0% found this document useful (0 votes)
61 views

LOGBOOK Tabulator MLArchitecture

The document provides a log sheet template for architects to track their diversified training experience. It includes sections to record projects worked on, activities performed, dates, and hours in different fields of practice. Instructions are given to help the user fill out the form correctly to tally their hours for licensure requirements. The sender provides the template to help architects document their training experience.

Uploaded by

Trishia Santiago
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views

LOGBOOK Tabulator MLArchitecture

The document provides a log sheet template for architects to track their diversified training experience. It includes sections to record projects worked on, activities performed, dates, and hours in different fields of practice. Instructions are given to help the user fill out the form correctly to tally their hours for licensure requirements. The sender provides the template to help architects document their training experience.

Uploaded by

Trishia Santiago
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 58

Hey there Architect,

We are M+L Team. We're sending you a little note just to say thank you for making an effort and time
to check out our little gift for you.

Use this and share it with your fellow architects and let us know your thoughts. We are very interested
to see how you find them.

Feel free to make changes and improvements on this, and make your own version. We know you can
do it better than us. 💪

Good Luck Architect, Believe in yourself!!

Rooting for you,


M+L Team

"For the Profession"

Ps. We personally use this one when we took the JUNE ALE 2019 BOARD EXAM. Share this with your
friends 😊 We hope we took away some burdens on your sexy shoulders.
We're so sorry for the bad audio quality! We will make it better next time . 😉
Disclaimer: The

NOTE: We don't protect the cells/ sheets containing computation for your ease of use to make adjustments and rev

THE LO

LOG SHEET OF DIVERSIFIED TRAINING FO


CANDIDATE: YOUR NAME

SUMM

FIELD OF PRACTICE

A. ARCHITECTURAL DESIGNING/ DRAFTING, STRUCTURAL CONCEPTUALIZATION, PLANNING &


LIKE.

B. PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATION WRITING, BILL OF MATERIALS, C


ESTIMATES, GENERAL CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS & THE LIKE.

C. FIELD SUPERINTENDENCE, PROJECT MANAGEMENT, ADMINISTRATION & THE LIKE.

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES, PROJECT PROMOTIONAL, PR


& THE LIKE.
E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL, ELECTRONIC, SANITARY, PLU
COMMUNICATIONS & OTHER UTILITY SYSTEMS, AND EQUIPMENT & FIXTURES ARCH'L LIGHTIN
ACOUSTICS & ALLIED FIELD OF PRACTICE.

F. ARCHITECTURAL INTERIORS/ SPACE PLANNING, RESTORATION/ PRESERVATION & OTHER AN


SERVICES.

PERIOD

PROJECT TITLE/ DESCRIPTION & LOCATION FROM

DAY

COMPANY (NAME)

A. PROJECT 1

Location: LOCATION 1

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE


ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

B. PROJECT 2

Location: LOCATION 2

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE


C. PROJECT 3

Location: LOCATION 3

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE

ACTIVITY/ OR THE WORK DONE


Disclaimer: The Information provided with this file by Madrigal + Lopez Architecture is for educational p
completeness of any information on th

e to make adjustments and revisions. Feel free to make your own format. 😊

THE LOGBOOK

VERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION


SHEET NO. __O

SUMMARY
MINIMUM TOTAL NO. OF HOURS
% (MAX.)
CREDIT HOURS ACCOMPLISHED

ALIZATION, PLANNING & THE


30% 1152 0

G, BILL OF MATERIALS, COST


25% 960 0
WORKS & THE LIKE.

ON & THE LIKE. 15% 576 0

OJECT PROMOTIONAL, PRE-DESIGN


10% 384 0
CTRONIC, SANITARY, PLUMBING,
XTURES ARCH'L LIGHTING, 10% 384 0

SERVATION & OTHER ANCILLARY


10% 384 0

TOTAL 100% 3840 0

PERIOD COVERED
CORRESPONDING NUMBER OF HOURS OF
DESCRIBED TRAINING (FOP)
FROM TO

MON. YR. DAY MON. YR. A B C D E


Total No. of Hours 0 0 0 0 0
Total No. of Hours 0 0 0 0 0

Total No. of Hours 0 0 0 0 0


re is for educational purposes only. All the Information is provided in good faith. However, we make no representatio
any information on this file. Use this file as reference only. You can make revisions and do what's best and suitable for

SHEET NO. __OF___

REMARKS (to be filled by


PRC)
OF HOURS OF
(FOP) TOTAL NO. OF
HOURS
F

0
0

0 0

0
0 0

0 0
only. All the Information is provided in good faith. However, we make no representation or warranty of any kind, exp
e this file as reference only. You can make revisions and do what's best and suitable for you.

FOR CHECKING / TABULATING OF DAYS & HOUR

0%

0%

0%
← This Table is for you to check if you achieved
to be accomplished per field of work.
0%
to be accomplished per field of work.

0%

0%

0%

Working Hours
No. of Days
Covered
Regular OT

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
0 0 0

0 0 0

Check if the Total no. of Hours tallied. (Note: The values in the 3 orange boxes should be the sam

Working Hours
No. of Days
Covered
Regular OT

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
Check if the Total no. of Hours tallied (the values in the 3 orange boxes should be the same)→

Working Hours
No. of Days
Covered
Regular OT

0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

Check if the Total no. of Hours tallied (the values in the 3 orange boxes should be the same)→
h. However, we make no representation or warranty of any kind, express or implied, regarding the accuracy, validity,
ns and do what's best and suitable for you.

FOR CHECKING / TABULATING OF DAYS & HOURS

his Table is for you to check if you achieved the required number of hours
e accomplished per field of work.
e accomplished per field of work.

Notes:

1. Manually count the number of days based on the activity you have done under PERIOD COVERED (in TH
LOGBOOK) and put it in the No. of Days Covered Column. (in the Checking)

2. After putting the number of days on the No. of Days Covered Column, put the number of OT hours you acqui

3. After that, you'll get the number of Regular and Overtime Hours for the activity/ work you've done.

4. Get the sum of Regular & OT Hours accumulated and put it to the corresponding FIELD OF WORK.

5. Make sure you put the number of hours of the activity on its proper FIELD OF WORK to avoid mistakes an
confusion.

6. Check twice to thrice. Do it on scratch paper first. Make it neat and clean.

Additional Reminders:

1. As much as possible, OT should not exceed 10 hours per week (Consider 2 hours a day only) to avoid suspici
2. As much as possible,we advise to not included holidays.

3. As much as possible, your total accomplished hours should be higher than minimum credit hours. Don't aim f
exact 3840 Hours.

urs tallied. (Note: The values in the 3 orange boxes should be the same)→ 0

Notes:

1. Manually count the number of days based on the activity you have done under PERIOD COVERED (in TH
LOGBOOK) and put it in the No. of Days Covered Column. (in the Checking)

2. After putting the number of days on the No. of Days Covered Column, put the number of OT hours you acqui

3. After that, you'll get the number of Regular and Overtime Hours for the activity/ work you've done.

4. Get the sum of Regular & OT Hours accumulated and put it to the corresponding FIELD OF WORK.

5. Make sure you put the number of hours of the activity on its proper FIELD OF WORK to avoid mistakes an
confusion.

6. Check twice to thrice. Do it on scratch paper first. Make it neat and clean.

Additional Reminders:

1. As much as possible, OT should not exceed 10 hours per week (Consider 2 hours a day only) to avoid suspici

2. As much as possible,we advise to not included holidays.

3. As much as possible, your total accomplished hours should be higher than minimum credit hours. Don't aim f
exact 3840 Hours.
Hours tallied (the values in the 3 orange boxes should be the same)→ 0

Notes:

1. Manually count the number of days based on the activity you have done under PERIOD COVERED (in TH
LOGBOOK) and put it in the No. of Days Covered Column. (in the Checking)

2. After putting the number of days on the No. of Days Covered Column, put the number of OT hours you acqui

3. After that, you'll get the number of Regular and Overtime Hours for the activity/ work you've done.

4. Get the sum of Regular & OT Hours accumulated and put it to the corresponding FIELD OF WORK.

5. Make sure you put the number of hours of the activity on its proper FIELD OF WORK to avoid mistakes an
confusion.

6. Check twice to thrice. Do it on scratch paper first. Make it neat and clean.

Additional Reminders:

1. As much as possible, OT should not exceed 10 hours per week (Consider 2 hours a day only) to avoid suspici

2. As much as possible,we advise to not included holidays.

3. As much as possible, your total accomplished hours should be higher than minimum credit hours. Don't aim f
exact 3840 Hours.

Hours tallied (the values in the 3 orange boxes should be the same)→ 0
ng the accuracy, validity, or

number of hours
RIOD COVERED (in THE
e Checking)

ber of OT hours you acquired.

vity/ work you've done.

ing FIELD OF WORK.

ORK to avoid mistakes and

and clean.

day only) to avoid suspicion.


s.

m credit hours. Don't aim for

RIOD COVERED (in THE


e Checking)

ber of OT hours you acquired.

vity/ work you've done.

ing FIELD OF WORK.

ORK to avoid mistakes and

and clean.

day only) to avoid suspicion.

s.

m credit hours. Don't aim for


0

RIOD COVERED (in THE


e Checking)

ber of OT hours you acquired.

vity/ work you've done.

ing FIELD OF WORK.

ORK to avoid mistakes and

and clean.

day only) to avoid suspicion.

s.

m credit hours. Don't aim for

0
Disclaimer: The

NOTE: We don't protect the cells/ sheets containing computation for your ease of use to make adjustments and rev

THE LO

LOG SHEET OF DIVERSIFIED TRAINING FO


CANDIDATE:NAME

SUMM

FIELD OF PRACTICE

A. ARCHITECTURAL DESIGNING/ DRAFTING, STRUCTURAL CONCEPTUALIZATION, PLANNING &


LIKE.

B. PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATION WRITING, BILL OF MATERIALS, C


ESTIMATES, GENERAL CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS & THE LIKE.

C. FIELD SUPERINTENDENCE, PROJECT MANAGEMENT, ADMINISTRATION & THE LIKE.

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES, PROJECT PROMOTIONAL, PR


& THE LIKE.
E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL, ELECTRONIC, SANITARY, PLU
COMMUNICATIONS & OTHER UTILITY SYSTEMS, AND EQUIPMENT & FIXTURES ARCH'L LIGHTIN
ACOUSTICS & ALLIED FIELD OF PRACTICE.

F. ARCHITECTURAL INTERIORS/ SPACE PLANNING, RESTORATION/ PRESERVATION & OTHER AN


SERVICES.

PERIOD

PROJECT TITLE/ DESCRIPTION & LOCATION FROM

DAY

COMPANY NAME

A. PROJECT 1

Location: LOCATION 1

Assisted in site inspections to the site. 16

Preparation of Architectural Programming for Additional Model House Units 22

Preparation of Schematic Design for Additional Model House Units 27

Preparation of Architectural Drawings for Additional Model House Units 13

Preparation of 3D Exterior Perspective (4 Samples) 29

Preparation of Ceiling, Wall and Floor Finishes 13

Preparation of Architectural Interior Details for Bedroom, Stairs, Kitchen and Toilet 20

Assisted on Preparation of Architectural Layouting for Electrical and Plumbing 15


Assisted on Preparation of Specification and Materials 25

Assisted on Preparation of Bill of Materials and Cost Estimate 2

B. PROJECT 2

Location: LOCATION 2

Assisted on Detailed Analysis and Studies of the Site 13

Assisted on site inspection to the site. 26

Assisted on Preparation of Initial Studies 2

Assisted Preparation of Architectural Programming 17

Assisted on preparation of Schematic Design 22

Preparation of Architectural Drawings 12

Assisted on Structural Conceptualization 2

Preparation of 3D Exterior Perspective (3 Samples) 19

Preparation of Ceiling, Wall and Floor Finishes 7

Assisted on Preparation of Architectural Interior Details for Condo Unit, Stairs and
21
Toilet
Assisted on Preparation of Architectural Layouting for MEPF 4

Assisted on Preparation of Specification in Materials 14

Assisted on Preparation of Bill of Materials and Cost Estimate 11

Assisted on Preparation of Contract Document 17

Preparation of Accomplishment Reports for the meeting with Client/ Owner 6

C. PROJECT 3

Location: LOCATION 3

Assisted on Preparation of Wall, Ceiling and Floor Finishes 13

Revision of 3D Exterior Perspective (2 Sample) 25

Assisted on Preparation of Architectural Layouting for MEPF 3

Assisted on Preparation of Bill of Materials and Specs Writing 13

Assisted on Preparation of Contract Document for Building permit 6

Preparation of Accomplishment Reports for the meeting 19

Site Inspections, Site Supervision and Weekly Reports 5


D. PROJECT 4

Location: LOCATION 4

Site Supervision and Weekly Reports for the Office Renovation 1


Disclaimer: The Information provided with this file by Madrigal + Lopez Architecture is for educational p
completeness of any information on th

e to make adjustments and revisions. Feel free to make your own format. 😊

THE LOGBOOK

VERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION


SHEET NO. __O

SUMMARY
MINIMUM TOTAL NO. OF HOURS
% (MAX.)
CREDIT HOURS ACCOMPLISHED

ALIZATION, PLANNING & THE


30% 1152 1266

G, BILL OF MATERIALS, COST


25% 960 1074
WORKS & THE LIKE.

ON & THE LIKE. 15% 576 704

OJECT PROMOTIONAL, PRE-DESIGN


10% 384 444
CTRONIC, SANITARY, PLUMBING,
XTURES ARCH'L LIGHTING, 10% 384 418

SERVATION & OTHER ANCILLARY


10% 384 432

TOTAL 100% 3840 4338

PERIOD COVERED
CORRESPONDING NUMBER OF HOURS OF
DESCRIBED TRAINING (FOP)
FROM TO

MON. YR. DAY MON. YR. A B C D E

5 17 20 5 17 40

5 17 26 5 17 44

5 17 9 6 17 98

6 17 28 6 17 118

6 17 12 7 17 96

7 17 19 7 17 48

7 17 14 8 17

8 17 24 8 17 62
8 17 1 9 17 42

9 17 12 9 17 86

Total No. of Hours 360 128 40 44 62

9 17 25 9 17 88

9 17 30 9 17 40

10 17 16 10 17 104

10 17 21 11 17 208

11 17 11 12 17 120

12 17 1 2 18 342

2 18 15 2 18 108

2 18 6 3 18 112

3 18 20 3 18 96

3 18 3 5 18
5 18 13 6 18 272

6 18 10 7 18 184

7 18 16 8 18 266

8 18 5 9 18 96

9 18 12 9 18 48

Total No. of Hours 778 546 88 400 272

9 18 24 9 18 82

9 18 29 9 18 46

12 18 12 12 18 84

12 18 1 2 19 312

2 19 18 2 19 88

2 19 4 3 19 80

3 19 16 3 19 92
Total No. of Hours 128 400 172 0 84

10 18 29 11 18 404

Total No. of Hours 0 0 404 0 0


re is for educational purposes only. All the Information is provided in good faith. However, we make no representatio
any information on this file. Use this file as reference only. You can make revisions and do what's best and suitable for

SHEET NO. __OF___

REMARKS (to be filled by


PRC)
OF HOURS OF
(FOP) TOTAL NO. OF
HOURS
F

40

44

98

118

96

48

176 176

62
42

86

176 810

88

40

104

208

120

342

108

112

96

256 256
272

184

266

96

48

256 2340

82

46

84

312

88

80

92
0 784

404

0 404
only. All the Information is provided in good faith. However, we make no representation or warranty of any kind, exp
e this file as reference only. You can make revisions and do what's best and suitable for you.

FOR CHECKING / TABULATING OF DAYS & HOUR

110%

112%

122%

116%
109%

113%

113%

Working Hours
No. of Days
Covered
Regular OT

5 40 0

5 40 4

12 96 2

14 112 6

12 96 0

6 48 0

22 176 0

7 56 6
5 40 2

9 72 14

Check if the Total no. of Hours tallied. (Note: The values in the 3 orange boxes should be the sam

Working Hours
No. of Days
Covered
Regular OT

11 88 0

5 40 0

13 104 0

26 208 0

14 112 8

41 328 14

12 96 12

14 112 0

12 96 0

30 240 16
32 256 16

23 184 0

32 256 10

12 96 0

6 48 0

Check if the Total no. of Hours tallied. (Note: The values in the 3 orange boxes should be the sam

Working Hours
No. of Days
Covered
Regular OT

10 80 2

5 40 6

9 72 12

39 312 0

11 88 0

10 80 0

11 88 4
Check if the Total no. of Hours tallied. (Note: The values in the 3 orange boxes should be the sam

Working Hours
No. of Days
Covered
Regular OT

49 392 12

Check if the Total no. of Hours tallied. (Note: The values in the 3 orange boxes should be the sam
h. However, we make no representation or warranty of any kind, express or implied, regarding the accuracy, validity,
ns and do what's best and suitable for you.

FOR CHECKING / TABULATING OF DAYS & HOURS


urs tallied. (Note: The values in the 3 orange boxes should be the same)→ 810
urs tallied. (Note: The values in the 3 orange boxes should be the same)→ 2340
urs tallied. (Note: The values in the 3 orange boxes should be the same)→ 784

urs tallied. (Note: The values in the 3 orange boxes should be the same)→ 404
ng the accuracy, validity, or
810
2340
784

404

You might also like