity model

C. Reorder point model

D. Fixed order inventory model

Correct answer

C. Reorder point model

In the ABC Analysis system, the B category stands for * 0/2

A. Outstanding importance in value

B. Comparatively unimportant in value

C. Comparatively important in value

D. Average importance in value

Correct answer

D. Average importance in value

6 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

Which of the following is not an area of responsibility for a *0/2


logistics manager? 

A. Inventory

B. Purchasing

C. Warehousing

D. Marketing

Correct answer

D. Marketing

A network of highways connecting India’s four metropolitan *2/2


cities.  

A. Golden Quadrilateral

B. Logistics parks

C. Deep water ports

D. Management

Logistics is the part of supply chain involved with the forward *2/2
and reverse flow of 

A. Goods

B. Services

C. Cash

D. All of the above

7 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

Which of the following is not a part of Supply chain *2/2


Management system? 

A. Supplier

B. Manufacturer

C. Competitor

D. Information Flow

Total Quality Management Is 2/2

A. Philosophy

B. Strategy

C. Tool

D. Method

Which is not QMS-TQM approach 0/2

A. Quality Circle

B. Kaizen

C. Re-Buffering

D. Reengineering

Correct answer

C. Re-Buffering

8 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

Improving quality in existing QMS requires 2/2

A. Investment

B. Training

C. Strategy

D. Creativity

EOQ Stands for   2/2

A. Economic Order Quantity

B. Economical Optimum Quantity

C. Economics of Quality

D. None of above

 _________ are meant to receive products from various *2/2


company suppliers and plants and move them out as soon as
possible. 

A. Storage warehouses

B. Distribution warehouses

C. Automated warehouses

D. None of the above

9 of 10 3/10/2023, 3:25 PM
Achievement Test https://docs.google.com/forms/d/e/1FAIpQLSdtKlYGLSNRFzeJM...

………….is known as a distribution system in which *2/2


merchandise received at the warehouse or distribution center
is not put away, but instead is readied for shipment to retail
stores. 

A. Cross Functioning

B. Cross Docking

C. Cross Making

D. Cross Managing

In the recent years – the major gains in logistical efficiency *2/2


have come from which one of the following - 

A. Advances in information technology

B. Reduction in petroleum prices

C. Fast order processing

D. Increase in production of commercial vehicle

This form was created inside of NITTTR Bhopal.

Forms

10 of 10 3/10/2023, 3:25 PM

You might also like