ECS Installation Guide
ECS Installation Guide
Note: Please make sure each system including 1 CM and 1 CS.CS less than 6(1~6) pieces:
1. Tools Required For CM : CM
The following tools will be required to install CM(Master module) and CS(Slave module) . B-Start Switch
Left POWER Switch
Handle
Screw Driver Crimping Modular Safety Shoes Mul�meter Bracket Moun�ng Hole SOC LED
Ba�ery Fixing Hole Opera�ng Status LED
DC Switch
CAN
DC OUT-
Right DC OUT+
Safety Gloves Safety Goggles Plier Ribbon
Handle
For CM 4000 (US only):
Bracket Moun�ng Hole Note: Please make sure each system including 1 CM and 1 CS.CS less than 4(1~4) pieces:
Earth Terminal
Install a CS with four footstand (Item C ) Place the ba�ery 20mm against the wall.
BMS COM DC OUT+
Manual
and place it on the ground and adjust it Note: Please make sure the Opera�ng St-
No. Items
to the level. A�er installing the footstand, atus LED is on your le� handside when
A Moun�ng screw pack use a track level bar to confirm the level. you facing the ba�ery model.
B Installa�on guide & User manual Insert the waterproof cover (Item J) into Please refer to the video for the installa�on of the junc�on box and the cable gland.
A B
the bo�om of the ba�ery and lock it in
place with the clip.
For CM :
20mm
20mm
300mm
No�ce: 300mm
A B C D must be installed
LED
E F G
For CS :
Handle