Christopher Design Building Project

The document contains tables showing the scheduling of activities for the Christopher Design/Building Project, including earliest and latest start/finish times and expected durations. It shows the critical path activities that determine the minimum project duration. The critical path runs through designing mechanical equipment, designing electrical equipment, procuring electrical equipment, installing mechanical and electrical equipment, and constructing phase II of the building. The project schedule is estimated to last 29 weeks.

Uploaded by

MrSamspart
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Christopher Design Building Project

The document contains tables showing the scheduling of activities for the Christopher Design/Building Project, including earliest and latest start/finish times and expected durations. It shows the critical path activities that determine the minimum project duration. The critical path runs through designing mechanical equipment, designing electrical equipment, procuring electrical equipment, installing mechanical and electrical equipment, and constructing phase II of the building. The project schedule is estimated to last 29 weeks.

Uploaded by

MrSamspart
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 13

FIGURE 3.

4 Total Float Tabulation for the Christopher Design/Building Project


Activity Description Latest Earliest Time
Code Finish Time - Start Time - Estimate for
Completing
Activity
(1-4) Design mechanical equipment 6 0 6
(4-5) Design electrical equipment 10 6 4
(5-6) Procure electrical equipment 17 10 7
(6-7) Install mechanical and electrical 23 17 6
equipment
(7-11) Construct phase II building 29 23 6
(1-2) Design structural steel 7 0 2
(1-3) Design building 17 0 13
(2-3) Fabricate and erect structural steel 17 2 10
(3-7) Construct phase I building 23 13 6
(4-6) Fabricate mechanical equipment 17 6 9
(4-8) Design interior items 15 6 2
(8-9) Procure interior items 19 8 4
(9-10) Install interior items 29 12 10
* Critical path items

FIGURE 3.5 Tabulated schedule for the Christopher Design/Building Project


Activity Description Time (Wks) Earliest Latest
Code Start Finish Start Finish
(1-2) Design structural steel 2 0 2 5 7
(1-3) Design building 13 0 13 4 17
(1-4) Design mechanical equipment 6 0 6 0 4
(2-3) Fabricate and erect structural steel 10 2 12 7 17
(3-7) Construct phase I building 6 13 19 17 23
(4-5) Design electrical equipment 4 6 10 6 10
(4-6) Fabricate mechanical equipment 9 6 15 8 17
(4-8) Design interior items 2 6 8 13 15
(5-6) Procure electrical equipment 7 10 17 10 17
(6-7) Install mechanical and electrical 6 17 23 17 23
equipment
(7-11) Construct phase II building 6 23 29 23 29
(8-9) Procure interior items 4 8 12 15 19
(9-10) Install interior items 10 12 22 19 29
(10-11) Dummy 0 22 22 29 29
* Critical path items
FIGURE 3.6 Calendar schedule for the Christopher Design/Building Project
Activity Description Time (Wks) Earliest Latest
Code Start Finish Start Finish
(1-2) Design structural steel 2 10/2/1995 10/16/1995 11/6/1995 11/20/1995
(1-3) Design building 13 10/2/1995 1/1/1996 10/30/1995 1/29/1996
(1-4) Design mechanical equipment 6 10/2/1995 11/13/1995 10/2/1995 11/13/1995
(2-3) Fabricate and erect structural steel 10 10/16/1995 12/25/1995 11/20/1995 1/29/1996
(3-7) Construct phase I building 6 1/1/1996 2/12/1996 1/29/1996 3/11/1996
(4-5) Design electrical equipment 4 11/13/1995 12/11/1995 11/13/1995 12/11/1995
(4-6) Fabricate mechanical equipment 9 11/13/1995 1/15/1996 11/27/1995 1/29/1996
(4-8) Design interior items 2 11/13/1995 11/27/1995 1/1/1996 1/15/1996
(5-6) Procure electrical equipment 7 12/11/1995 1/29/1996 12/11/1995 1/29/1996
(6-7) Install mechanical and electrical 6 1/29/1996 3/11/1996 1/29/1996 3/11/1996
equipment
(7-11) Construct phase II building 6 3/11/1996 4/22/1996 3/11/1996 4/22/1996
(8-9) Procure interior items 4 11/27/1995 12/25/1995 1/15/1996 2/12/1996
(9-10) Install interior items 10 12/25/1995 3/4/1996 2/12/1996 4/22/1996
* Critical path items

FIGURE 3.6 Calendar schedule for the Christopher Design/Building Project


Activity Description Time (Wks) Earliest Latest
Code Start Finish Start Finish
(1-2) Design structural steel 2 11/8/2021 11/22/2021 12/13/2021 12/27/2021
(1-3) Design building 13 11/8/2021 2/7/2022 12/6/2021 3/7/2022
(1-4) Design mechanical equipment 6 11/8/2021 12/20/2021 11/8/2021 12/20/2021
(2-3) Fabricate and erect structural steel 10 11/22/2021 1/31/2022 12/27/2021 3/7/2022
(3-7) Construct phase I building 6 1/3/2021 2/14/2021 1/31/2021 3/14/2021
(4-5) Design electrical equipment 4 12/13/2021 1/10/2022 12/13/2021 1/10/2022
(4-6) Fabricate mechanical equipment 9 12/13/2021 2/14/2022 12/27/2021 2/28/2022
(4-8) Design interior items 2 12/13/2021 12/27/2021 1/31/2022 2/14/2022
(5-6) Procure electrical equipment 7 1/10/2022 2/28/2022 1/10/2022 2/28/2022
(6-7) Install mechanical and electrical 6 2/28/2022 4/11/2022 2/28/2022 4/11/2022
equipment
(7-11) Construct phase II building 6 4/18/2022 5/30/2022 4/18/2022 5/30/2022
(8-9) Procure interior items 4 1/3/2022 1/31/2022 2/21/2022 3/21/2022
(9-10) Install interior items 10 1/31/2022 4/11/2022 3/21/2022 5/30/2022
FIGURE 3.6 Calendar schedule for the Christopher Design/Building Project
Activity Description Time (Wks) Earliest Latest
Code Start Finish Start Finish
(1-2) Design structural steel 2 10/2/2023 10/16/2023 11/6/2023 11/20/2023
(1-3) Design building 13 10/2/2023 1/1/2024 10/30/2023 1/29/2024
(1-4) Design mechanical equipment 6 10/2/2023 11/13/2023 10/2/2023 11/13/2023
(2-3) Fabricate and erect structural steel 10 10/16/2023 12/25/2023 11/20/2023 1/29/2024
(3-7) Construct phase I building 6 1/1/2023 2/12/2023 1/29/2023 3/12/2023
(4-5) Design electrical equipment 4 11/13/2023 12/11/2023 11/13/2023 12/11/2023
(4-6) Fabricate mechanical equipment 9 11/13/2023 1/15/2024 11/27/2023 1/29/2024
(4-8) Design interior items 2 11/13/2023 11/27/2023 1/1/2024 1/15/2024
(5-6) Procure electrical equipment 7 12/11/2023 1/29/2024 12/11/2023 1/29/2024
(6-7) Install mechanical and electrical 6 1/29/2023 3/12/2023 1/29/2023 3/12/2023
equipment
(7-11) Construct phase II building 6 3/11/2023 4/22/2023 3/11/2023 4/22/2023
(8-9) Procure interior items 4 11/27/2023 12/25/2023 1/15/2024 2/12/2024
(9-10) Install interior items 10 12/25/2023 3/4/2024 2/12/2024 4/22/2024
* Critical path items
Expected Time
Total Float Time (Weeks)
= Most Likely Pessimistic
Activity Optimistic
0* Design mechanical equipment 5 6 9
0* Design electrical equipment 2 4 8
0* Procure electrical equipment 4 7 9
0* Install mechanical and electrical
equipment 5 6 7
0* Construct phase II building 5 6 7
5 29
4
5 Expected Time = Optimistic + 4 x Most \likely + Pessimistic
4 6
2 (Apply only to Critical Path)
7
7
7

Total Float

5
4
0*
5
4
0*
2
7
0*
0*

0*
7
7
7
Total Float

5 35 35
4 28 28
0* 0 0
5 35 35
4 28 28
0* 0 0
2 14 14
7 49 49
0* 0 0
0* 0 0

0* 0 0
7 49 49
7 49 49

Total Float

5 35 35
4 28 28
0* 0 0
5 35 35
4 28 28
0* 0 0
2 14 14
7 49 49
0* 0 0
0* 0 0

0* 0 0
7 49 49
7 49 49
Total Float

5 35 35
4 28 28
0* 0 0*
5 35 35
4 28 28
0* 0 0*
2 14 14
7 49 49
0* 0 0*
0* 0 0*

0* 0 0*
7 49 49
7 49 49
Weeks)

Expected
6.3
4.3
6.8

6
6
29.5

\likely + Pessimistic
Bar chart time schedule for the Christopher Design/Building Project

Activity Weeks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Design structural steel

Fabricate and erect structural steel

Design building

Construct phase I building

Design mechanical equipment

Design electrical equipment

Procure electrical equipment

Install mechanical and electrical equipment

Construct phase II building

Fabricate mechanical equipment

Design interior items

Procure interior items

Install interior items

Critical Bar

Early Bar
Progress Bar

FIGURE 3.8 Bar chart time schedule for the Christopher Design/Building Project
Activity Weeks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Design structural steel


Fabricate and erect structural steel
Design building
Construct phase I building
Design mechanical equipment
Design electrical equipment
Procure electrical equipment
Install mechanical and electrical equipment
Construct phase II building
Fabricate mechanical equipment
Design interior items
Procure interior items
Install interior items
Critical Bar
Early Bar
Progress Bar
Activities/Resources Worksheet
Project Name:
Christopher Design/Building Project

Start End Duration Resources (Daily Requirements)


Description
Node Node (Days) EN AR DE
Start 1 - ------------------------- - - -
1 2 14 Design structural steel 2 - 6
1 3 91 Design building 6 4 12
1 4 42 Design mechanical equipment 4 - 4
2 3 70 Fabricate and erect structural steel 1 - 2
3 7 42 Construct phase I building 3 - -
4 5 28 Design electrical equipment 4 - 8
4 6 63 Fabricate mechanical equipment 2 - 4
4 8 14 Design interior items - 4 8
5 6 49 Procure electrical equipment 2 - 1
6 7 42 Install mechanical and electrical equipment 4 - -
7 11 42 Construct phase II building 5 - -
8 9 28 Procure interior items - 2 2
9 10 70 Install interior items - 2 -
10 11 - Dummy - - -
11 F - -------------------------
1 Milestone Start Project
3 Milestone Complete structural steel EN -- Engineers
6 Milestone Complete electrical equipment- AR -- Architects
design procure DE -- Designers
7 Milestone Complete mechanical and electrical SP -- Skilled Personnel/Labor
Complete phase I
10 Milestone Complete architectural
11 Milestone Complete project

FIGURE 3.12 Sample worksheet for the Christopher Design/Build Project


/Building Project

aily Requirements)
SP
-
-
-
-
10
20
-
-
-
-
16
20
-
12
-

ersonnel/Labor
FIGURE 3.5 Tabulated schedule for the Christopher Design/Building Project Bar chart cost schedule f
Activity Time Earliest Latest Estimated
Description
Code (Wks) Start Finish Start Finish Total Float Cost
(1-2) Design structural steel 2 0 2 5 7 5 40,000 1 2
(1-3) Design building 13 0 13 4 17 4 420,000 Design
(1-4) Design mechanical equipment 6 0 6 0 4 0* 120,000 str'l steel
(2-3) Fabricate and erect structural steel 10 2 12 7 17 5 220,000
(3-7) Construct phase I building 6 13 19 17 23 4 420,000 40
(4-5) Design electrical equipment 4 6 10 6 10 0* 80,000 Design building
(4-6) Fabricate mechanical equipment 9 6 15 8 17 2 90,000
(4-8) Design interior items 2 6 8 13 15 7 40,000
(5-6) Procure electrical equipment 7 10 17 10 17 0* 40,000 Design mechanical equip
(6-7) Install mechanical and electrical equipment 6 17 23 17 23 0* 200,000
(7-11) Construct phase II building 6 23 29 23 29 0* 450,000 120
(8-9) Procure interior items 4 8 12 15 19 7 40,000
(9-10) Install interior items 10 12 22 19 29 7 240,000
* Critical path items

Critical Bar

Early Bar

Progress Bar
Bar chart cost schedule for the Christopher Design/Building Project

Weeks
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Fabricate and erect structural steel

220
Design building Construct phase I building

420 420
Design mechanical equipt Des elect'l equipt Procure electrical equipment Install mech'l elect'l equipt Construct phase II building

120 80 40 200 450


Fabricate mechanical equipment

90
Design
int items Procure intr items Install interior items

40 40 240