sq.
Site Clearing 100 30.00 3,000
m.
cu.
Earth Filling 56 170.00 9,520
m.
cu.
Excavation 82 50.00 4,100
m.
cu.
Gravel Bedding 8 500.00 4,000
m.
sq.
Soil Poisoning 81 25.00 2,025
m.
110,522.9 110,522.
Labor and Equipment 1 lot
2 92
DIVISION 7.0 CEILING WORKS
13,023.1
Labor and Equipment 1 Set 13,023.11
1
12,432.7
Labor and Equipment 1 lot 12,432.78
8
45,214.1
Labor and Equipment 1 Lot 45,214.17
7
Water Line 20mm Dia. PVC Pipe (4m) 3 pcs 260.00 780
1,576,47
TOTAL COST 6155736
3.97
JERICHO P. VINLUAN
Civil Engineer Confirmed