91mwac Layla PV Project in Saudi Arabia

The document outlines procedures for pile load testing for the 91MWac Layla PV Project in Saudi Arabia. The project owner is M/s. ACWA POWER and the EPC contractor is M/s. JAKSON GREEN PRIVATE LIMITED. The document provides procedures for load testing piles to support the solar panels at the 91 megawatt alternating current Layla photovoltaic project located in Saudi Arabia.

Uploaded by

Priyanka Guleria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views

91mwac Layla PV Project in Saudi Arabia

The document outlines procedures for pile load testing for the 91MWac Layla PV Project in Saudi Arabia. The project owner is M/s. ACWA POWER and the EPC contractor is M/s. JAKSON GREEN PRIVATE LIMITED. The document provides procedures for load testing piles to support the solar panels at the 91 megawatt alternating current Layla photovoltaic project located in Saudi Arabia.

Uploaded by

Priyanka Guleria
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

91MWac Layla PV Project in Saudi Arabia

REV DATE DESCRIPTION PREPARED CHECKED APPROVED

R0 15-04-23 ISSUED FOR APPROVAL PG MS SD

OWNER M/s. ACWA POWER

OWNER
CONSULTANT

EPC
M/s. JAKSON GREEN PRIVATE LIMITED
CONTRACTOR

PROJECT 91MWac Layla PV Project in Saudi Arabia


DOCUMENT MMS Pile Load Test Procedures
NAME

ACWA DOC. No: LAY-PV-C-STD-010-0-IFA MMS Pile Load Test Procedures


REV-00
SUBMITTED FOR APPROVAL DATE
PLACE RESERVED FOR STAMPS

PREPARED BY 15-04-23

CHECKED BY 15-04-23

APPROVED BY 15-04-23