100% found this document useful (1 vote)
135 views

GMDSS Test

Uploaded by

Luciano Sousa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
135 views

GMDSS Test

Uploaded by

Luciano Sousa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 43

HOME NEWS VIDEOS MARINE TECH NAVIGATION SAFETY CAREER LIFE AT SEA NAVAL ARCH

MORE Search In Marine Insight

Daily, Monthly And Weekly Tests Of


GMDSS Equipment On Board Ships
IQ Test: What is your IQ?
Answer 20 questions to find out! test-iq.org
By Paromita Mukherjee | In: Marine Navigation | Last Updated on November 10, 2017

! 28.0K
SHARES " Share27.8K # Tweet 49 $ Share 131 % +1 15

The development of GMDSS (Global Maritime Distress And Safety System) for the shipping industry has
come a long way. The GMDSS system was established with an objective to improve distress and safety
radio communications and procedures at sea.

The greatest benefit of the GMDSS equipment is that it vastly reduces the chances of ships
disappearing without a trace, and enables search and rescue (SAR) operations to be launched without
delay and directed to the exact site of a maritime disaster.

Gone are the days when ships were required to have dedicated radio officers to operate radio equipment.
With the implementation of GMDSS every deck officer with a General Operator Certificate (GOC) and
license is entitled to use the GMDSS equipment and make radio communications when needed.

AdChoices

TESTING OF EQUIPMENT EXCEL FREE TEST

SAFETY CHECKLIST SHIFT REPORT TEMPLATE

For the GMDSS equipment to function properly and effectively in the event of an emergency, it is critical
that mariners understand its purpose and do the required maintenance on board the vessel to keep it in a
working condition and make the best use of GMDSS equipment.

The daily, weekly and monthly tests of all the GMDSS equipment should be done by every navigating
officer responsible for it without any compromise. We must not forget that it is our only best friend in a
distress situation at sea.

Ships at sea must be capable of performing the nine functional GMDSS requirements. They are:

1. Ship-to-shore distress alerting


2. Shore-to-ship distress alerting
3. Ship-to-ship distress alerting
4. SAR coordination
5. On-scene communications
6. Transmission and receipt of emergency locating signals
7. Transmission and receipt of MSI
8. General radio communications
9. Bridge-to-bridge communications

This can be ensured by testing the GMDSS equipment at regular intervals.

The GMDSS equipment and systems include the VHF DSC/RT, MF/HF DSC/RT, INMARSAT, SART,
EPIRB, NAVTEX, and SURVIVAL CRAFT TWO WAY VHF.

Daily Tests On GMDSS Equipment

The proper functioning of the Digital Selective Calling (DSC) facilities shall be tested at least once each
day, without radiation of signals, by the use of the equipment’s Internal test facility. The daily test checks
the internal connection, transmitting output power and the display. The process can differ from equipment
to equipment based on the make.
The daily test of the FURUNO model of the VHF equipment can be executed as below:

1.At the standby display press the SHIFT key followed by the TEST key. The “TEST IN PROGRESS” pop
up window appears momentarily and distress alarm both visual and audible occurs.

The display shows the TEST screen. If everything is okay with the set and is functioning properly, the
results show OK as below. However, in some situation or if it’s a faulty equipment, ‘NG’ may be displayed.
In this case the daily test should be repeated a couple of times. If the problem persists, it should be
immediately brought to the notice of a shore based service engineer.
2. Press the CANCEL key to stop the alarm. To stop the daily test, press the CANCEL key again.

Daily test also needs to be performed on the MF/HF equipment to ensure it will function properly in the
event of distress.

1. Press the [3/TEST] key to start the test. Select the Daily Test by rotating the knob and push to enter.
After several seconds the display shows the test results; OK for normal operation. The audio alarm also
sounds after the test results are displayed and the alarm lamp flashes several times.
2. The CANCEL key should be pressed to quit the test and return to the normal screen.

Batteries providing reserve source of energy should also be checked daily. Mainly the battery ON LOAD
and OFF LOAD voltages are checked by a volt meter connected to the charger.

OFF LOAD: when no equipment are connected, the battery should read 24 V or slightly more.

ON LOAD: switch off the AC power and note the voltage of the battery. Press the PTT on MF/HF
transceiver on a non-distress and idle R/T frequency. Voltage will fall depending upon the load. If the
voltage falls more than 10% it indicates that the battery is either weak or not charged fully. In this case
batteries should be recharged.
It is also important to check that all printers are in a working condition and there is sufficient supply of
paper.

Weekly Tests On GMDSS Equipment

It is necessary to test the proper operation of the DSC facilities at least once a week by means of a test
call over one of the six distress and safety frequencies, when within the communication range of a coast
station fitted with a DSC equipment. A test call to the coast station can be sent in the following ways:

MF/HF DSC:

1. Press the [2/DSC] key at the DSC standby screen and then push the [ENTER] knob to open the CALL
TYPE menu.

2. Rotate the [ENTER] knob to choose TEST CALL and then push the [ENTER] knob. Push the [ENTER]
knob again to open the COAST ID menu.
3. Using the numeric keys, key in the ID of the coast station ID (seven digits) where you want to send the
call depending upon the area you are navigating in and then push the [ENTER] knob. The coast station
ID can be found from the Admiralty List of Radio Signals Volume 1- Maritime Radio Stations.

4.Now push the [ENTER] knob to open the DSC FREQ menu. (Note that here the PRIORITY is
automatically selected to SAFETY.)

5. Rotate the [ENTER] knob to choose an appropriate frequency and then push the [ENTER] knob.
6.Now press the [CALL] key to send the TEST call to the respective shore station.

After the test call has been sent successfully the acknowledgement is received from the shore station.
The audio alarm sounds on receiving the acknowledgement.
Many a times it often happens that the officer do not receive any acknowledgment from the shore station.
In such cases we often take it for granted that the shore station is not sending the acknowledgement.
However, in reality this might not be the case. The problem could be with our equipment too. To make
sure that the MF/HF equipment is in order, it is better we try sending the test call using other frequencies
and to other stations. Even if then we fail to receive any acknowledgement, a test call can be sent to a
passing ship if possible. Instead of keying the coast ID, key in the MMSI of the passing ship. It is better to
call the ship and confirm if they have received the test call. We can also request them to send us a test
call to ensure that the equipment receiving facility is functioning properly.

It is also recommended that a station to station test takes place using VHF DSC.

1. Press the CALL key. This will open the compose message screen where the call type can be selected.
Rotate the channel knob to select TEST call.
2.Enter the Station ID, in this case the MMSI of your own ship and then press the CALL key for it to be
transmitted.
The audio and visual alarm is generated and test call is received on the other VHF station. Press cancel
to terminate the test call.

Monthly Tests On GMDSS Equipment

EPIRB: The Emergency Position Indicating Radio Beacon should be examined by carrying out a self test
function without using the satellite system. No emergency signal is transmitted during the self test. During
the self test the battery voltage, output power and frequency is checked. The EPIRB should also be
checked for any physical damage. The expiry date of the battery unit and that of the hydrostatic release
unit should be checked. Also check that the safety clip is properly attached and in place.
To perform the self test on the JOTRON EPIRB:

1. The EPIRB should be removed from the bracket first.


2. The spring loaded switch on top of the EPIRB is then lifted to the TEST position.
A successful test will consist of a series of blinks on the LED test-indicator, followed by a continuous light
and a strobe flash after approximately 15 seconds. The last green led indicates a successful test.

3. After the successful completion of the test the switch is released and the EPIRB is put back into the
bracket.

SART: The Search and Rescue Transponder is also equipped with a self test mechanism to test the
operational function of the beacon. The SART is tested using the ship’s X band radar. The test should
preferably be done in open seas to avoid interference on the radar display.
1. Remove the SART from the mounting bracket.
2. The SART should be held by one person in view of the radar scanner. This could be done from the
bridge wings. The SART should then be put on the TEST mode by rotating it to the left to the
TESTPREVUE position for a brief period.
Visual lights operate and bleeps are heard indicating that the SART has been triggered.

3. Simultaneously a person should observe the radar display for the correct pattern. At least 11
concentric circles appear on the radar display if kept on a 12 M range scale. The distance between
two rings is approximately 0.64 NM.

4. The SART should also be visually inspected for any signs of physical damage. The battery expiry
date should also be noted. The safety clip should be in place.

SURVIVAL CRAFT TWO WAY PORTABLE VHF EQUIPMENT

Each survival craft two way VHF equipment should be tested at least once a month to ensure proper
operation in case of a distress situation. It should be tested on a frequency other than vhf channel 16
(156.8 MHz). The expiry date of the battery needs to be checked and changed when required.

1. Press the power key to switch on or off.

2. To select a different channel, press the CH key and use the arrow keys to select the required channel.
The selected channel is indicated with channel number and frequency on the screen.
3. Press the PTT (Push to talk) to communicate with another radio telephone to test receive and transmit
functions. One person can stand near the VHF receiver to receive a test call from the handheld radio.
The symbol ‘TX’ is shown when the PTT is pressed and transmission takes place. The TX indicator
indicates that carrier is produced at the antenna output.

When it receives a signal the symbol ‘RX’ is indicated on the display.


NAVTEX :

The Navtex is an equally important GMDSS equipment and is the source of maritime safety information. It
is also equipped with a test function that can test the battery, keyboard, LCD, ROM and RAM. It is a good
practice to test the Navtex and detect error if any. The Furuno model of Navtex can be tested as follows:

1. Press the MENU/ESC key to open the main menu.

2. Now use the navigating arrows to choose SERVICE and then hit ENT. The SERVICE sub menu
contains the TEST option. Use the down arrow key to select TEST and press ENT key. Choose YES and
press the ENT key again. The TEST will start and the results will be displayed on the screen after few
seconds.
If the test is successful the results show OK otherwise it will show NG meaning – No Good.
It also tests each key for proper functioning.
The Rx test screen shows as follows:
The test results can be printed and filed in the GMDSS log book.

INMARSAT: The INMARSAT is also equipped with a diagnostic test which checks it for proper operation.
The steps to perform a Diagnostic Test on FURUNO INMARSAT are given below;

1. On the keyboard press the F7 key to display the ‘OPTIONS’ menu.


2. Use the down arrow to open the TEST menu and then select the DIAGNOSTIC TEST. Select YES
to begin the test.
On completion of the test, the results are shown on the screen as below. The ESC key is used to return
to the main menu.
A PV test or Performance Verification test can be performed every month. This test consists of receiving
a test message from an LES (Local Earth Station), transmitting a message to an LES and a distress alert
test. The PV TEST can be opened from the TEST menu under OPTIONS as mentioned above.
The status shows ‘TESTING’ when the test is in process.
The status changes to IDLE on completion of the PV Test.
The test results can be seen from the option ‘PV Test Result’ under the TEST menu. The test results can
be printed and logged. BBER denotes the bulletin board error rate. Pass appears for no error. “PASS”
appears for satisfactory completion of the test.
BATTERY: The battery connections and compartment should also be checked. The level of the
electrolyte and the specific gravity of each cell should be checked and recorded. Sulfation can reduce the
specific gravity thereby reducing the battery capacity. Maintenance free batteries on board however do
not require any such checks.
It is recommended every month to visually check all antennas for security of mounting and visible
damage to the cables. The antennas are located on the monkey island. Any deposit of dirt and salt
should be removed. It is also important to check the condition of the aerials and insulators along with the
help of an electrical officer. Ensure that the equipment is switched off and isolated before carrying out any
work on the antenna.

GMDSS enables a ship in distress to send an alert using various radio systems. It is therefore important
that all the GMDSS equipment are maintained in a state of readiness and working condition. To achieve
this it is mandatory to perform the daily, weekly and monthly tests. Only then can we ensure the safety of
the ship and its crew.

Disclaimer: The authors’ views expressed in this article do not necessarily reflect the views of Marine
Insight. Data and charts, if used, in the article have been sourced from available information and have not
been authenticated by any statutory authority. The author and Marine Insight do not claim it to be
accurate nor accept any responsibility for the same. The views constitute only the opinions and do not
constitute any guidelines or recommendation on any course of action to be followed by the reader.

The article or images cannot be reproduced, copied, shared or used in any form without the
permission of the author and Marine Insight.

Report an Error

Subscribe To Free Daily Newsletter!


Get Free News Updates Delivered Directly To Your Inbox

Enter your Best Email SUBSCRIBE

Related
Inmarsat FleetBroadband Takes Major Introduction to Global Maritime Distress
Step To Formal GMDSS Approval Safety System (GMDSS) – What You Must
Know

What Marine Communication Systems Are How to do Intentional Grounding or


Used in the Maritime Industry? Beaching of a Ship?

Tags: GMDSS

Want to share your tips and advice? Got questions? Visit the community forum to ask
questions, get answers, meet people, and share your tips!
GET AMAZING DISCOUNTS ON MARITIME EBOOKS – CLICK BELOW TO KNOW MORE

eBooks For Engine eBooks For Deck Combo Packs at


Department Department Discounted Prices

YOU MAY ALSO LIKE


WHAT ARE YOU LOOKING FOR?

Search In Marine Insight

MORE POSTS FROM THE AUTHOR

15 Things To Consider While 3 Important Man Overboard Important Pilot Transfer


Using Radar On Ships Recovery Methods Used At Arrangements And SOLAS
Sea Requirements For Ships

About Paromita Mukherjee


Paromita has completed graduation in Nautical Science and is presently preparing for 2nd
mate exams. Besides sailing, she love to read books and to travel. She has also won
many awards in music.
Comments

Laurentiu V says
OCTOBER 10, 2016 AT 9:36 PM

The EPIRB test should be performed in the first 5 minutes of an hour.


Their is also an AIS test.
Nice article!

ali says
OCTOBER 12, 2016 AT 9:10 PM

my favorites list for bridge electronics

Radar: Fruno
Gmdss: Sailor
Ais:Fruno

paul kuagbecha Ighoshemusua says


JULY 25, 2017 AT 9:44 PM

very educational, i love it and it improved my knowledge of the almighty GMDSS. Thanks.

paul kuagbecha Ighoshemusua says


JULY 25, 2017 AT 9:48 PM

very educative, easy to learn, i love it and thank you.


Garmin marine electronics Auckland says
AUGUST 2, 2017 AT 6:43 PM

Your blog gives us the very good knowledge about the different type of test which should be
carried out on GMDSS equipment. These tests are necessary as GMDSS should always be in
the perfect condition as it is required for radio communications at sea.

Anish says
AUGUST 3, 2017 AT 12:44 PM

Glad it is useful to fellow seafarers.

Leave a Reply

Your email address will not be published. Required fields are marked *

Comment

Name *

Email *
POST COMMENT

I NEED HELP TO LEARN..

! %
How To Join Ship
Merchant Navy Stability

" &
Financial Marine
Planning Boiler

# '
Ship Ship Safety
Navigation Procedures

$ (
Ship Operation About Lifestyle
Guidelines At Sea

POPULAR NOW

CMA CGM Becomes World’s First Company To Use


LNG For 22,000 TEU Ships

Photos: “Milan Maersk” To Become The Largest


Container Ship To Visit ABP Southampton

Wärtsilä Introduces Innovative Pre-Swirl Stator To


Improve Fuel Efficiency

Wagenborg Awarded For Innovative And


Sustainable Vessel Design

MOL Methanol Carrier “San Fernando” Rescues


Castaway

Download 12 FREE eBooks


Enter your Best Email

DOWNLOAD NOW

LATEST FORUMS POSTS

What is the maximum rudder angle at full


sea speed ? Any idea abou…

Please find attahced the RPSL list from


DG shipping as of Oct-2017…

Why cargo sea chest integrity test


pressure is 3,5kg/cm2 ??

Hello everyone! Few days ago i saw


these ships (capesizes & s…

Why are almost all of the ships drawing


plan (eg. GA plan) showing…

Click HERE To Ask A Question

MARITIME EVENTS

Green Ship Technology


15th Nov, New York

Green Shipping And Technology Summit


28th Nov, Athens

Marintec China
5th Dec, Shanghai

View all Events

NEWS FROM NASDAQ


PHOTO RELEASE–Huntington Ingalls Industries
Christens Destroyer Delbert D. Black (DDG 119)

LNG Bunkering The Future Of Marine


Transportation, To Grow At CAGR Of 62.5% During
2017-2023 And Is Expected To Reach USD 24,684.6
Million In 2023

KVH Launches New High-Speed Maritime Network


On Intelsat Epic(NG) Satellites

Privacy Policy | Refund Policy | Contact Us | Disclaimer | About Us | Team | Advertise | Send Us News

Copyright © 2010 - 2017 Marine Insight — All Rights Reserved |

You might also like