2013 525 - 40 FT AIR DRILL Assembly and Parts Manual: - 903-030-15-51 E-Mail: Lpv310180@mail - Ru LPV@
2013 525 - 40 FT AIR DRILL Assembly and Parts Manual: - 903-030-15-51 E-Mail: Lpv310180@mail - Ru LPV@
:
http:// texagropark.ru/
. 903-030-15-51
E-mail: [email protected]
[email protected]
« » 396336 .,
- , . , . 7.
( 4« » 519 – ) ./ 8 (473)
233-28-17
E-mail: [email protected]
525 - 40ft Assembly and Parts Manual 2013
Table of Contents
General Information
Salford Recommended Torque Values..........................................................................................................5
Wheel Torque Specifications........................................................................................................................6
Tire Pressure Ratings....................................................................................................................................7
General Safety Precautions...........................................................................................................................8
Frame Assembly
Frame and Wing Assembly.........................................................................................................................10
Wheels and Axles
Main Front Axle Installation.......................................................................................................................12
Main Rear Axle Installation........................................................................................................................14
Wing Front Axle Installation.......................................................................................................................16
Wing Rear Axle Installation........................................................................................................................18
Main Frame Axle Parts...............................................................................................................................20
Wing Axle Parts..........................................................................................................................................22
8000LB Hub & Spindle Assembly.............................................................................................................24
5500LB Hub & Spindle Assembly.............................................................................................................26
5000LB Hub & Spindle Assembly.............................................................................................................28
Tongue Assembly
Tongue Installation......................................................................................................................................30
Operator Station Assembly.........................................................................................................................32
Coulters and Double Disc Openers
Opener Mounting........................................................................................................................................33
Opener Front Section Parts.........................................................................................................................34
Opener Rear Section Parts..........................................................................................................................36
Coil-Tech Coulters......................................................................................................................................38
Coil-Tech Hub.............................................................................................................................................40
525-40’ 7.5” Coulter and Opener Layout...................................................................................................42
525-40’ 7.5” Opener Layout with 15” Fertilizer Openers..........................................................................44
525-40’ 10” Opener Layout with 2” Offset Fertilizer Coulters..................................................................46
525-40’ 10” Opener Layout with 2” Offset Fertilizer Openers..................................................................48
Air Distribution
6 Tower Opener Air Distribution Layout....................................................................................................50
6 Tower Fertilizer Air Distribution Layout.................................................................................................52
8 Tower Opener Air Distribution Layout....................................................................................................54
8 Tower Fertilizer Air Distribution Layout.................................................................................................56
Air Distribution Parts..................................................................................................................................58
Tow Hitch
Rigid Tow Hitch Assembly.........................................................................................................................60
Floating Tow Hitch Assembly.....................................................................................................................62
Tow Hitch Hydraulics.................................................................................................................................64
Hydraulics & Electrical
Depth Control and Work Switch Installation..............................................................................................66
Hydraulic Components Installation............................................................................................................68
Axle Lift Hydraulics ..................................................................................................................................70
Wing Fold Hydraulics ................................................................................................................................72
Lights & SMV Install..................................................................................................................................74
Markers
Optional Marker Installation . .....................................................................................................................76
Decals
Decal Installation Layout . ..........................................................................................................................78
Decal Parts List . .........................................................................................................................................80
Decal Legend . ............................................................................................................................................81
:
http:// texagropark.ru/
Notes
:
http:// texagropark.ru/
General Information
Salford Recommended Torque Values
6$/)25'5(&200(1'('72548(9$/8(6
127(67KHVHUHFRPPHQGHGWRUTXHYDOXHVDUHDSSOLFDEOHZKHQDSSOLHGWRWKHQXW
RQO\7KHVHUHFRPPHQGHGWRUTXHYDOXHVDUHDSSUR[LPDWHRQO\7KHWRUTXHWHQVLRQ
UHODWLRQVKLSLVDIIHFWHGE\OXEULFDWLRQVXUIDFHILQLVKWKUHDGILWSODWLQJORFNZDVKHUVHWF
'2127XVHWKHVHYDOXHVLIDGLIIHUHQWWRUTXHYDOXHRUWLJKWHQLQJSURFHGXUHLVJLYHQIRU
DVSHFLILFDSSOLFDWLRQ7RUTXHYDOXHVOLVWHGDUHIRUJHQHUDOXVHRQO\&KHFNWLJKWQHVVRI
IDVWHQHUVSHULRGLFDOO\
6KHDUEROWVDUHGHVLJQHGWRIDLOXQGHUSUHGHWHUPLQHGORDGV$OZD\VUHSODFHVKHDUEROWV
ZLWKLGHQWLFDOJUDGH
)DVWHQHUVVKRXOGEHUHSODFHGZLWKWKHVDPHRUKLJKHUJUDGH,IKLJKHUJUDGHIDVWHQHUV
DUHXVHGWKHVHVKRXOGRQO\EHWLJKWHQHGWRWKHVWUHQJWKRIWKHRULJLQDO
0DNHVXUHIDVWHQHUVWKUHDGVDUHFOHDQDQGWKDW\RXSURSHUO\VWDUWWKUHDGHQJDJHPHQW
7KLVZLOOSUHYHQWWKHPIURPIDLOLQJZKHQWLJKWHQLQJ
:$51,1* %RWKVLGHVRIWKHXEROW
'RQRWWLJKWHQRQHVLGHRIWKH PXVWEHWLJKWHQHGHTXDOO\
XEROWEHIRUHWKHRWKHUVLGH
NOTE - If wheel does not have chamfers to match profile of the nuts, use flat side of
nuts against rim face.
Install all lug nuts/bolts by hand to prevent cross threading and tighten lug nuts/bolts
following the steps and tightening sequence diagram below.
1 1 1
3 10
3 8
3 6
5 8
5 6
7 6
5 4
7 4
9 4
2 2 2
NOTE - Recheck the torque settings of lug nuts/bolts after 10km (6 miles) and again
after 50km (30 miles). Periodically and at the beginning of each season check the
condition and the torque of the lug nuts/bolts.
ALWAYS ENSURE
DISH FACES HUB
A
710/70 R42 DUAL 710/70 R42 10 BOLT DUAL 710/70 R42 12 BOLT
TORQUE: 300 ft/lbs 42PSI TORQUE: 450-500 ft/lbs 42PSI TORQUE: 450-500 ft/lbs 42PSI
(406 Nm bar 2.89) (Nm 31-34.4 bar 2.89) (Nm 31-34.4 bar 2.89)
DANGER
DANGER
Hydraulics
• DO NOT search for high pressure hydraulic
leaks without hand and face protection. A
tiny, almost invisible leak can penetrate skin,
thereby requiring immediate medical
attention.
• Use cardboard or wood to detect leaks – never
your hands.
• Double check that all is clear before
operating hydraulics.
• Never remove hydraulic hoses or ends
with machine elevated. Relieve hydraulic
pressure before disconnecting hydraulic
hoses or ends.
• Maintain proper hydraulic fluid levels.
• Keep all connectors clean for positive connections.
• Ensure all fittings and hoses are in good condition.
• Do not stand under wings.
General O
Frame Assembly
Frame and Wing Assembly
12
10
9 7 6
11
13
2 3 1 14
:
http:// texagropark.ru/
IMPORTANT
Rotate cylinder gland so 35 34 33
the port is towards the
top. If the port is
towards the side the
fitting will get broken off.
2
30 31 19 41
1
17
23 33 34 35
25 24
11
28 43 42
6
38 39 40
27 26
18 22
4
20 21
36
37
10
LH RH
Complete caster assy
12 13
16
Optional 550/45-
22.5 tires 29 22
15
Standard
19/45-17 tires
13 10 16 17
11 16 17
12 19 20
3
1
15
Complete
axle assy 4
14 8 23 24 23
Main Rear Axle Installation
22 21
9
6
Standard
19/45-17 tires
14 18
7 Optional 550/45-
22.5 tires
03-2013
5 Use this hole
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
23 22 34 35
5
24 25
2 40
11 42
9 29
39
10
38
26
RH LH
1
4 3
LH RH
20 27 28 Complete axle
16 17 assembly
9
18 19
8 21 27 28
14
15
12 13 Complete axle
assembly
LH RH
Standard 31 x 13.5 x 15 tires
Quantities shown are for one front wing axle installation only.
A - for standard 31 x 13.5 x 15 tires
B - for optional 19/45-17 tires
18 19 20
15 17
Complete axle 9 8
assembly
23 RH LH
3
30
1
10
11
21 22 12 27 28 26
29
Wing Rear Axle Installation
25 24
6 Complete axle
4 5
assembly
7 LH RH
03-2013
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
Quantities shown are for one rear wing axle installation only.
A - for standard 31 x 13.5 x 15 tires
B - for optional 19/45-17 tires
15 13
OR
11
14
12
16 10
AIM GREASE
FITTING TO 5
REAR 6
7 8
2
3
18 16
14
17
15
19
12
Aim grease fitting to
front on front axles, aim
to rear on rear axles
13
8
9
10
11
2 3
4 5
6 7
12
8
10
7
11
5
6
16
4
8
3
7
2
14
4
3
2
13
17
6
5
12
4
8
3
7
2
6
5
1
4
3
2
15
Entire assembly available as part number GW8000A (includes hub, spindle, bearings,
seal, dust cap, and hardware).
16
9/16" wheel bolts
15 on hubs prior to
February 11, 2011
10
12
11
7
13
19 6
18
2 8
3
9
5500LB Hub & Spindle Assembly
4
7
6 2
8 3
9 4
03-2013
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
Entire assembly available as part number GW5500A (includes hub, spindle, bearings,
seal, dust cap, and hardware).
17
2
3
4
7
6
14
8
9
13
8
7
5
12
6
10
14
4
11
3
9
2
4
7
3
13
2
15
6
5
4
3
12
2
8
7
1
6
5
4
3
2
16
Complete assembly available as part number GW5000A (includes hub, spindle, bearings,
seals, dust cap, and hardware).
Tongue Assembly
Tongue Installation
12
11
9
1
8
10
13
2
16
15
24
3
23
7
22
21
18
20
14
Cat. 3
17
6
5
19
Cat. 4
4
Tongue Installation
6
15 14 13
5 4
9
3
8
7
1 10 12
1 5
2 2
16
Return to Contents
7
15
15
1
7
Opener Front Section Parts
23
29 30 33 32 28 3 25 26 18 21 5 10
RH LH 4
IMPORTANT NOTE Whisker should be tight against the
See important note Install enough shims until blades blades when fully assembled with even
on following page. just briefly touch, pressure on both sides. 12
a slight loss of contact during Set lowest point on wisker 1/4" from
rotation is acceptable. intended seeding depth to ensure that it 8
Refer to operator manual for detailed rides on top of ground while in
opener blade contact setting. operation. 11 19
03-2013
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
NOTE:
Part number T00504 is a hard bushing replacing kit for opener
IMPORTANT NOTE:
The disc mounting bolts supplied are:
right-hand thread (Regular)
and left-hand thread Front view of opener
BOLTS MUST BE INSTALLED ON
THEIR PROPER SIDE!!
26
24
12
23
5 8
4 11 9 10
20
14 20
Opener Rear Section Parts
21
15 , 16 Are seed 13
firmer options
9 T00503
Ordering parts Note:
16 Includes 17 and 18 with
15
rebounder seed firmer kit.
18
For ordering Keeton seed firmer 15 kit
with hardware, use KCKESFOP 16
17
03-2013
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
Coil-Tech Coulters
2
7
3
11
12
8
8
1
4
9
10
13
5
6
Coil-Tech Coulters
17
15
16
14
IMPORTANT
Recommended Install Procedure.
Note: Bearings must be properly grease packed.
1. Torque the spindle nut to 100 ft/lbs (135 Nm) to
11 10 properly seat the bearings in the races. Always rotate
the hub while tightening.
9 2. Back spindle nut off until it is just loose.
3. Re-torque to 40 (55 Nm) ft/lbs while rotating the hub.
12 4. Adjust the nut to align the nearest slot with the hole in
the spindle. Hub must be able to rotated relatively freely.
7 Also it should be tight enough so that it cannot slide
back and forth on the spindle more than .005" (0.13mm).
8
4
13 Parts 2 - 5 available
3
only as kits 13 14 15 ,
not individually. 2
14
15
03-2013
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
Coil-Tech Hub
ITEM QTY. PART NO. DESCRIPTION
1 1 C90301 COULTER SPINDLE FOR TAPERED BEARINGS
2 1 - GRASS WRAP GUARD
3 1 - SEAL, GREASE AND DIRT
4 1 - SEAL COUNTERFACE
5 2 - 30208-J2/Q BEARING CUP & CONE ASSEMBLY
6 1 - CAST COIL-TECH COULTER HUB
7 1 GF641 1/4"-28NF GREASE FITTING
8 1 BSR0415 1/4" x 1 1/2" LG ROLL-PIN PLATED
9 1 C90102 DUST CAP
10 4 B0825 1/2" x 2 1/2" HEX BOLT
11 4 BN08S 1/2"-13NC STOVER LOCK NUT
12 1 BN16FCH 1"-14NF FLANGED CASTLE NUT GR. 8
13 - C90311 CUP & CONE BEARING SET - 4 BOLT HUB (2 BEARINGS)
14 - C91118A MULTI-LIP SEAL KIT FOR COULTER HUBS
15 - C90311SB CUP & CONE BEARING AND MULTI-LIP SEAL KIT
5
14C91118A - MULTI-LIP 5
SEAL KIT FOR COULTERS
4
4
3
3
2 2
9" 5 1/2"
10 1/2" 5 1/2" 2" 3 1/2" 10" 4 1/2" 17 1/4" 9 3/4" 2 3/8" 2 5/8"
2 1/4" 3 3/8" 3 5/8" 2 1/8"
3" 13" 9 1/2" 3 1/2" 12" 9 3/4" 2" 11 1/8" 9 3/4" 9 1/2"
1 1/4" 2 1/2" 2 1/4" 3 1/2" 24 1/2"
1 3/8"
T01679
BU1061 525-40' STUB BY HINGE
U-BOLT 5/8" x 6" x 5 1/2"
4 PLACES BY HINGES
1 3/8" 2"
3 1/2" 2 1/4" 2 1/2" 1 1/2"
9 1/2" 3" 9 3/4" 11 1/8" 9 3/4" 12" 3 1/2" 9 1/2" 13" 3"
2 1/4" 3 5/8" 2 3/8" 5 1/2" 9" 2 1/4" 4 1/2" 9 3/4" 2" 5 1/2" 10 1/2"
2 5/8" 3 3/8" 9 3/4" 17 1/4" 2 1/4"
3" 13" 9 1/2" 3 1/2" 12" 9 3/4" 2" 11 1/8" 9 3/4" 9 1/2"
1 1/4" 2 1/2" 2 1/4" 3 1/2" 24 1/2"
1 3/8"
BN10L
5/8" NYLOCK NUT NC
T01679
BU1061 525-40' STUB BY HINGE
U-BOLT 5/8" x 6" x 5 1/2"
2 PLACES BY HINGES
1"
12 1/2" 4 1/2" 5 1/2" 7" 14" 12 3/4" 4"
4 1/4" 6 1/8" 5 3/8"
All mounts
are short
T01679
BU1061 525-40' STUB BY HINGE
U-BOLT 5/8" x 6" x 5 1/2"
4 PLACES BY HINGES
11" 8 1/4"
2 1/4" 8 1/4" 4 3/4" 4" 2 1/2" 14 1/4" 4 3/8"
5 3/4" 3" 6 7/8"
12 1/2" 1 1/4" 15" 7" 12 1/2" 4 1/4" 6 1/2" 1" 6 1/8" 4" 2 1/4" 5 3/8"
2 1/4" 14 3/4" 4 1/8" 25 3/4"
14 1/2" 14 3/4" 14 1/2" 2 1/4" 3/4" 6" 3 3/8"
BN10L
5/8" NYLOCK NUT NC
T01679
525-40' STUB BY HINGE
BU1061
U-BOLT 5/8" x 6" x 5 1/2"
4 PLACES BY HINGES
11"
2 3/4"
15 1/4" 13 7/8" 16" 14 1/4" 2 1/2" 4" 4 3/4" 8 1/4" 2 1/4"
3"
T01730
REAR AXLE
HOSE HOLDER
BU1060 T00673
U-BOLT 5/8" TBH AIR CART
x 6" x 7 1/2" TONGUE HOSE GUIDE
BU1046
U-BOLT 5/8" x
4" x 7 1/2" LG.
T00342
AIR SEEDER
FRAME 2 1/2"
BN10L HOSE GUIDE
5/8" NYLOCK
NUT NC Mount hose holder
between openers
Channels at these
locations mounted
directly to toolbars using
bolts and pull-up plates
525-40' 6 TOWER OPENER AIR DISTRIBUTION - TBT CARTS
Page 50 Salford Farm Machinery Ltd. 03-2013
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
BU1061
U-BOLT 5/8" 18"MAX
x 6" x 5 1/2"
T01731
525-40' AIR HOSE
HOLDER ON EXTENSION
T00664
AIR HOSE CHAIN
WITH CLIPS
T00673
TBH AIR CART
TONGUE HOSE GUIDE
BU1046
U-BOLT 5/8" x
T01490 4" x 7 1/2" LG.
SINGLE RING
HOSE HOLDER
BN10L
5/8" NYLOCK
NUT NC
BU1046
T01489 U-BOLT 5/8" x
DOUBLE RING 4" x 7 1/2" LG.
HOSE HOLDER
BN10L
5/8" NYLOCK
NUT NC
T00664
AIR HOSE CHAIN
WITH CLIPS
A1-22"(56cm)
A2-18 1/2" (47cm)
A3-26 1/2"(67cm)
T00673
TBH AIR CART
TONGUE HOSE GUIDE
T00323
A1, A2, A3
Outlets Outlets
8-7.5" 8-7.5"
6-10"
Outlets
C Outlets
B 6-10"
5-12" 5-12"
8-7.5" 8-7.5"
6-10" 6-10"
5-12" 5-12"
17"
43cm
17"
43cm
17"
43cm
A1 A1 A2
17"
43cm
D
A3
T01730
REAR AXLE
HOSE HOLDER BU1046
U-BOLT 5/8" x
BU1046 4" x 7 1/2" LG.
U-BOLT 5/8" x
4" x 7 1/2" LG.
C
Outlets Outlets
8-7.5"
6-10"
8-7.5"
6-10"
B
5-12" 5-12" Outlets Outlets
8-7.5" 8-7.5"
17" 6-10" 6-10"
43cm 5-12" 5-12"
17"
43cm
17"
43cm
17"
43cm
D A2 A1 A1
T00664
AIR HOSE CHAIN
WITH CLIPS
A3
T00673
TBH AIR CART
Mount hose cradles on TONGUE HOSE GUIDE
tow hitch for TBH air carts
A1-19"(48cm)
A2-20 1/2" (52cm)
A3-24 1/2"(62cm) A4-21"(53cm)
T00323
T00323 A4
A1, A2, A3
D
23"
58cm 23"
23"
58cm
58cm
20 1/2"
52cm
C B A3
A4 A2
Route these hoses through
triangle on top of axle beam
BU1046
BU1046 U-BOLT 5/8" x
U-BOLT 5/8" x 4" x 7 1/2" LG.
4" x 7 1/2" LG.
BN10L BN10L
5/8" NYLOCK 5/8" NYLOCK
NUT NC NUT NC
T01490
SINGLE
T01489 RING HOSE
DOUBLE HOLDER
RING HOSE
HOLDER
T01731
525-40' AIR HOSE
HOLDER ON EXTENSION B - 2 PLACES C - 4 PLACES
D - 2 PLACES
A1
D 23"
58cm 23"
20 1/2"
23" 58cm
52cm
58cm
B C
A2 A4
A3
30
39 33 26
29
25
38
27
3
28
38
2
38
40
37 1 36
34 1
35
Mount can be flipped 37
to install air tower
higher if desired
Tow Hitch
Rigid Tow Hitch Assembly
For air carts with pivoting tongues
Connect tow hitch wiring harness to 4 10 9 8
6 pin plug on main wiring harness
19
7 11 12
3
15 14 13
17
16
Monitor harness
plug (if equipped)
18
16
4
6 8 9
14
13
Monitor harness
plug (if equipped)
15
60 61
A C D
HARDWARE
ITEM QTY PART NO. DESCRIPTION
A 2 H6601 3/4" NPT 3/4" PIONEER FEMALE COUPLER
B 2 H8010-5 3/4" NPT PIONEER MALE TIP TO FIT 1/2" REMOTE
C 2 H42504P 1/2" NPT PIONEER FEMALE COUPLER
D 2 H52054 #5205-4C 1/2" PIONEER DUST PLUG
* E 1 H5253050TH 525-30'/50' HOSE KIT - RIGID TOW HITCH HYDRAULICS
** F 1 H5253050FTH 525-30'/50' HOSE KIT - FLOATING TOW HITCH HYDRAULICS
HOSES
RIGID HITCH FLOATING HITCH
LABEL QTY SIZE FROM TO
LENGTH (in) LENGTH(in)
60 2 3/4" 36' 42' TRACTOR EXTEND MANIFOLD 'BASE'
61 1 1/2" 36' 42' TRACTOR RETRACT BALL VALVE
6 5 11
17
13
6 21
20 19
22 23 8
12
8 23 22
Insert washer
between mounting
plate and
activator. Do not
overtighten bolt.
18
14
16
8 23 22
5 6
9 10
4
1
3
Install depth control
on LH main front axle.
7 8
10
19
6
18
DETAIL B
17
6
16
12
DETAIL D
6 15 5 3 13
6
15
5
4 14
6 2 12
5
6
12
DETAIL C
DETAIL A
16
2 K Q
In cylinder 11
barrel end port H In cylinder
G H 1 5 barrel end port
Sb 10
Rear counterbalance valve detail R 3/8" hose from 1/2" hose from
axle return tee HSR4512BBJ rod end
H
3 Front counterbalance valve detail
5 5
T M 9 7
7 U 8a L 8a
V P
P
9
8b N 4 N
11 11 8b
H H
D H H D
A
A
03-2013
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
HOSES
LENGTH
LABEL QTY SIZE FROM TO
(in)
1 1 1/2" 25' TRACTOR REAR FEED TEE
2 1 1/2" 30'8" TRACTOR STROKE CONTROL VALVE
3 1 1/2" 9'6" STROKE CONTROL VALVE RETURN CROSS/TEE
4 2 1/2" 9'6" REAR FEED TEE HSR4512 BARRELS
5 2 1/2" 14'7" HSR4512 RODS HSR4012 BARRELS
6a 2 1/2" 10'5" HSR4012 RODS UNION
6b 2 1/2" 11'1" UNION HSR3512 BARRELS
7 2 1/2" 13'2" HSR3512 RODS HSR3212 BARRELS
8a 2 1/2" 19'2" HSR3212 RODS UNION
8b 2 1/2" 9'9" UNION RETURN CROSS/TEE
9 2 3/8" 4'4" RETURN CROSS/TEE COUNTERBALANCE TEE
10 2 3/8" 8'8" COUNTERBALANCE TEE FRONT COUNTERBALANCES
11 2 3/8" 4'11" COUNTERBALANCE TEE REAR COUNTERBALANCES
Connect only the Barrel end of the cylinders until the circuit has been charged.
1. Be sure that all cylinders can extend completely without striking anything. Prop with blocks
if necessary.
2. Connect Tractor.
3. Extend cylinders and hold lever for 2-3 minutes. This will purge the air from the circuit.
(The lift cylinders have a port that allows oil to pass when completely extended.)
4. The circuit is now free from air. Install rod end pins.
Whenever air could have entered the cylinders, repeat above steps to purge circuit.
D
A
46
45
42
41
F
E
43
44
43
40
C
B
45
46
HOSES
LENGTH
LABEL QTY SIZE FROM TO
(in)
40 1 1/2" 24'5" TRACTOR EXTEND MANIFOLD 'BASE'
41 1 1/2" 13' TRACTOR RETRACT BALL VALVE
42 1 1/2" 11' BALL VALVE MANIFOLD 'ROD'
43 2 3/8" 3'2" MANIFOLD 'FLB' & 'FRB' FRONT BARREL
44 2 3/8" 6'8" MANIFOLD 'RLB' & 'RRB' REAR BARREL
45 2 3/8" 6'8" MANIFOLD 'FLR' & 'FRR' FRONT ROD
46 2 3/8" 8'2" MANIFOLD 'RLR' & 'RRR' REAR ROD
IMPORTANT: Do not connect the cylinder rods until system has been charged with oil.
1. Prop up the cylinder with a block of wood so the rod can extend without striking anything.
2. Hitch to tractor and connect hoses. (note: check to see that all the cylinders move in the
same direction. If not, then switch the rod and barrel hoses of the cylinder(s) moving
backward.)
3. Extend cylinders completely. Hold lever for 30 seconds as air exits the cylinder.
4. Retract cylinders completely. Hold lever for 30 seconds.
5. Repeat three times.
6. Install cylinder pins. Be sure washers are installed correctly (see cylinder page).
7. When folding for the first time, or when new hardware is installed,
CAUTION check that cylinders and fittings do not collide with the wing frame when
fully folded. If so, use an alternate plug in the cylinder, or simply rotate
cylinder 180 degrees.
Air in the wing cylinders will cause wings to fall to the ground!!!
DANGER Whenever air could have entered the cylinders, repeat the process
above to purge circuit.
Never work on a lift system with the wings folded!!! ALWAYS UNFOLD WINGS before
working on hydraulics!!
11
7
13
7
14
4
9
8 3
DETAIL C DETAIL B
7 pin plug
to tractor
2
15
Route wires
along hoses and
11 tie strap in place
03-2013
DETAIL A
525 - 40ft Assembly and Parts Manual 2013 Return to Contents
Markers
Optional Marker Installation
2 3 5
5 4
Position marker
mounts between
5 7 4 coulters or openers
5 3
14
11
Position sequence
valve between coulters
or openers on front bar
13 12
10 5
Sequence valve as
shown from front
HOSES
LABEL QTY LENGTH FROM TO
M1 2 21' TRACTOR SEQUENCE VALVE
M2 4 25' SEQUENCE VALVE MARKER
9
R R
C C
M1
'R' to marker cylinder Rod end
'C' to marker cylinder Base end
M2 M2
Decals
Decal Installation Layout
1
18
1
1
17
19
10
10
1
11
8
9
1
9
2
11
Place opener downpressure setting decal on endmost
8
openers of main frame and secondary wings.
14
1
10
10
1
1
13
3
3
6
These 2 4
decals on LH
caster only 5
12
16
3 3 10
16
10
3
15
12 3
3 3
GD100 1 GD102 2
GD10840 3
GD110 4
GD112 5
GD144 6 GD109 7
Decal Legend
GDSW2 9
GD525 8
GDSW200 10
GDT3 11
GD108 12 GD190L 13
GD190R 14
GD193 15 GD194 16
GDSW700 17 GDSW4 18
GD210 19