0% found this document useful (0 votes)
275 views

PSW Signature Template

This document summarizes a part submission from Winchester Interconnect (M) Sdn. Bhd. to Jabil for an initial PPAP level 3 submission. It includes details of the part number, revision, drawings, weight and submission reason. Winchester confirms the samples are representative and certifies compliance with manufacturing processes. Jabil approved the submission on February 23rd, 2022.

Uploaded by

KM Mui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
275 views

PSW Signature Template

This document summarizes a part submission from Winchester Interconnect (M) Sdn. Bhd. to Jabil for an initial PPAP level 3 submission. It includes details of the part number, revision, drawings, weight and submission reason. Winchester confirms the samples are representative and certifies compliance with manufacturing processes. Jabil approved the submission on February 23rd, 2022.

Uploaded by

KM Mui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Part Submission

Jabil Production Part Approval Process (JPPAP)

Submission Date: 11-Nov-2021 Part Description: VA,COMP_PREPPING (LA1000-003Y)

Part Number: LA1000-003Y Revision / ECN: B Project Name: JABIL-LAM


Part Weight Runner Weight PPAP
Drawing No /Rev 07-ME40-LAMGEN2-001/B Drawing Pages 1-4 (grms): (grms): Level

Details of Submission 1st Submission Refer Invoice Refer Invoice 3


Supplier Information and Declaration
I affirm that the samples represented by this warrant are representative of our parts, which were made by a process with controls indicative of good manufacturing practices. I also certify
that documented evidence of such compliance is on file and available for review. Advanced notification for any change to the part/process or manufacturing location will be provided via
the PCN process and obtain the approval from Jabil in advance of the change implementation.

Supplier Name: Winchester Interconnect (M) Sdn. Bhd. Submitted By: YH Ong
Address: No.1651, Lorong Perusahaan Maju 8, Title: NPI ENGINEER
Manufacturing Location: Prai Industrial Estate 4, 13600 Prai, Penang. Signature:

Need for this Submission


Submission Reason Submission Documentation
(If Yes, tick the box) ?

✘ Initial Submission Design Record

Engineering Change(s) to design records Authorized Engineering Change Documents, if any

Tooling:Transfer, Replacement, Refurbishment Customer Engineering Approval, if required

Correction of Discrepancy Design FMEA

Change to Optional Construction or Material Process Flow Diagrams ✘

Change in Part Processing Process FMEA ✘

Sub-Supplier, Manufacturing or Material Source Change Control Plan ✘

Tooling inactive > 12 Months Gage Repeatability and Reproducibility Report


Parts Produced at Additional Location Dimensional Results - FAIR


Material, Performance Test Results ✘

Dimensional FAI Submission Results Initial Process Studies - Cpk

Qualified Laboratory Documentation


Parts / Samples meet all drawing
specifications requirements? Appearance Approval Report (AAR), if applicable ✘

Yes ✘ Sample Product ✘

No Jabil Specific Requirements


If No, Deviation- Action sheet to be completed. (if any, list below)

Parts are cosmetically acceptable


Yes ✘ No
Is each Customer Tool properly tagged and numbered ? Yes No N/A ✘ If no customer tool available, tick "N/A".
If Yes, fill the Tool No. here: If No, explain the reason here: N/A
Supplier Comments (leave it blank if no comments)
1, FA Quantity not enough to compute Cpk. Reference IPC/WHMA-A-620 for unstate dimension tolerance.
2, For Process FMEA, we only follow the IPC/WHMA-A-620B standard only

Print Name: SY Cheah Title: QA Engineer Phone: 04-5083535 Fax: 04-5080810

Supplier Authorized Signature: S Y Cheah Email: [email protected] Date: 11-Nov-2021

Submission Sign Off ( Jabil / Customer)


Approval Status
Approved ✘ Jabil Representative (Signature) Date 23rd Feb 2022
Rejected Printed Name Kian Meng Mui

Customer Representative (Signature). "Not Mandatory"


Approved / Agreed Run Rate
Printed Name Date

Comments:
Form 00-MT80-1000-00801-G

You might also like