Method Statement: Emergency Repair of Detoriated Manholes
Method Statement: Emergency Repair of Detoriated Manholes
Statement
Emergency repair of detoriated manholes
Client: EMAAR
Contractor: ON ROADING CONTRACTING LLC
Al Khail Civil Method Statement BT-MS-25
Page 1 of 3
1. Scope
This Method Statement describes the proper work procedure that shall be
carried out during the works for Replacement of rusted manhole
2. Materials
4. Work Procedure
With the jack hummer the existing asphalt will be broken and removal from
the area with 3 ton tippers.
Removal of existing damaged manhole cover with slab and Steel I – beam
cart to tip DM yard.
Al Khail Civil Method Statement BT-MS-25
Page 3 of 3
Site clearance and removal of safety measures and opening the road for
traffic.
Al Khail Civil Method Statement BT-MS-25
Page 4 of 3
6. Safety
6.1 All works shall comply with safety procedure or instruction as set in
out in project Safety Plan and Municipality rules and regulation.
6.2 Basic Personal Protective Equipment ( PPE ) shall be worn by all staff
or laborers.
6.3 All electrical equipment’s to be checked by an electrician before
starting the work.
6.4 Heavy machines to have banks man at all times to avoid any clashes.
6.5 Traffic to be managed smoothly to avoid clashes and traffic
congestion.