product or service to be competitive in the open market, development, preliminary design, final design,
the best value is determined by two considerations, procurement and construction.
namely, function and cost of product. Value of a product • Manufactured products, whether consumer,
or service can be enhanced either by increasing the industrial, or defence, may be studied with a
function or decreasing the cost or both while maintaining focus on either the design or manufacturing
the performance quality and reliability. [2] process of that product. A product may be the
subject of a value study at any time during the
II. HISTORICAL BACKGROUND product’s life. A value study can be applied at the
onset of the product development to better
Value Engineering had its origin during World understand the customer’s needs, identify the
War II, at General Electric, when innovation was required functions necessary to satisfy those needs, and
because of material shortages. Some critical materials were develop the initial concept. Throughout the design
difficult to obtain, and a great many of substitutions had to development, value methodology can be used to
be made. Mr. Harry Erlicker, a vice president, made the refine and enhance the concept, based on the
observation that many times these changes resulted in latest facts. Even after a product has been
lower costs and improved products. This encouraged him introduced and is in production, a Value Study
to seek an approach to intentionally improve a products can be used to further enhance the product and
value. He assigned Lawrence D. Miles, a staff engineer in respond to changing customer and economic
1947, the task of finding a more effective way to improve conditions. A value methodology can be used to
a product's value. In 1985, the Value Engineering process either develop new ways to manufacture a
had gained worldwide acceptance. It spawned an product or change an existing process.
international organization, Society of American Value • Business systems and processes may also be the
Engineers International (SAVE Int.), dedicated to its subject of Value Studies. Many elements of a
practice, and the certification of competent practitioners. In business or an organization may be improved
1997, SAVE approved a standard for Value Engineering through the application of a value methodology.
Methodology. [3] This may be from the development of business
Shublaq defines value as the most cost effective way to plans and organizational studies to improving
reliably accomplish a function that meet the user's need, existing business processes.
desires and expectations. He used Dell'Isola, expression for Value methodologies may be applied more than
value as follows: once during the life of the project. Early application of a
value methodology helps to get the project started in the
right direction, and repeated applications help to refine the
Where: project’s direction based on new or changing information.
Function: The specific work that a design or item must The later a Value Study is conducted in project
perform. development, more likely implementation costs will
Quality: The owners or users need, desire and expectation. increase. A value methodology may be applied as a quick
Cost: Life cycle cost (LCC). response study to address a problem or as an integral part
of an overall organizational effort to stimulate innovation
III. APPLICABILITY OF VALUE and improve performance characteristics. Value
ENGINEERING methodologies may be used to enhance an organization’s
quality programs, new product development activities,
Value methodologies can be applied during any manufacturing processes, and architectural and
stage of a projects development cycle, although the engineering design. [4]
greatest benefit and resource savings are typically achieved
early in development during the conceptual stages. At this IV. VALUE ENGINEERING IN
point, the basic information of the project is established, CONSTRUCTION
but major design and development resources have not yet Construction projects are becoming bigger in size
been committed. The reason this is the best time to apply a and scope. Construction companies are pressured to
value methodology is because the manner in which the deliver construction projects at a lower cost while
basic function of the project is performed has not been maintaining performance on design functions. The
established, and alternative ways may be identified and engineers have always tried to reduce the cost of
considered. Examples of these applications are: construction without affecting the quality and the
• Construction projects could benefit by identifying functional utility, however their approach was based
improvements for various project phases: concept mainly on the past experience. Keeping costs low with
traditional methods has been a common practice to
4) Evaluation Phase: In Evaluation phase alternative ideas subject of value engineering. As a conclusion, the area of
are ranked and rated and ideas for development are value engineering analysis and study will be controlled by
selected.[6] that functions. Further, we can do analysis of these
The objectives of the evaluation phase are to functions and suggest alternatives and calculate cost model
synthesize ideas and concepts generated in the creativity after application of value engineering technique. For
phase and to select feasible ideas for development into getting a better output for value engineering
specific value improvement. Using the evaluation criteria implementation in a residential building the following data
established during the pre-study effort, ideas are sorted and are essential as a information regarding to the project.
rated as to how well they meet those criteria. [3] • Detailed Contract Documents
5) Development Phase: The Development Phase takes the • Detailed Estimation of the items
most feasible alternatives and prepares information such as • Basic building and site data
sketches, narratives and specifications to improve the • Owner’s requirements for preparation of quality
value of the project.[8] model
The data package prepared by the champion of • Activities involved
each of the alternatives provide as much technical, cost, • Current resource price in market
and schedule information as practical so the designer and • Problems involved
project sponsor may make an initial assessment concerning
• Collection and study of drawings
their feasibility for implementation. [4]
6) Presentation Phase: The presentation phase is actually
presenting the best alternatives to those who have the VII. ACKNOWLEDGMENT
authority to implement the proposed solutions that are
acceptable. [6] It is stern guidance and grandeur of him which
Through the presentation and its interactive has brought this work in a proper channel. This guidance
discussions, the team obtains either approval to proceed not only helps me to collect the knowledge but also to gain
with implementation, or direction for additional the confidence which would help me in future. My
information needed. [7] association with him as a student has been extreme
C. Post-Study pleasing. I would like to express my gratitude towards my
The objective during post-study activities is to respected guide Prof. P.M. Attarde. I pay my sincere
assure the implementation of the approved value study thanks to Prof. P.P. Bhangale, HOD of Civil Engineering
change recommendations. Assignments are made either to Department. I would also like to thank Principal Dr. R.P.
individuals within the VE study team, or by management Singh sir for his encouragement and valuable suggestions.
to other individuals, to complete the tasks associated with Finally heartfelt appreciation to the all those who directly
the approved implementation plan. [3] and indirectly helped me in completion of this experiment.