Bridge Estimate: Bridge No's. 044/103 & 044/104 Lebanon / Hartford - Contract 16148

This document provides a cost estimate for replacing two bridges along Interstate 89 over the Connecticut River between Lebanon and Hartford, New Hampshire. The total estimated cost for construction is $28,750,000. Major costs include removal of the existing bridge structures, installation of new structural steel, reinforced concrete, and precast concrete elements, as well as construction of temporary cofferdams and access for equipment. Construction is estimated to take approximately two years to complete.

Uploaded by

Sweet Fairy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

Bridge Estimate: Bridge No's. 044/103 & 044/104 Lebanon / Hartford - Contract 16148

This document provides a cost estimate for replacing two bridges along Interstate 89 over the Connecticut River between Lebanon and Hartford, New Hampshire. The total estimated cost for construction is $28,750,000. Major costs include removal of the existing bridge structures, installation of new structural steel, reinforced concrete, and precast concrete elements, as well as construction of temporary cofferdams and access for equipment. Construction is estimated to take approximately two years to complete.

Uploaded by

Sweet Fairy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Bridge Estimate

Lebanon / Hartford - Contract 16148


Bridge No's. 044/103 & 044/104
Interstate 89 N.B. & S.B. over the Connecticut River

CONSTRUCTION COST ESTIMATE


OCTOBER 2017
TOTAL
ITEM NO. ITEM DESCRIPTION UNIT TYPE UNIT PRICE TOTAL COST
QUANTITY
203.1 COMMON EXCAVATION CY S 135 $15.00 $2,025.00
207.3 UNCLASSIFIED CHANNEL EXCAVATION CY S 14,800 $25.00 $370,000.00
209.201 GRANULAR BACKFILL (BRIDGE) (F) CY S 1,100 $40.00 $44,000.00
209.4 GRANULAR BACKFILL (GRAV) CY S 2,020 $35.00 $70,700.00
403.911 HOT BITUMINOUS BRIDGE PAVEMENT, 1" BASE COURSE TON S 560 $190.00 $106,400.00
500.02 ACCESS FOR BRIDGE CONSTRUCTION U SP 1 $1,850,000.00 $1,850,000.00
502 REMOVAL OF EXISTING BRIDGE STRUCTURE U S 1 $1,870,000.00 $1,870,000.00
503.201 COFFERDAMS U S 1 $130,000.00 $130,000.00
503.202 COFFERDAMS U S 1 $80,000.00 $80,000.00
503.203 COFFERDAMS U S 1 $155,000.00 $155,000.00
503.301 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U S 1 $235,000.00 $235,000.00
503.302 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U S 1 $240,000.00 $240,000.00
503.303 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U S 1 $285,000.00 $285,000.00
503.304 COFFERDAMS WITH SHEETING LEFT-IN-PLACE U S 1 $360,000.00 $360,000.00
504.1 COMMON BRIDGE EXCAVATION (F) CY S 1,200 $21.00 $25,200.00
504.25 ROCK BRIDGE EXCAVATION MECHANICAL METHODS CY SP 50 $150.00 $7,500.00
508 STRUCTURAL FILL CY S 80 $60.00 $4,800.00
510.1 PILE DRIVING EQUIPMENT U S 1 $240,000.00 $240,000.00
510.61 FURNISHING & DRIVING STEEL BEARING PILES LB S 892,000 $0.90 $802,800.00
510.65 DRIVING-POINTS FOR STEEL BEARING PILES EA S 140 $225.00 $31,500.00
510.9 PILE SPLICES EA S 159 $200.00 $31,800.00
511.00 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY S 2,630 $17.00 $44,710.00
512.02 PREPARATION FOR CONCRETE REPAIRS, CLASS II SY S 320 $650.00 $208,000.00
520.02 CONCRETE CLASS AA, ABOVE FOOTINGS (F) CY S 1,720 $1,200.00 $2,064,000.00
520.0201 CONCRETE CLASS AA, ABOVE FOOTINGS CY SP 8 $1,300.00 $10,400.00
520.0302 CONCRETE CLASS AA APPROACH SLABS (QC/QA) (F) CY S 200 $400.00 $80,000.00
520.12 CONCRETE CLASS A, ABOVE FOOTINGS (F) CY S 260 $675.00 $175,500.00
520.21 CONCRETE CLASS B, FOOTINGS (F) CY S 900 $360.00 $324,000.00
520.6 CONCRETE CLASS T, FOUNDATION SEAL CY S 1,050 $250.00 $262,500.00
520.7002 CONCRETE BRIDGE DECK (QC/QA) (F) CY S 2,100 $950.00 $1,995,000.00
HIGH MOLECULAR WEIGHT METHACRYLATE CRACK SEAL
526.3 GAL SP 140 $450.00 $63,000.00
FOR CONCRETE BRIDGE DECKS
528.51 PRESTRESSED CONCRETE DECK PANELS (F) SF S 68,100 $19.00 $1,293,900.00
534.3 WATER REPELLENT (SILANE/SILOXANE) GAL S 170 $75.00 $12,750.00
BARRIER MEMBRANE, PEEL AND STICK - VERTICAL
538.2 SY S 140 $45.00 $6,300.00
SURFACES (F)
538.6 BARRIER MEMBRANE, HEAT WELDED - MACHINE METHOD (F) SY S 12,350 $21.00 $259,350.00
540.31 CONCRETE ARMOR MATRIX COMPONENT EA SP 16,500 $55.00 $907,500.00
541.1 PVC WATERSTOPS, NH TYPE 1 (F) LF S 220 $10.00 $2,200.00
541.2 PVC WATERSTOPS, NH TYPE 2 (F) LF S 90 $10.00 $900.00
544 REINFORCING STEEL (F) LB S 263,000 $1.10 $289,300.00
544.01 REINFORCING STEEL LB SP 800 $1.25 $1,000.00
544.11 REINFORCING STEEL- MECHANICAL CONNECTORS (F) LB S 20,300 $6.00 $121,800.00
544.2 REINFORCING STEEL, EPOXY COATED (F) LB S 570,000 $1.30 $741,000.00
544.7 SYNTHETIC FIBER REINFORCEMENT (F) LB S 1,400 $8.00 $11,200.00
547 SHEAR CONNECTORS (F) EA S 35,500 $5.00 $177,500.00
550.1 STRUCTURAL STEEL (F) LB S 3,308,000 $1.65 $5,458,200.00
550.210 BRIDGE SHOES - DISC (F) EA SP 84 $5,000.00 $420,000.00
561.3001 PREFABRICATED FINGER EXPANSION JOINT (F) LF S 224 $1,400.00 $313,600.00
562.1 SILICONE JOINT SEALANT (F) LF S 180 $15.00 $2,700.00
563.23 BRIDGE RAIL T3 LF S 1,770 $165.00 $292,050.00
PROTECTIVE SCREENING FOR OVERPASS STRUCTURES T2
563.921 LF SP 205 $40.00 $8,200.00
OR T4 RAIL
565.232 BRIDGE APPROACH RAIL T3 (STEEL POSTS) U S 4 $4,750.00 $19,000.00
585.21 STONE FILL, CLASS B (BRIDGE) CY S 7,000 $37.50 $262,500.00
585.3 STONE FILL, CLASS C CY S 150 $50.00 $7,500.00
593.411 GEOTEXTILE; PERM CONTROL CL.1, NON-WOVEN SY S 3,230 $3.00 $9,690.00
606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF SP 840 $125.00 $105,000.00
PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL -
606.4174 LF SP 1,690 $100.00 $169,000.00
BRACED
692 MOBILIZATION U S 0.80 $2,352,500.00 $1,882,000.00
REPAIRS OR REPLACEMENTS AS NEEDED - BRIDGE
1002.1 $ SP 1 $100,000.00 $100,000.00
STRUCTURES
1010.15 FUEL ADJUSTMENT $ SP 0.80 $250,000.00 $200,000.00
1010.2 ASPHALT CEMENT ADJUSTMENT $ SP 0.80 $50,000.00 $40,000.00
QUALITY CONTROL QUALITY ASSURANCE (QC/QA) FOR
1010.41 $ SP 1 $103,800.00 $103,800.00
CONCRETE

SUBTOTAL = $25,386,775
Note: 1) Superstructure Item Payment Breakdown is 76% NHDOT, 24% Vtrans Contingency (5% ) = $1,269,339
2) Substructure Item Payment Breakdown is per Substructure Unit. Abut A, BRIDGE TOTAL = $26,656,114
Piers 1, 2, 3, 4 are Owned by NHDOT. Pier 5 & Abut. B Owned by Vtrans SAY = $ 26,700,000
3) Project Wide Item Payment Breakdown is 76% NHDOT, 24% Vtrans
4) Unit Costs Based on Year 2016 Costs

Page 1 of 1 Estimate Summary


Highway Estimate
Lebanon / Hartford - Contract 16148
Bridge No's: 044/103 & 044/104
Interstate 89 N.B. & S.B. over the Connecticut River

CONSTRUCTION COST ESTIMATE


OCTOBER 2017

TOTAL TOTAL
ITEM NO. DESCRIPTION UNIT UNIT PRICE QUANTITY COST

201.1 CLEARING AND GRUBBING (F) A $6,000 1 $3,000


202.31 FILL ABANDONED PIPE CY $200 48 $9,600
202.41 REMOVAL OF EXISTING PIPE 0-24" DIAMETER LF $15 1,500 $22,500
202.5 REMOVAL OF CATCH BASINS, DROP INLETS, AND MANHOLES EA $300 24 $7,200
202.7 REMOVAL OF GUARDRAIL LF $2 8,400 $16,800
203.1 COMMON EXCAVATION CY $10 13,100 $131,000
203.2 ROCK EXCAVATION CY $50 105 $5,250
203.55543 GUARDRAIL EAGRT OFFSET PLATFORM, TL 3 U $7,000 4 $28,000
203.6 EMBANKMENT IN PLACE (F) CY $10 7,400 $74,000
214. FINE GRADING U $100,000 1 $100,000
304.1 SAND (F) CY $20 3,500 $70,000
304.4 CRUSHED STONE (FINE GRADATION)(F) CY $25 4,700 $117,500
304.5 CRUSHED STONE (COARSE GRADATION)(F) CY $25 2,900 $72,500
403.X HOT BITUMINOUS PAVEMENT, MACHINE METHOD T $75 19,300 $1,447,500
403.99 TEMPORARY BITUMINOUS PAVEMENT T $80 2,860 $228,800
417 COLD PLANING BITUMINOUS SURFACES SY $4 15,200 $60,800
603.00212 12" R.C. PIPE, 2000D LF $60 54 $3,240
603.00215 15" R.C. PIPE, 2000D LF $65 4,700 $305,500
603.00218 18" R.C. PIPE, 2000D LF $70 960 $67,200
603.00224 24" R.C. PIPE, 2000D LF $95 1,700 $161,500
603.30115 15" R.C. END SECTIONS EA $700 4 $2,800
603.30118 18" R.C. END SECTIONS EA $800 3 $2,400
603.30124 24" R.C. END SECTIONS EA $1,000 4 $4,000
603.80215 15" PLASTIC PIPE (SMOOTH INTERIOR) LF $45 30 $1,350
603.80218 18" PLASTIC PIPE (SMOOTH INTERIOR) LF $50 70 $3,500
604.0007 POLYETHYLENE LINER EA $200 52 $10,400
604.12 CATCH BASINS, TYPE B U $3,000 40 $120,000
604.125 CATCH BASINS, TYPE B 5 FT DIAMETER U $3,250 1 $3,250
604.15 CATCH BASINS, TYPE E U $3,000 35 $105,000
604.155 CATCH BASINS, TYPE E 5 FT DIAMETER U $3,250 1 $3,250
604.324 DRAINAGE MANHOLE, 4 FT DIAMETER U $2,500 10 $25,000
604.4 RECONSTRUCTING / ADJUSTING CATCH BASIN LF $450 7 $3,150
604.9101 OUTLET CONTROL STRUCTURE U $4,000 2 $8,000
606.1254 BEAM GUARDRAIL (TERMINAL UNIT TYPE EAGRT, TL 3) STEEL U $2,000 4 $8,000
606.127 BEAM GUARDRAIL (TERMINAL UNIT TYPE G-2) STEEL LF $600 5 $3,000
606.18001 *31" W-BEAM GUARDRAIL WITH 8" OFFSET BLOCKS (STEEL POST) LF $16 6,300 $100,800
606.28001 *31" DOUBLE FACED W-BEAM GUARDRAIL WITH 8" OFFSET BLOCKS LF $22 1,200 $26,400
606.413 SINGLE SLOPE CONCRETE MEDIAN BARRIER, PRECAST LF $80 2,400 $192,000
606.417 PORTABLE CONCRETE BARRIER FOR TRAFFIC CONTROL LF $25 7,200 $180,000
609.01 STRAIGHT GRANITE CURB LF $35 415 $14,525
609.216 STRAIGHT GRANITE SLOPE CURB 6" HIGH LF $20 2,500 $50,000
609.811 BITUMINOUS CURB, TYPE B (4" REVEAL) LF $8 5,000 $40,000
615.10001 FULL TRAFFIC SIGN STRUCTURE U $100,000 2 $200,000
615.20001 CANTILEVER TRAFFIC SIGN STRUCTURE U $70,000 1 $70,000

MAJOR HIGHWAY ITEM SUB-TOTAL COST $4,108,715

Costs Estimated by Percentages of Major Highway Items**: Contract % Estimate

TRAFFIC ITEMS (PAVEMENT MARKINGS & SIGNS) 5.00% $205,436


OTHER ITEMS AND CONTINGENCIES 20.00% $821,743

ROADWAY ITEMS SUB-TOTAL COST $5,135,894


Estimate Summary
Lebanon / Hartford - Contract 16148
Bridge No's: 044/103 & 044/104
Interstate 89 N.B. & S.B. over the Connecticut River

CONSTRUCTION COST ESTIMATE


OCTOBER 2017

ROADWAY ITEMS SUB-TOTAL COST $5,135,894

TOTAL BRIDGE COST (INCLUDING MOBILIZATION) $26,700,000

ROADWAY AND BRIDGE ITEMS SUB-TOTAL COST $31,835,894

Costs Estimated by Percentages of Highway and Bridge Items**: Contract % Estimate

TRAFFIC CONTROL & SMART WORK ZONE ITEMS 2.00% $636,718


EROSION CONTROL ITEMS 2.00% $636,718

CONTRACT BID ITEMS


698.11 FIELD OFFICE TYPE A MON $2,500 48 $120,000
698.2 PHYSICAL TESTING LABORATORY MON $900 36 $32,400
1010.15 FUEL ADJUSTMENT $ $250,000 1 $250,000
1010.2 ASPHALT CEMENT ADJUSTMENT $ $50,000 1 $50,000
1010.3 QUALITY CONTROL QUALITY ASSURANCE (QC/QA) ASPHALT $ $60,000 1 $60,000

CONSTRUCTION ITEMS SUB-TOTAL COST $33,621,730

CONSTRUCTION ENGINEERING
** Percentages Estimated from other similar NHDOT projects

ROADWAY CE (PERCENTAGE OF ROADWAY ITEMS SUB-TOTAL COST) 6.00% $308,154


BRIDGE CE (PERCENTAGE OF TOTAL BRIDGE COST 6.00% $1,602,000

OVERALL TOTAL PROJECT COST $35,531,883


Use $35,600,000