This quick installation guide provides instructions for installing a CM (master module) and up to 6 CS (slave modules) as part of an energy storage system. The tools and parts required are listed. Installation steps include mounting the CS modules securely on the ground, stacking batteries evenly, mounting brackets on the batteries, and connecting cables correctly. Proper grounding and cable connections are shown in diagrams. System startup instructions are provided to operate the CM in normal or backup mode.

Uploaded by

Will
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

ECS Installation Guide

This quick installation guide provides instructions for installing a CM (master module) and up to 6 CS (slave modules) as part of an energy storage system. The tools and parts required are listed. Installation steps include mounting the CS modules securely on the ground, stacking batteries evenly, mounting brackets on the batteries, and connecting cables correctly. Proper grounding and cable connections are shown in diagrams. System startup instructions are provided to operate the CM in normal or backup mode.

Uploaded by

Will
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Quick Installa�on Guide

Note: Please make sure each system including 1 CM and 1 CS.CS less than 6(1~6) pieces:
1. Tools Required For CM : CM

The following tools will be required to install CM(Master module) and CS(Slave module) . B-Start Switch
Left POWER Switch

Handle

BMS Status LED CS


≤6 Layers

Screw Driver Crimping Modular Safety Shoes Mul�meter Bracket Moun�ng Hole SOC LED
Ba�ery Fixing Hole Opera�ng Status LED
DC Switch
CAN
DC OUT-
Right DC OUT+
Safety Gloves Safety Goggles Plier Ribbon
Handle
For CM 4000 (US only):
Bracket Moun�ng Hole Note: Please make sure each system including 1 CM and 1 CS.CS less than 4(1~4) pieces:
Earth Terminal

Electric Drill Track Level Bar Tape Marker


CM

B: Connect the grounding cable. The figure is shown in below.


2. Packing List 4. Installa�on Steps

For CS : Step 1 Step 2


CS
≤4 Layers
DC OUT-

Install a CS with four footstand (Item C ) Place the ba�ery 20mm against the wall.
BMS COM DC OUT+

Manual
and place it on the ground and adjust it Note: Please make sure the Opera�ng St-
No. Items
to the level. A�er installing the footstand, atus LED is on your le� handside when
A Moun�ng screw pack use a track level bar to confirm the level. you facing the ba�ery model.
B Installa�on guide & User manual Insert the waterproof cover (Item J) into Please refer to the video for the installa�on of the junc�on box and the cable gland.
A B
the bo�om of the ba�ery and lock it in
place with the clip.
For CM :

20mm
20mm
300mm
No�ce: 300mm
A B C D must be installed
LED

E F G

Manual Step 3 Step 4


Stack the ba�eries one by one. Place the two fixing brackets (Item B) For CM 4000 (US only):
H I J close to the wall and install them on 6. System Start Up
both sides of the ba�ery.
CM opera�on:
1. Normal mode: When there is PV and grid access, turn on DC switch first, then
Insert

press “POWER” bu�on.


Snaps face up 2. Black start: When there is no PV and grid access, turn on DC switch first, then
K
press “POWER” bu�on, then press and hold “B-Start ” bu�on and release it a�er 10s.
For CM4000(US only):
Startup steps:
Turn on DC switch and press the POWER switch, firstly Master LED will light up once,
One snap on the left and right and then the BMS Status LED will light up for 0.5s,Opera�ng Status LED will light up for
1s at the same �me,it means that the system works normally.
Step 5 Step 6 5. Wiring Steps
L M Mark the wall through the bracket hole. Punch a�er removing the CM. Drill holes
with electric drill, make sure the holes
are at least 50mm deep, and then �ghten A: Connect the inverter and make sure the wiring posi�on is correct, as shown in the
No. Items No. Items figure below.
the expansion tubes (Item I).
A Moun�ng screw pack H Installa�on guide & User manual Note: Inverter wiring refer to the inverter user manual.
B Fixing bracket I Expansion tube*2 & Expansion screw*2 For outdoor use,please use item K and proceed as follows
C Footstand J Waterproof cover Connec�on steps:
Step 1: Prepare a standard network cable and cable connector, then insert the network
D Communica�on cable (BMS-inverter) K RJ45 cable through the cable connector.
E Grounding cable L Junc�on box
F DC posi�ve output cable M PLUG *2
Step 7 Step 8 Please scan the QR Code and follow the steps below to download our
G DC nega�ve output cable
A�er stacking CM again, fix the ba�ery Fix the moun�ng screw packs on both Step 2: Crimp the cable with a Rj45 plug which is inside of the cable connector. latest mul�-language User Manual/Quick Installa�on Guide:
on the wall. sides of the ba�ery, the installa�on is Scan the QR Code → Select your Language → Choose to download
over. User Manual or Quick Installa�on Guide → Download
3. Terminals

For CS :
Handle

If the usage is indoor, please use item D


Ba�ery Fixing Hole Step 3: Insert the cable connector into BMS port at the bo�om of inverter and screw
it �ghtly. V1.0
Opera�ng Status LED 10-203-00296-00