Hvac Notes
Hvac Notes
1. COORDINATE ALL WORK WITH THE ARCHITECTURAL DRAWINGS. VERIFY LOCATION OF ALL VISIBLE DEVICES WITH ARCHITECT OR 33. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND ROOFTOP UNIT SHALL BE PIPED TO
OWNER FOR FINISH COLOR AND MOUNTING FRAME PRIOR TO PURCHASE. RECEIVE APPROVAL FROM THE ARCHITECT FOR ALL NEAREST DRAIN. SEE DETAILS SHOWN ON THE DRAWINGS OR THE CONTRACT SPECIFICATIONS FOR DEPTH OF AIR CONDITIONING
DEVICES PRIOR TO PURCHASE. CONDENSATE TRAP.
2. SEE SCHEDULE FOR NEW AC UNIT ACCESSORIES. 34. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
3. VERIFY THE SIZES OF ALL EXISTING DUCTWORK TO BE REUSED PRIOR TO SUBMISSION OF SHOP DRAWINGS. NOTIFY THE 35. CONTRACTOR SHALL SUBMIT "AS BUILT DRAWINGS" AT THE CONCLUSION OF THE JOB.
ENGINEER IMMEDIATELY IF ACTUAL SIZES INDICATED ON THESE PLANS.
36. CONTRACTOR SHALL GUARANTEE ALL NEW EQUIPMENT AND WORK FOR THE PERIOD ONE (1) YEAR.
4. LOCATE ALL UNITS TO ALLOW CLEAR AND EASY ACCESS. POSITION SO THAT AC UNITS ARE NOT LOCATED ABOVE LIGHTING
FIXTURES OR CEILING BLACK IRON. SIZES GIVEN FOR ACOUSTICALLY LINED DUCTWORK ARE CLEAR INSIDE DIMENSIONS IN INCHES. 829 EAST 15 STREET
BROOKLYN NY 11230
5.
6.
ALL SHEETMETAL SIZES INDICATED ARE CLEAR INSIDE DIMENSION.
ALL REQUIRED SHUTDOWNS AFFECTING THE BUILDING SYSTEMS MUST BE SCHEDULED WITH BUILDING MANAGEMENT AT
NOTES: T: 718-865-9350
E: [email protected]
LEAST 1 WEEK IN ADVANCED OF ANY SCHEDULE WORK. 1. CONTROLLED INSPECTION MECHANICAL SYSTEMS, CODE SECTION: BC 1704.15, HEATING SYSTEMS: BC 1704.23
N
2. TEST OF MECHANICAL AND REFRIGERATION SYSTEMS: MC 1108
7. ALL CHOPPING, HAMMER DRILLING, CORE BORING, CHIPPING OR SCARIFYING OF CONCRETE SHALL BE DONE AFTER 6:00 PM
8.
DURING WEEKDAYS AND OR/ WEEKENDS.
AIR & WATER BALANCING SHALL BE WITNESSED BY THE BUILDING CHIEF ENGINEER.
NYC 2020 ENERGY CONSERVATION CODE
C403.2.9 DUCT AND PLENUM INSULATION:
9. PROVIDE DRIP PAN UNDER NEW AND RELOCATED AC UNIT. ALL SUPPLY AND RETURN AIR DUCTS AND PLENUMS SHALL BE INSULATED WITH A MINIMUM OF R-6 INSULATION WHEN LOCATED IN
UNCONDITIONED SPACED AND WITH A MINIMUM OF R-8 INSULATION WHEN LOCATED OUTSIDE THE BUILDING. WHEN LOCATED
WITHIN A BUILDING ENVELOPE ASSEMBLY, THE DUCT OR PLENUM SHALL BE SEPARATED FROM THE BUILDING EXTERIOR OR
10. INSTALL LEAK DETECTOR IN DRIP PAN OF NEW AND RELOCATED A/C NIT WIRED TO SHUT DOWN UNIT IF WATER IS DETECTED.
UNCONDITIONED OR EXEMPT SPACES BY A MINIMUM OF R-8 INSULATION.
HVAC GENERAL NOTES DUCTS, AIR HANDLERS AND FILTER BOXES SHALL BE SEALED. JOINTS AND SEAMS SHALL COMPLY WITH SECTION 603.9 OF THE NEW
YORK CITY MECHANICAL CODE.
TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE DRAWINGS,
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR AND TESTS REQUIRED AS SPECIFIED AND REQUIRED BY C403.2.1 D PIPING INSULATION: ISSUE
CODE. PIPING SERVING AS PART OF A HEATING OR COOLING SYSTEM SHALL BE THERMALLY INSULATED IN ACCORDANCE WITH TABLE FILING SET
C403.2.10
2. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND FOR SPLIT SYSTEM HEAT PUMPS:
FLUID OPERA TING TEMPERATURE 105-140F'F. (MEAN TEMP.= 100° F)
REVISIONS
GENERAL ARRANGEMENTS ONLY. DEVIATIONS FROM THE LAYOUT MUST BE APPROVED BY THE ARCHITECTS AND ENGINEERS.
REQUIRED INSULATION CONDUCTIVITY = 0.21-0.28 BTU*IN /(h*ft2*F)
3. ALL EQUIPMENT, DUCTS, PIPING, AND OTHER DEVICES AND MATERIALS INSTALLED OUTSIDE WEATHERPROOFED. # DATE DESCRIPTION
WHERE PIPING IS INSTALLED IN OR UNDER A SLAB, VERIFICATION TO OCCUR DURING FOUNDATION INSTALLATION. PIPING
4. COORDINATE ALL WORK WITH THE ARCHITECTURAL DRAWINGS. VERIFY LOCATIONS OF ALL VISIBLE DEVICES WITH ARCHITECT INSULATION EXPOSED TO OUTDOOR WEATHER TO BE PROTECTED WITH ALUMINUM WEATHER JACKET OR PLASTIC CONDUIT 0 09/02/22 INITIAL
PRIOR TO INSTALLATION, INCLUDING THERMOSTATS, DIFFUSERS, GRILLES, REGISTERS, ETC. APPEARANCES OF ALL VISIBLE SLEEVES. 1 09/13/22 REVISION
DEVICES SHALL MATCH APPEARANCE OF EXISTING DEVICES FOR FINISH, COLOR, AND MOUNTING FRAME. RECEIVE APPROVAL
FROM THE ARCHITECT FOR ALL DEVICES PRIOR TO PURCHASE. C404.3 HEAT TRAPS: 2 11/14/22 REVISION
WATER HEATING EQUIPMENT NOT SUPPLIED WITH INTEGRAL HEAT TRAPS AND SERVING NONCIRCULATING SYSTEMS SHALL BE
5. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, PROVIDE WITH HEAT TRAPS ON THE SUPPLY AND DISCHARGE PIPING ASSOCIATED WITH THE EQUIPMENT. 3 11/17/22 REVISION
CONTRACT DOCUMENTS AND APPLICABLE CODES AND REGULATIONS.
4 11/21/22 REVISION
6. THE GENERAL CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTAL STEEL REQUIRED TO ADEQUATELY SUPPORT ALL SUSPENDED
EQUIPMENT. THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL VIBRATION ISOLATORS. ENERGY COMPLIANCE STATEMENT
TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THESE PLANS AND
7. THE GENERAL CONTRACTOR SHALL PROVIDE DUNNAGE FOR ALL ROOF MOUNTED AIR CONDITIONING UNITS OR AIR HANDLING SPECIFICATIONS ARE IN COMPLIANCE WITH 2020 NYC ENERGY CONSERVATION CODE.
UNITS. THE MECHANICAL CONTRACTOR SHALL PROVIDE ANY EXTRA SUPPLEMENTAL STEEL TO SPAN THE DUNNAGE IN ORDER
TO ACCOMMODATE THE UNITS DIMENSIONS. THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL VIBRATION ISOLATORS.
8. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF VIBRATION TO BUILDING
STRUCTURE. SUPPLY/RETURN AIR PIPE INSULATION
& PLENUM INSULATION MINIMUM THICKNESS
9. PROVIDE VIBRATION ISOLATION FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN 50 FEET OF ISOLATED EQUIPMENT
(EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS) THROUGHOUT THE MECHANICAL EQUIPMENT ROOMS. INSULATION LOCATION NOMINAL
MINIMUM
FLUID PIPE
10. THE LOCATION OF UNDERGROUND UTILITIES IS SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE UNCONDITIONED INSULATION
THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THE CONTRACTOR SHALL PAY FOR AND REPAIR MINIMUM R-6 DIAMETER
SPACE
ALL DAMAGES CAUSED BY FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES UNLESS < 1.5" 1"
OTHERWISE INDICATED.
MINIMUM R-8 OUTSIDE OF BUILDING REFREGERANT
> 1.5" 1-1/2"
11. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC.
SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
12. MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, ETC. VENTILATION IN APARTMENTS WILL BE PROVIDED
THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS. BY NATURAL MEANS THROUGH WINDOWS.
13. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.
14. LOCATE ALL TEMPERATURE, PRESSURE , AND FLOW MEASURING DEVICES IN ACCESSIBLE RECOMMENDED BY THE
MANUFACTURER FOR GOOD ACCURACY. MECHANICAL VENTILATION
15. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR REQUIREMENT
THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TESTING, ADJUSTING, AND BALANCING SHALL BE PERFORMED IN
ACCORDANCE WITH THE AABC STANDARDS. REQUIRED OUTDOOR VENTILATION AIR SCHEDULE FOR SECTION
16. BALANCING REPORTS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL. SUPPLY AIR TEMPERATURES SHALL BE INDICATED. MC403 OF THE NEW YORK CITY MECHANICAL CODE 2008 TABLE
REPORTS WILL BE REVIEWED BY THE COMMISSIONING AGENT. 403.3
OCCUPANCY CLASSIFICATION PRIVATE OUTDOOR AIR
17. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER DWELLING, SINGLE AND MULTIPLE CFM PERSON
SHALL BE USED.
100 CFM INTERMITTENT
KITCHEN
18. REINFORCEMENT, DETAILING, AND PLACEMENT OF CONCRETE SHALL CONFORM TO ASTM 315 AND ACI 318. CONCRETE SHALL
CONFORM TO ASTM C94. CONCRETE WORK SHALL CONFORM TO ACI 318, PART ENTITLED "CONSTRUCTION REQUIREMENTS".
LIVING AREA
OR 25 CFM CONTINUOUS
0.35 AIR CHANGES PER HOUR
PLOT PLAN
COMPRESSIVE STRENGTH IN 28 DAYS SHALL BE 3,000 PSI. TOTAL AIR CONTENT OF EXTERIOR CONCRETE SHALL BE BETWEEN 5 OR 15 CFM PER PERSON. SCALE: 1/8" = 1'-0"
AND 7 PERCENT BY VOLUME. SLUMP SHALL BE 3 AND 4 INCHES. CONCRETE SHALL BE CURED FOR 7 DAYS AFTER PLACEMENT.
PROJECT ADDRESS
MECHANICAL EXHAUST CAPACITY OF
19. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL TOILET ROOMS AND BATHROOMS 50 CFM INTERMITTENT OR 20 CFM 645 PUTNAM AVENUE
DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY
AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.
CONTINUOUS
BROOKLYN, NY 11221
VENTILATION IN APARTMENTS WILL BE BY NATURAL MEANS THROUGH WINDOWS.
20. ALL CONTROL WIRING SHALL BE IN CONDUIT AND SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE AND DIVISION 26 BUILDING DATA
SPECIFICATIONS.
BLOCK: 1644 LOT: 42
21. CONCRETE HOUSEKEEPING PADS TO SUITE MECHANICAL EQUIPMENT SHALL BE SIZED AND LOCATED BY THE MECHANICAL
CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL BE 6 INCHES. PAD SHALL EXTEND BEYOND EQUIPMENT A MINIMUM
OF 6 INCHES ON ALL SIDES. CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. IT SHALL BE
LEGEND ZONE: R6B MAP: 17a
JOB NUMBER
THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE SIZE AND LOCATION OF CONCRETE HOUSEKEEPING
PADS WITH THE GENERAL CONTRACTOR. SCOPE OF WORK
22. ALL MECHANICAL ROOM DOORS AND ENTRANCES SHALL BE ADEQUATELY SIZED TO ALLOW FOR PROPER MAINTENANCE AND
SUPPLY RISER
TR1 PROGRESS INSPECTIONS CATEGORY MECHANICAL FILING IN CONJUNCTION WITH ALT II
B00784565-I1
TRANSPORT OF REPLACEMENT EQUIPMENT AND PARTS.
SUPPLY DROP APPLICATION #B00787428.
23. WHERE BEAMS ARE INDICATED TO BE PENETRATED WITH DUCTWORK OR PIPING, COORDINATE DUCTWORK OR PIPING LAYOUT Y N PROGRESS INSPECTIONS CODE APPROVAL STAMP
WITH BEAM OPENING SIZES AND LOCATIONS. COORDINATION SHALL BE DONE PRIOR TO FABRICATION OF DUCTWORK,
CUTTING OF PIPING, OR FABRICATION OF BEAMS. ♦ ENERGY CODE COMPLIANCE INSPECTIONS BC 110.3.5
RETURN RISER
24. WHEN MECHANICAL WORK (HVAC, PLUMING, SHEETMETAL, FIRE PROTECTION, ETC.) IS SUBCONTRACTED, IT SHALL BE THE ♦ FINAL* - 28-116.24.2, BC 110.5, DIRECTIVE 14 OF 1975, AND 1 RCNY § 101-10 PRIMARY APPLICATION B00787428
MECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN
DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE MECHANICAL CONTRACT RETURN DROP PLUMBING APPLICATION B00784566
OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR THE PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL
BE BROUGHT TO THE ATTENTION OF THE MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
TR1 SPECIAL INSPECTIONS CATEGORY
EXHAUST RISER DRAWING LIST
25. THE LOCATION OF ALL ITEMS SHOWN ON THE DRAWING OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY
FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND
TR8 ENERGY CODE PROGRESS INSPECTION Y N SPECIAL INSPECTIONS CODE SHEET # SHEET TITLE 0 1 2 3 4
RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITION AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE
BEING INSTALLED. DO NOT SCALE DRAWINGS. EXHAUST DROP ♦ ALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN # BC 1704.14 M-001 GENERAL NOTES & PLOT PLAN ♦
TABLE REFERENCE IN 1RCNY §5000-01(h)(1) AND (2) ♦ SMOKE CONTROL SYSTEMS BC 1704.15
26. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SHOWN IN DETAILS FOR PIPING, DUCTWORK, M-002 GENERAL NOTES ♦
AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR. ROOF EXHAUST FAN Y N PROGRESS INSPECTIONS CODE ♦ MECHANICAL SYSTEMS BC 1704.16 M-101 MECHANICAL FLOOR PLANS ♦
♦ FIREPLACES (IB1), (IIB1) ♦ HIGH-PRESSURE STEAM PIPING (WELDING) BC 1704.18
27. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS, WHERE REQUIRED, TO SERVICE DAMPERS, VALVES, M-102 MECHANICAL FLOOR PLANS ♦
SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANELS SHALL BE TURNED OVER TO GENERAL ♦ VENTILATION AND AIR DISTRIBUTION SYSTEM (IB2) ♦ HIGH TEMPERATURE HOT WATER PIPING (WELDING) BC 1704.18 SHEET TITLE
EXHAUST AND WALL HEATING RISER DIAGRAMS
EQUIPMENT ANNOTATION M-201 ♦
CONTRACTOR FOR INSTALLATION. ♦ SHUTOFF DAMPERS (IIB2) ♦ HIGH-PRESSURE FUEL-GAS PIPING (WELDING) BC 1704.19 & SCHEDULES GENERAL NOTES
28. ALL EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND REQUIRED TO PROVIDE A
VIBRATION FREE INSTALLATION.
♦ HVAC-R AND SERVICE WATER HEATING EQUIPMENT (IB3), (IIB3) ♦ HEATING SYSTEMS BC 1704.25 M-202 VRF RISER DIAGRAMS & SCHEDULES ♦
& PLOT PLAN
KE ♦ HVAC-R AND SERVICE WATER HEATING SYSTEM CONTROLS (IB4), (IIB4) ♦ CHIMNEYS BC 1704.26 M-301 DETAILS ♦
X
RISER ANNOTATION
29. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED WITH GENERAL ♦ HVAC-R AND SERVICE WATER PIPING DESIGN AND INSULATION (IB5), (IIB5) ♦ FIRE-RESISTANT PENETRATIONS AND JOINTS BC 1704.27 ENERGY COMPLIANCE STATEMENTS &
EN-001 ♦
CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE INSPECTIONS SEAL & SIGNATURE DRAWN BY
♦ DUCT LEAKAGE TESTING, INSULATION, AND DESIGN (IB6), (IIB6) ♦ EMERGENCY AND STANDBY POWER SYSTEMS (GENERATORS) BC 1704.31
BEAM CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED. THE USE OF COMCHECK MECHANICAL ENERGY COMPLIANCE
C-CLAMPS SHALL NOT BE PERMITTED. EN-101 ♦ HH
♦ MAINTENANCE INFORMATION (ID1), (IID1) ♦ POST-INSTALLED ANCHORS (BB# 2014-018, 2014-019) BC 1704.32 REPORT
CHECKED BY
30. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL CONTRACTOR SHALL BE FURNISHED
BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR.
MV
31. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENING SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED.
32. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH A PRODUCT SIMILAR
TO 3M OR APPROVED EQUAL.
MICHAEL J. VORLAND, RA
M-001.00
NYS LICENSE: 036993 1 OF 9
HEATING, VENTILATING AND AIR CONDITIONING SPECIFICATIONS TURNING VANES, MOTORIZED DAMPERS, ZONE DAMPERS, STORMPROOF LOUVERS, ETC.
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR AND TESTS REQUIRED TO INSTALL COMPLETE AND * PROVIDE REFRIGERANT AND CONDENSATE DRAIN PIPING.
OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWING, AS SPECIFIED AND AS REQUIRED BY CODE. 1. GENERAL * PROVIDE EQUIPMENT SUPPORTS, CONCRETE PADS, VIBRATION ISOLATORS, ROOF CURB.
* PROVIDE ACOUSTICAL LINING, DUCTWORK INSULATION AND PIPING INSULATION AND WEATHERPROOF JACKETING.
2. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME DAMPERS, ETC., ARE INDICATED ON THE A. THESE SPECIFICATIONS SHALL FORM A PART OF THE CONTRACT DOCUMENTS. GENERAL AND MISCELLANEOUS CONDITIONS SHALL * PROVIDE AUTOMATIC TEMPERATURE CONTROLS, CONTROL PANELS, CONTROL WIRING, THERMOSTATS, HUMIDISTATS, SOLENOID
CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS APPLY TO THIS PART OF THE WORK. VALVES, SWITCHES, RELAYS, ETC.
THE EXTENT OF THE REQUIREMENTS FOR THESE ITEMS. B. ALL WORK AND MATERIALS SHALL COMPLY WITH LAWS AND REQUIREMENTS OF THE LANDLORD, BUILDING MANAGEMENT AND
THE REQUIREMENTS OF THE ARCHITECT AN ENGINEERS. 8. COORDINATION
3. ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED, AND TESTED IN ACCORDANCE WITH THE MOST RESTRICTIVE OF LOCAL C. THE CONTRACTOR SHALL VISIT AND REVIEW THE PROJECT SITE PRIOR TO SUBMITTING HIS PROPOSAL AND SHALL COMMUNICATE A. COORDINATE LOCATION OF MECHANICAL EQUIPMENT, PIPING AND DUCTWORK WITH WORK OF OTHER TRADES, PROVIDING
REGULATIONS, PROCEDURES DETAILED IN THE ASHRAE HANDBOOK OF FUNDAMENTALS, OR THE APPLICABLE STANDARDS WITH THE ARCHITECT TO CLARIFY AND QUESTIONS HE MAY HAVE. CLEARANCES FOR INSULATION, SERVICING, REMOVAL OF COMPONENTS AND EQUIPMENT DISASSEMBLY.
ADOPTED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION. D. THE CONTRACTOR SHALL COORDINATE THE WORK WITH THE GENERAL CONTRACTOR, ALL OTHER CONTRACTORS AND ALL OTHER B. COORDINATE PROVISION OF OPENINGS IN WALLS AND LABS, POURING OF CONCRETE PADS, SETTING OF SLEEVES AND CURBS WITH
DRAWINGS AND SPECIFICATIONS (SUCH AS: ARCHITECTURAL, MECHANICAL, ELECTRICAL, ETC.) WHICH FORM A PART OF THE LANDLORD AND ARCHITECT.
4. DUCTWORK SHALL BE INSULATED OR LINED PER SPECIFICATIONS OR AS NOTED ON THE DRAWINGS. ALL DUCT JOINTS SHALL BE CONTRACT DOCUMENTS. C. VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS.
829 EAST 15 STREET
SEALED PER SPECIFICATIONS. E. THE CONTRACTOR SHALL RETAIN A LICENSED PROFESSIONAL ENGINEER FOR PERFORMING CONTROLLED INSPECTION, AS PER N.Y.C. D. SEQUENCE PHASES OF MECHANICAL WORK WITH THE WORK OF OTHER TRADES.
BROOKLYN NY 11230
BUILDING CODE REQUIREMENTS. T: 718-865-9350
5. UNLESS OTHERWISE SHOWN, LOCATED ALL ROOM THERMOSTATS AND HUMIDISTATS 4"-0" (CENTERLINE) ABOVE FINISHED F. ALL EQUIPMENT SHALL BE APPROVED FOR USE IN N.Y.C. AND SHALL HAVE MEA NUMBERS. 9. EQUIPMENT AND MATERIAL QUALITY
E: [email protected]
FLOOR. NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE ABOVE LOCATION CANNOT BE MAINTAINED OR WHERE THERE IS A G. ALL WORK PERFORMED AND EQUIPMENT INSTALLED UNDER THIS CONTRACT SHALL BE GUARANTEED FOR ONE (1) YEAR FROM THE A. EQUIPMENT AND MATERIALS SHALL BE NEW AND WITHOUT BLEMISH OR DEFECT.
QUESTION ON LOCATION. FINAL ACCEPTANCE, UNLESS OTHERWISE NOTED. B. EQUIPMENT AND MATERIALS SHALL CONFORM TO THE NATIONAL FIRE CODE, NATIONAL ELECTRICAL CODE AND LOCAL CODES
H. THE CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR AS TO THE EXTENT AND CAPACITY OF POWER WIRING REQUIRED FOR HAVING JURISDICTION. PROVIDE EQUIPMENT AND MATERIALS LISTED BY UNDERWRITER'S LABORATORIES, INC., EXCEPT WHERE
6. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS. THE ACTUAL EQUIPMENT (SUCH AS CONDENSING UNITS, ROOFTOP UNITS, FANS, MOTORIZED DAMPERS, AUTOMATIC CONTROL SUCH LISTING IS NOT AVAILABLE.
PANEL, ETC.) INSTALLED BY THIS CONTRACTOR, BEFORE SUBMITTING HIS PROPOSAL. IT SHALL BE UNDERSTOOD THAT THE WIRING C. WHERE PRODUCTS ARE NAMED IN THE SPECIFICATIONS BY MANUFACTURER'S CATALOG NUMBER, THIS ESTABLISHES THE MINIMUM
7. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE NOT INCLUDED IN THE NOTIFICATION WILL BE PERFORMED BY THIS CONTRACTOR. LEVEL OF QUALITY WHICH MUST BE MET OR EXCEEDED BY THE PRODUCT PROVIDED.
INCREASED TO COMPENSATE FOR DUCT LINING THICKNESS. I. ALL EQUIPMENT SHALL BE PROVIDED AS NOTED ON PLANS OR SPECIFICATIONS, OR APPROVED EQUAL. D. EQUIPMENT OF ONE TYPE SHALL BE THE PRODUCT OF ONE MANUFACTURER.
J. MISCELLANEOUS STEEL SUPPORTS AND HANGERS AND VIBRATION ISOLATORS SHALL BE PROVIDED UNDER THIS CONTRACT.
8. PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS OTHERWISE INDICATED. ELBOWS IN K. OPERATING PERMITS FOR EQUIPMENT INSTALLED SHALL BE OBTAINED BY THIS CONTRACT.
DISHWASHER, KITCHEN, AND LAUNDRY EXHAUST SHALL BE UNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL L. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING WORK PERMITS, ARRANGING INSPECTIONS BY AND OBTAINING 10. DELIVERY, STORAGE AND HANDLING SCHEDULE, ACCESS, ELEVATOR CAPACITIES, OPENINGS
TO 1-1/1 TIMES THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH TURNING VANES. APPROVALS FROM AUTHORITIES HAVING JURISDICTION. A. DELIVER PRODUCTS PROPERLY IDENTIFIED AND LABELED WITH NAME, MODEL NUMBER, ETC., IN MANUFACTURER'S CONTAINERS.
M. A 7-DAY NOTICE OF ANY BUILDING SYSTEM SHUTDOWN SHALL BE GIVEN PRIOR TO WORK WHICH WOULD CAUSE A DISRUPTION IN DELIVER PIPES WITH FACTORY-APPLIED CAPS.
9. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATION WITH ARCHITECTURAL REFLECTED CEILING PLANS, LIGHTING, AND SERVICE. B. STORE MATERIALS IN A CLEAN DRY PLACE AND PROTECT FROM WEATHER AND PHYSICAL DAMAGE, AS APPROVED BY LANDLORD.
OTHER CEILING ITEMS AND MAKE MINOR DUCT MODIFICATIONS TO SUIT. N. ALL DEMOLITION AND PATCHING WORK SHALL BE PERFORMED UNDER THIS CONTRACT. C. COMPLY WITH MANUFACTURER'S RIGGING AND HANDLING INSTRUCTIONS.
O. ALL AUTOMATIC TEMPERATURE AND CONTROL WIRING SHALL BE PERFORMED UNDER THIS CONTRACT.
P. MISCELLANEOUS STEEL SUPPORTS AND HANGERS AND VIBRATION ISOLATORS SHALL BE PROVIDED UNDER THIS CONTRACT. 11. PIPING
10. FIELD ERECTED AND FACTORY ASSEMBLED AIR HANDLING UNIT COILS SHALL BE ARRANGED FOR REMOVAL FROM THE
A. REFRIGERANT TUBING SHALL BE ASTM B 280, TYPE ACR, HARD-DRAWN STRAIGHT LENGTHS, AND SOFT-ANNEALED COILS, SEAMLESS
ISSUE
UPSTREAM SIDE WITHOUT DISMANTLING SUPPORTS. PROVIDE GALVANIZED STRUCTURAL STEEL SUPPORTS FOR ALL COILS 2. APPROVALS AND SUBSTITUTIONS
(EXCEPT LOWE5T COIL) IN BANKS OVER TWO COILS HIGH TO PERMIT INDEPENDENT REMOVAL OF ANY COIL. COPPER TUBING. TUBING SHALL BE FACTORY CLEANED, WITH ENDS CAPPED. FITTINGS SHALL BE ANSI B16.22, STREAMLINED FILING SET
A. IT IS THE INTENT OF THESE SPECIFICATIONS THAT WHENEVER A MANUFACTURER IS SPECIFIED AND SUBSTITUTIONS ARE MADE, PATTERN. BRAZING FILLER METALS SHALL BE AWS A5.8, CLASSIFICATION BAG-1 (SILVER).
11. ALL AIR HANDLING UNITS SHALL OPERATE WITHOUT MOISTURE CARRYOVER. THEY SHALL CONFORM IN ALL ASPECTS TO THE SPECIFIED ITEM. CRITERIA AS DELINEATED FOR EQUIPMENT SHALL BE INTERPRETED B. CONDENSATE PIPING TO INDIRECT WASTE SHALL BE TYPE "L" COPPER TUBE (HARD TEMPER) WITH CAST BRONZE SOLDER JOINT REVISIONS
AS MINIMUM PERFORMANCE REQUIREMENTS. FITTING AND 95/5 SILVER SOLDER. ALL VALVES SHALL BE GATE VALVES RATED FOR 125 LBS. WORKING PRESSURE.
12. LOCATE ALL MECHANICAL EQUIPMENT (SINGLE DUCT, DUAL DUCT, VARIABLE VOLUME, CONSTANT VOLUME AND FAN B. SUBSTITUTED EQUIPMENT, WHERE PERMITTED, MUST CONFORM TO SPACE REQUIREMENTS. ANY SUBSTITUTED EQUIPMENT THAT C. CONDENSATE PIPE SHALL BE TRAPPED AT THE CONDENSATE PAN OUTLET AND SHALL HAVE CLEAN-OUT FITTINGS AT EACH TURN IN # DATE DESCRIPTION
POWERED BOXES, FAN COIL UNITS, CABINET HEATERS, UNIT HEATERS, UNIT VENTILATORS, COILS, STEAM HUMIDIFIERS, ETC.) CANNOT MEET SPACE REQUIREMENTS, WHETHER APPROVED OR NOT, SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. ANY PIPE DIRECTION AND AT INTERVALS OF 25 FEET IN STRAIGHT PIPE RUNS.
FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING. MODIFICATION TO RELATED SYSTEMS OR ADDITIONAL COSTS THAT RESULTS FORM SUBSTITUTED EQUIPMENT SHALL BE BORNE BY D. INDIRECT WASTE SHALL BE PROVIDED WITH TRAPPED AND VENTED FUNNEL DRAINS AND AIR GAPS, CONNECTED TO THE BUILDING 0 09/02/22 INITIAL
THE CONTRACTOR. SANITARY DRAIN. INDIRECT WASTE AND VENT PIPING SHALL BE NO-HUB CAST IRON.
13. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN AND EXHAUST) CONNECTED TO AIR HANDLING C. IT SHALL BE MANDATORY FOR THIS CONTRACTOR TO SUBMIT HIS PROPOSAL PRICE BASED ON SPECIFIED MANUFACTURER OR E. ALL PIPING SHALL BE INSTALLED WITH SUFFICIENT PITCH TO ALLOW FOR NATURAL AIR ELIMINATION AT THE TOP AND GRAVITY 1 09/13/22 REVISION
UNITS, FANS, AND OTHER EQUIPMENT, WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDE AT SUPPLIER OF MATERIALS OR SERVICES. IF THE CONTRACTOR DESIRES TO SUBSTITUTE OTHER THAN SPECIFIED, HE SHALL SUBMIT DRAIN AT THE BOTTOM.
THE POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED. SEPARATE PRICES FOR EACH OF THESE ITEMS FOR ADDITIONS OR DEDUCTIONS TO CONTRACT PROPOSAL PRICE; FOR ACCEPTANCE F. DIELECTRIC FITTINGS SHALL BE PROVIDED WHERE DISSIMILAR METALS ARE JOINED. 2 11/14/22 REVISION
OR REJECTION AT THE TIME WHEN BIDS ARE DUE. SHOULD THESE SUBSTITUTIONS BE REJECTED, THE CONTRACTOR SHALL BE G. ALL EXPOSED AND EXTERIOR PIPING SHALL BE PROVIDED WITH PVC WATERPROOF JACKET.
14. UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO THE UNDERSIDE OF THE STRUCTURE, WITH SPACE FOR REQUIRED TO PROVIDE SPECIFIED MATERIALS AND SERVICES. H. PROVIDE FLEXIBLE PIPING CONNECTIONS AT ROTATING EQUIPMENT I.E. PUMPS, HEAT PUMPS. 3 11/17/22 REVISION
INSULATION IF REQUIRED. 3. VERIFYING EXISTING CONDITIONS, REMOVALS AND ALTERATIONS
12 SLEEVES AND ESCUTCHEONS FOR PIPING 4 11/21/22 REVISION
15. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 3 FEET. A. THE CONTRACTOR SHALL VISIT THE PREMISES TO BE DETERMINE ACCESS OF EXISTING CONDITIONS AND COMPARE SAME WITH * INSTALL GALVANIZED STEEL PIPE SLEEVES WHERE PIPING PASSES THROUGH WALLS, FLOORS, CEILINGS AND ROOFS. FOR INSULATED
DRAWINGS AND SPECIFICATION AND SATISFY HIMSELF OF ALL CONDITIONS PRIOR TO THE SUBMISSION OF A BID PROPOSAL. THE CHILLED WATER PIPES ALLOW CLEARANCE FOR INSULATION PASSING THROUGH SLEEVES. INSTALL PIPE ESCUTCHEONS WERE
16. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND CONTRACTOR SHALL VISIT PREMISES TO DETERMINE ACCESS OF MATERIAL AND EQUIPMENT DELIVERY TO THE SITE AND SHALL PENETRATION IS EXPOSED TO VIEW.
TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. COORDINATE WITH BUILDING MANAGEMENT. NO ALLOWANCES WILL BE MADE FOR FAILURE TO COMPLY WITH THESE * PIPING SLEEVES THROUGH FLOORS OR ROOFS SHALL BE SCHEDULE 40 STEEL AND THROUGH INTERIOR WALLS AND PARTITIONS 318
REQUIREMENTS AND A BID PROPOSAL SHALL BE CONSTRUED AS EVIDENCE HE HAS DONE SO. GAUGE GALVANIZED STEEL.
17. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, B. EXISTING INSTALLATIONS ARE NOT DETAILED ON DRAWINGS. THE CONTRACTOR SHALL SURVEY THE SITE AND ASSESS EXISTING * SPACE BETWEEN PIPE OR PIPE INSULATION SHALL BE CAULKED WITH INCOMBUSTIBLE MATERIAL, ROPE OR MINERAL WOOL TO
VOLUME DAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN THE DUCTWORK WHICH REQUIRE SERVICE AND/OR CONDITIONS AND SPACE LIMITATIONS. WITHIN 1/2" OF WALL SPACES AND FILLED WITH CAULKING COMPOUND TO WALL SPACES.
INSPECTION. C. RETAIN ALL EXISTING MECHANICAL WORK OUTSIDE THE AREA OF WORK UNLESS OTHERWISE NOTED. * SEALING AND CAULKING OF PENETRATION:
D. PROVIDE SHUTDOWNS, DRAINING AND REFILLING, RECONNECTIONS AND STARTUPS OF EXISTING SYSTEMS NECESSARY IN A. SEAL AIRTIGHT OPENINGS AROUND PIPES PENETRATING WALLS AND FLOORS.
18. FIRE DAMPERS SHALL COMPLY WITH THE REQUIREMENTS OF UL555S. ONLY FIRE DAMPERS LABELED FOR USE IN DYNAMIC CONNECTION WITH THE NEW YORK. COORDINATE SHUTDOWNS WITH THE LANDLORD. B. AT PENETRATIONS THROUGH FIRE-RATED WALLS AND FLOORS, PROVIDE SMOKE AND FIRE STOPPING SEALANTS ACCEPTABLE TO
SYSTEMS SHALL BE INSTALLED IN HVAC SYSTEMS DESIGNED TO OPERATE WITH FANS ON DURING A FIRE. E. DISCONNECT AND REMOVE EXISTING WORK IN AREA OF WORK UNLESS OTHERWISE NOTED ON PLANS, INCLUDING ASSOCIATED AUTHORITIES HAVING JURISDICTION.
SUPPORTS, HANGERS, INSULATION, CURBS, ETC. REMOVE FROM SITE AND LEGALLY DISPOSE OF DEMOLISHED MATERIALS AND C. COMPLY WITH SEALANT MANUFACTURER'S INSTRUCTIONS.
19. SMOKE DAMPERS SHALL COMPLY WITH THE REQUIREMENTS OF UL555S. COMBINATION FIRE AND SMOKE DAMPERS SHALL EQUIPMENT NOT INDICATED TO BE SALVAGED. PIPING SHALL BE CUT BACK TO ACTIVE MAINS AND PROVIDED WITH VALVED AND 13. DUCTWORK
COMPLY WITH THE REQUIREMENTS OF BOTH UL555 AND UL555S. CAPPED. DEAD ENDS ARE NOT PERMITTED. A. DUCTWORK SHALL BE GALVANIZED STEEL, UNLESS INDICATED OTHERWISE, AND SHALL BE INSTALLED IN ACCORDANCE WITH THE
F. CONTRACTOR SHALL DETERMINE AREAS OF WORK AND MAKE ALLOWANCES FOR WORK IN ADJACENT SPACES. AFFECTED AREAS LATEST S.M.A.C.N.A. STANDARDS FOR 2 INCH PRESSURE CLASS, OR HIGHER AS REQUIRED.
20. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION, ADJUSTMENT, AND MAINTENANCE OF ALL FANS, VALVES, AND DISTURBED SHALL BE RETURNED TO THEIR ORIGINAL CONDITIONS. B. ALL DUCTWORK SHALL BE SEALED PER SEALANT CLASS A REQUIREMENTS WHICH INCLUDES ALL TRANSVERSE JOINTS AND
MECHANICAL EQUIPMENT. G. SYSTEMS SERVING AREAS ADJACENT TO THE AREA OF WORK SHALL REMAIN ACTIVE THROUGHOUT ALL PHASES OF DEMOLITION LONGITUDINAL SEAMS.
AND CONSTRUCTION. SYSTEMS SERVING THESE AREAS, PASSING THROUGH THE AREA OF WORK SHALL EITHER REMAIN IN PLACE OR C. EXPOSED DUCTS SHALL HAVE FLAT SEAM CONSTRUCTION. TAPE IS NOT ACCEPTABLE.
21. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER GROUNDING STRAPS. GROUNDING BE REROUTED AND RECONNECTED WITH MINIMUM DISRUPTION TO NON-WORK AREAS. D. ROUND AND OVAL DUCTWORK SHALL BE CONSTRUCTED FROM ALUMINUM-ZINC COATED STEEL WITH A SPIRAL GROOVED FLAT
STRAPS SHALL BE BOLTED OR SOLDERED TO BOTH THE EQUIPMENT AND THE DUCT. H. THE CONTRACTOR SHALL REMOVE, RELOCATE, REPLACE, ADJUST, ADAPT AND MODIFY EXISTING EQUIPMENT AND/OR SYSTEMS AS LOCK SEAM (SMACNA TYPE RL-5). DUCTS SHALL BE CONNECTED WITH SLIP JOINT CONNECTORS. A SEALANT SHALL BE APPLIED
REQUIRED BY THE DRAWINGS OR SPECIFICATION, AND AS MAY BE REQUIRED WITH THE COMPLETION OF WORK IN THIS CONTRACT. AROUND THE SLIP JOINTS AND POP RIVETED TOGETHER IN A SYMMETRICAL ORDER. ALL DUCT TO DUCT JOINTS SHALL BE MADE
22. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL CONTRACTOR. THE MECHANICAL CONTRACTOR I. TEMPORARY SERVICES: PROVIDE TEMPORARY SERVICES DURING THE INTERRUPTION IN SERVICE CREATED BY THE DEMOLITION OF WITH THE SPIRAL SEAM ROTATED TO FORM A CONTINUOUS HELICAL PATTERN AT JOINT. ALL ELBOWS SHALL BE STANDING SEAM
SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE DETECTOR IN DUCTWORK AS SHOWN ON THE DRAWINGS AND IN THE EXISTING FACILITY AND UNTIL THE NEW FACILITY BECOMES OPERATIONAL. PROCURE RENTAL EQUIPMENT OF ADEQUATE GORED. ALL TAPS FOR BRANCH DUCTWORK SHALL BE MADE WITH STRAIGHT BODY 90 DEGREE CONICAL TAP AND VOLUME
ACCORDANCE WITH MANUFACTURER'S PRINTED INSTRUCTIONS. CAPACITIES AND ASSUME ALL COSTS RELATED TO THE INSTALLATION AND OPERATION OF SAME. SECURE NECESSARY PERMITS AND DAMPER. ALL REGISTER COLLARS SHALL BE ATTACHED TO DUCTWORK WITH POP RIVETS WITH A FINISHING FILLET OF ELASTOMER
PROVIDE CONNECTIONS TO BUILDING UTILITIES, INCLUDING ELECTRICAL. SEALER APPLIED TO THE COLLAR DUCT JUNCTION.
23. TERMINATE GAS VENTS FOR UNIT HEATERS, WATER HEATERS, HIGH PRESSURE PARTS WASHER, HIGH PRESSURE CLEANER, AND J. CONTRACTOR SHALL PROJECT ALL EXISTING FIRE PROTECTION SYSTEMS THROUGHOUT DEMOLITION AND CONSTRUCTION. E. FLEXIBLE CONNECTION SHALL BE USED AT ALL DUCT CONNECTIONS TO ROTATING EQUIPMENT. FLEXIBLE DUCT SHALL NOT EXCEED
OTHER GAS APPLIANCES A MINIMUM OF 3'-0" ABOVE ROOF WITH RAIN CAP. 4. SUBMITTALS SIX (6) INCHES IN LENGTH AND BE CONSTRUCTED OF FIBERGLASS CLOTH, STEEL SPRING FRAME, VAPOR BARRIER AND FIRE RATED
A. THIS CONTRACTOR SHALL, PRIOR TO PURCHASING, MANUFACTURING, OR INSTALLING, SUBMIT TO THE ARCHITECT FOUR (4) COPIES CONFORMING TO N.F.P.A. 90A.
24. SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS, AND OTHER REQUIREMENTS. OF THE FOLLOWING: F. AIR PLENUM (CASING) SHALL BE CONSTRUCTED FROM CONTINUOUS 1-1/2 INCH STANDING SEAM REINFORCED PANELS OF 16
1. SHOP DRAWING OF THE EXISTING AND PROPOSED DUCTWORK AND PIPING SYSTEMS, IN THE AREA OF WORK. GAUGE MINIMUM GALVANIZED SHEET METAL WITH BLACK IRON STIFFENERS. CASINGS SHALL BE CONSTRUCTED FOR TWO (2)IN.
25. EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. DETAILED DESCRIPTIONS ARE PROVIDED IN THE ARCHITECTURAL * SHOP DRAWINGS SHALL BE DRAWN TO THE SCALE NOT SMALLER THAN 3/8"=1'=0. W.G. PRESSURE CLASSIFICATION. CASINGS SHALL BE RECTANGULAR BOX SHAPE. TAPERED SIDES SHALL BE AVOIDED. ACCESS DOORS
SPECIFICATIONS. * SHOP DRAWINGS SHALL INDICATE OTHER ELEMENTS LOCATED IN THE VICINITY OF THE DUCTWORK AND PIPING SYSTEMS, SUCH AS: SHALL BE PROVIDED ON EACH END OF CASING. BOTTOM PANEL SHALL BE PITCHED TO THE EXTERIOR. CAULK ALL JOINTS AIR AND
STRUCTURAL ELEMENTS, ELECTRICAL FIXTURES, CONDUITS, OTHER PIPING SYSTEMS, EQUIPMENT, APPLIANCES, FIXTURES, WATER TIGHT.
26. EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. LOUVER SIZES, LOCATIONS, AND DETAILS SHALL BE SPRINKLER HEADS, ETC. G. PROVIDE FUSIBLE LINK FIRE DAMPERS AT LOCATIONS SHOWN ON DRAWINGS AND WHERE NECESSARY TO COMPLY WITH LOCAL OR
COORDINATED WITH GENERAL CONTRACTOR. * LOCATIONS SHALL BE COORDINATED WITH ALL OTHER TRADES AND WITH ALL ARCHITECTURAL DRAWINGS. OTHER AGENCIES OR JURISDICTIONS REQUIRING THEIR INSTALLATION, AND IN COMPLIANCE WITH THEIR CONSTRUCTION
2. PIPING AND SHEETMETAL CONSTRUCTION STANDARDS. THESE SUBMITTALS SHALL BE APPROVED PRIOR TO REVIEWING REQUIREMENTS. FIRE DAMPERS SHALL BE U.L. LISTED.
27. EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. LOUVER SIZES, LOCATIONS, MOUNTING, AND DETAILS SHALL BE SHEETMETAL OR PIPING SHOP DRAWINGS. H. DUCTWORK LAYOUT AND ROUTES AS SHOWN ON THE DRAWINGS ARE SCHEMATIC. CHANGES IN DUCT SIZES AND/OR LOCATIONS
COORDINATED WITH OTHER TRADES INVOLVED. 3. CATALOG DATA INDICATING FITTING, VIBRATION ISOLATORS, VALVES, HANGERS, ATTACHMENTS, ETC. SHALL BE MADE WHERE NECESSARY TO CONFORM TO SPACE CONDITIONS OR OBTAIN MAXIMUM HEADROOM CONDITIONS
4. CATALOG DATA FOR ALL EQUIPMENT, APPLIANCES, DEVICES, ETC. WITHOUT ADDITIONAL COSTS TO THE OWNER.
28. PROVIDE AN INSULATED STAINLESS STEEL SHEETMETAL DRAIN PAN BELOW ALL CEILING HUNG FAN COIL UNITS. THE DRAIN PAN 5. AIR OUTLET SUBMISSION TO INCLUDE: SCHEDULE OF AIR OUTLETS, ROOM SERVED, MANUFACTURER, MODEL NUMBER, SIZES, AIR I. AIR DIFFUSERS AND GRILLES SHALL BE LOCATED IN CONFORMANCE TO ARCHITECTURAL PLANS.
SHALL BE 4" DEEP AND SHALL EXTEND 6" BEYOND THE EDGE OF THE FAN COIL UNIT. PROVIDE TRAP AND DRAIN PIPING. PATTERNS, CFMS, NC LEVELS, ACCESSORIES, FINISHES, ETC. J. PROVIDE VOLUME DAMPERS AS INDICATED AND ANY ADDITIONAL VOLUME DAMPERS REQUIRED FOR AIR BALANCING, REGARDLESS
PROVIDE A LEAK DETECTION SENSOR IN THE DRAIN PAN WIRED TO SHUT DOWN THE FAN COIL UNIT AND ANNUNCIATE AN 6. POINT-TO-POINT WIRING DIAGRAMS FOR POWER AND CONTROL WIRING. OF WHETHER OR NOT CALLED FOR ON THE THE DRAWINGS. PROJECT ADDRESS
ALARM CONDITION. 7. "AS-BUILT" DRAWINGS INDICATING ACTUAL LOCATIONS OF ALL WORK PERFORMED BY THE CONTRACTOR. DRAWINGS SHALL BE K. FRAMING FOR ALL AIR DISTRIBUTION DEVICES SHALL CONFORM TO AND ACCOMMODATE WALL OR CEILING CONSTRUCTION WHERE
B.
STAMPED AND SIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF NEW YORK, PRIOR TO SUBMISSION.
THE CONTRACTOR SHALL, PRIOR TO SHOP SUBMISSIONS, SUBMIT A "SHOP DRAWING SUBMITTAL AND REVIEW SCHEDULE", LISTING
INSTALLED. 645 PUTNAM AVENUE
29. THE SHEET METAL SHOP DRAWINGS SHALL INDICATE ALL HUNG CEILING STARING POINTS, ELEVATIONS AND BREAK LINES. L. SUPPLY REGISTERS AND CEILING DIFFUSERS SHALL BE FURNISHED WITH INTEGRAL OPPOSED BLADE VOLUME DAMPERS.
WHERE PIPING, LIGHTS AND DUCTWORK CONFLICTS; DUCTWORK SHALL BE SET UP OR DOWN. ALL SHOP DRAWINGS, CATALOG DATA, WIRING DIAGRAMS, ETC.,INDICATING SUBMISSION DATES AND SHALL ALLOW TWO WEEKS M. KITCHEN EXHAUST DUCTWORK SHALL BE MADE FROM 18 GA GALVANIZED STEEL. BROOKLYN, NY 11221
FOR REVIEW. N. BATHROOM EXHAUST DUCTWORK SHALL BE MADE FROM ALUMINUM
30. SHOP DRAWING SHALL BE PREPARED WITH COMPLETE DIMENSIONAL INFORMATION, INCLUDING COORDINATES TO BRANCH
DUCT AND DIFFUSERS STUBS. ELEVATIONS TO THE UNDERSIDE OF EXISTING DUCTS AND NEW DUCTS SHALL BE CLEARLY
C.
D.
NO DEVIATIONS WILL BE ALLOWED FROM THE SUBMITTED "SHOP DRAWINGS SUBMITTAL AND REVIEW SCHEDULE".
SUBMITTALS NOT REQUIRED BY THE CONTRACT DOCUMENTS WILL NOT BE ACCEPTED TO REVIEWED.
O.
P.
ALL EXTERIOR DUCTWORK ON ROOF SHALL BE WRAPPED IN 3 LAYERS OF TAR PAPER, WATERPROOFED AND PAINTED WHITE.
SUPPLY REGISTER SHALL SERIES 300FL WITH OPPOSED BLADE VOLUME DAMPERS MADE BY TITUS, OR AS APPROVED.
BUILDING DATA
INDICATED ON THE DRAWING SUBMITTED AND SHALL BE CAREFULLY CHECKED FOR CONFORMANCE WITH CEILING HEIGHT Q. EXHAUST AND RETURN GRILLES SHALL BE SERIES 350FL MADE BY TITUS, OR AS APPROVED, WITH LIGHT SHIELD WHERE UN-DUCTED.
REQUIREMENTS. ALL CONFLICTS MUST BE FLAGGED ON THE SHOP DRAWINGS. 8. WRITTEN REPORTS R. LINEAR SLOT DIFFUSERS SHALL BE SERIES T700 MADE BY TITUS, OR AS APPROVED. BLOCK: 1644 LOT: 42
S. DOOR LOUVERS SHALL BE SERIES T700 MADE BY TITUS, OR AS APPROVED. ZONE: R6B MAP: 17a
31. CONTRACTOR SHALL BE RESPONSIBLE FOR BALANCING OF AIR QUANTITIES AT ALL AIR CONDITIONING OUTLETS AND RETURNS A. AIR AND WATER SYSTEM BALANCING SHALL BE PERFORMED BY AN AABC ACCREDITED ORGANIZATION SPECIALIZING IN THE T. LOUVERS SHALL BE STORM-PROOF TYPE MODEL NO. ELF6375D, MADE BY RUSKIN, OR AS APPROVED.
AS INDICATED ON THE PLANS FOR ALL HVAC SYSTEMS. SUBMIT DRAWINGS WITH MARKED DIFFUSER NUMBERS TO CROSS PROCEDURES TO DO SO, HAVING AT LEAST FIVE (5) YEAR'S EXPERIENCE. INSTRUMENTS SHALL BE PROPERLY CALIBRATED. U. EXHAUST AIR DISCHARGES SHALL BE LOCATED NO CLOSER THAN TEN (10) FEET FROM AN OPERABLE WINDOW OR FRESH AIR JOB NUMBER
REFERENCE BALANCING REPORT. B. BALANCING CONTRACTOR SHALL BALANCE ALL DIFFUSERS, FANS AND WATER FLOWS TO THE QUANTITIES INDICATED ON THE INTAKE.
DRAWINGS. AIR AND WATER FLOWS TO BE WITHIN 5% OF THE DESIGN FLOW QUANTITIES. CONTRACTOR SHALL MEASURE AND
RECORD ALL PERTINENT DATA: ELECTRICAL, FLUID DATA, RPM, STATIC PRIMARY AND VENTILATION AIR, ETC.
C. CONTRACTOR SHALL SUBMIT, TO THE ARCHITECT, THE FOLLOWING REPORTS, FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION
V.
W.
X.
GRILLE FINISHES AND COLORS SHALL BE SUBMITTED TO THE ARCHITECT FOR APPROVAL.
PROVIDE CABLE TYPE REMOTE VOLUME DAMPER ACTUATOR (COD) FOR VOLUME DAMPERS ABOVE INACCESSIBLE CEILINGS.
DUCT SMOKE DETECTORS SHALL BE PLACED IN SUPPLY AIR DUCTS AT THE AIR CONDITIONING AND AIR HANDLING UNIT DISCHARGE.
B00784565-I1
OF CEILINGS AND PARTITIONS:
1. PIPING FUNCTIONAL TEST REPORT, CERTIFYING THAT ALL SECTIONS OF THE DRAIN PIPING THAT DO NOT DRAIN OR CREATE 14. ACOUSTICAL INSULATION APPROVAL STAMP
FLOODING CONDITIONS. A. ALL SUPPLY, RETURN AND TRANSFER AIR SHEET METAL DUCTWORK SHALL BE INTERNALLY LINED. ACOUSTICAL LINING SHALL BE 1"
2. AIR BALANCING REPORT, CERTIFYING THAT ALL SECTIONS OF THE DUCTWORK AND THE COMPLETE SYSTEMS WERE TESTED, THAT THICK ACOUSTICAL INSULATION, MODEL 'PERMACOTE LINACOUSTIC STD', MADE BY MANVILLE.
THE COMPLETE SYSTEM IS FULLY FUNCTIONAL AND DISTRIBUTING AIR QUANTITIES WITHIN +/- 5% OF DESIGN. B. SHEET METAL DUCTS SIZES SHALL BE INCREASED TO ALLOW FOR ACOUSTICAL INSULATION. DUCT SIZES INDICATED ON THE
3. LOW PRESSURE DUCTWORK (-2" TO +2" WG) TEST TO BE AN AUDIBLE AND VISUAL CHECK FOR LEAKS. MAXIMUM LEAKAGE TO BE 5% DRAWINGS ARE THE CLEAR INSIDE DIMENSIONS.
MEDIUM PRESSURE DUCTWORK (BELOW-2" AND ABOVE +2" WG) TO BE PRESSURE TESTED WITH A BLOWER AND ORIFICE PLATE(S).
MAXIMUM LEAKAGE TO BE 5% 15. INSULATION
4. AUTOMATIC CONTROL SYSTEM TEST REPORT, CERTIFYING THAT ALL SECTIONS OF THE SYSTEM AND THE COMPLETE SYSTEM WERE A. ALL SUPPLY & RETURN AIR DUCTWORK SHALL BE WRAPPED WITH 1" THICK FIBERGLASS BLANKET INSULATION. INSULATION MAY BE
TESTED, THAT THE COMPLETE SYSTEM IS FULLY FUNCTIONAL. OMITTED ON ACOUSTICALLY LINED DUCTWORK.
D. INSTALLATION OF CEILINGS, PARTITIONS AND PIPE/DUCT INSULATION SHALL PROCEED UPON ACCEPTANCE AND APPROVAL OF THE B. ALL REFRIGERANT PIPING SHALL BE INSULATED WITH 3/4" ARMAFLEX.
REPORTS. C. ALL INTERIOR CONDENSATE DRAIN PIPING SHALL BE INSULATED WITH 3/4" ARMAFLEX WITH VAPOR BARRIER
E. INITIAL AIR BALANCING SHALL BE PERFORMED WITH TWO (2) LAYERS OF CHEESE CLOTH FASTENED TO ALL AIR OUTLETS AND INLETS
AND VOLUME DAMPERS INSTALLED IN THE DUCTWORK. 16. EQUIPMENT
F. FINAL AIR BALANCING AND THE FINAL SET OF AIR BALANCING REPORTS SHALL BE PERFORMED AND SUBMITTED TO THE ARCHITECT A. PROVIDE ALL EQUIPMENT AND ACCESSORIES OF THE SIZES CAPACITIES AS SPECIFIED ON THE DRAWINGS.
UPON COMPLETION OF CEILINGS AND PARTITIONS, AFTER THE FINAL AND PERMANENT REGISTERS, DIFFUSERS, SLOTS, GRILLES, B. INSTALL EQUIPMENT IN ACCORDANCE WITH APPROVED SHOP DRAWINGS, MANUFACTURERS INSTRUCTIONS AND ALL CODES AND
ETC., HAVE BEEN INSTALLED. REGULATIONS, WHICH APPLY. PROVIDE 3'-0" CLEARANCE(S) IN FRONT OF CONTROL PANEL(S) OF ANY EQUIPMENT. PROVIDE
G. POST-OCCUPANCY, GRILLE DAMPERS AND FLOW PATTERNS SHALL BE ADJUSTED TO MEET OCCUPANTS COMFORT REQUIREMENTS. ENOUGH SPACE AROUND EQUIPMENT TO ALLOW MAINTENANCE PERSONNEL UNRESTRICTED ACCESS TO ALL SERVICE POINTS
C. FOR CEILING MOUNTED EQUIPMENT PROVIDE SUPPORTS WITH APPROVED ANCHORS DIRECTLY FROM BUILDING STRUCTURE.
6. TESTS PROVIDE SUPPLEMENTARY STEEL AS REQUIRED TO ADEQUATELY SUPPORT THE LOAD.
A. THIS CONTRACTOR SHALL PROVIDE ACCEPTANCE TESTING AND CERTIFICATES OF THE COMPLETE HEATING AND AIR CONDITIONING SHEET TITLE
SYSTEMS AND INTERMEDIATE TESTING OF PARTIAL SYSTEMS PRIOR TO FINAL TESTING, AS REQUIRED BY PROJECT PHASING. 17. AUTOMATIC TEMPERATURE CONTROLS
B. ALL TESTS SHALL DONE IN PRESENCE OF THE AUTHORITIES HAVING JURISDICTION AND THE OWNER'S REPRESENTATIVE. MINIMUM A. PROVIDE A COMPLETE AUTOMATIC CONTROL SYSTEM FOR AIR CONDITIONING SYSTEM. THE SYSTEM SHALL BE UL LISTED AND GENERAL NOTES
SEVEN (7) DAY NOTICE SHALL BE GIVEN TO ALL PARTIES PRIOR TO TESTS. APPROVED FOR INSTALLATION IN NEW YORK CITY.
C. THIS CONTRACTOR SHALL PROVIDE EQUIPMENT, LABOR, INCIDENTALS, TEMPORARY SYSTEMS AND PAY ALL FEES REQUIRED FOR B. THE SYSTEM SHALL CONSIST OF AUTOMATIC DAMPERS, WALL THERMOSTAT, SWITCHES, TRANSFORMERS, RELAYS, ETC. ALL
TESTING. DEVICES, SUCH AS TRANSFORMERS, RELAYS, ETC., SHALL BE MOUNTED IN AN APPROVED PANEL/BOX. LOCATION OF AUTOMATIC
D. THIS CONTRACTOR SHALL RETAIN AN INDEPENDENT TESTING AND BALANCING FIRM TO PERFORM AIR BALANCING ACCORDING TO TEMPERATURE CONTROL PANEL SHALL BE APPROVED BY THE ARCHITECT.
THE ANSI/ASHRAE STANDARD #111-1989: PRACTICES FOR MEASUREMENT, TESTING, ADJUSTING AND BALANCING OF BUILDING C. THERMOSTAT LOCATIONS SHALL BE APPROVED BY THE ARCHITECT AND ENGINEER. SEAL & SIGNATURE DRAWN BY
HEATING, VENTILATING, AIR-CONDITIONING AND REFRIGERATION SYSTEMS AND SUBMIT FOUR (4) SETS OF AIR BALANCING D. WALL THERMOSTAT TYPE, SHAPE AND COLOR SHALL BE SUBJECT TO APPROVAL OF THE ARCHITECT AND ENGINEER.
REPORTS TO THE ARCHITECT FOR REVIEW. E. CONTRACTOR SHALL SUBMIT FOUR (4) COPIES OF POINT-TO-POINT WIRING DIAGRAMS, INDICATING A COMPLETE AUTOMATIC HH
E. THIS CONTRACTOR SHALL PERFORM GAS PRESSURE TESTING OF ALL PIPING INSTALLED BY HIM. TEST SHALL BE PERFORMED AT 250 TEMPERATURE CONTROL SYSTEM AND THE SEQUENCE OF OPERATION AND CATALOG CUT SHEETS OF ALL DEVICES, TO THE CHECKED BY
PSIG FOR 2 HOURS ON REFRIGERANT PIPING. THE CONTRACTOR SHALL SUBMIT FOUR (4) SETS OF TEST REPORTS TO THE ARCHITECT ARCHITECT FOR REVIEW, BEFORE MANUFACTURING.
FOR REVIEW. MV
7. SCOPE OF WORK
A. SCOPE OF WORK FOR THIS PROJECT SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:
* DEMOLITION AND REMOVAL OF EXISTING SYSTEMS AND EQUIPMENT. CUT, REMOVE AND CAP BRANCH DUCTWORK AND PIPING
BACK TO MAIN RISERS.
* PROVIDE EXHAUST FANS.
* PROVIDE PACKAGE TERMINAL AIR CONDITIONER THROUGH WINDOW GAS FIRED AND HEAT PUMP UNITS.
* PROVIDE DUCTWORK WITH SUPPLY AIR REGISTERS, RETURN AIR GRILLES, VOLUME DAMPERS, FIRE DAMPERS, ACCESS DOORS, MICHAEL J. VORLAND, RA
M-002.00
NYS LICENSE: 036993 2 OF 9
EXISTING PROPOSED
31'
1 STORY 3 ROOFTOP
CARS ABOVE
GARAGE GARAGE 829 EAST 15 STREET
BROOKLYN NY 11230
T: 718-865-9350
E: [email protected]
HP
36 INTERMITTENT EXHAUST
DUCT OPENINGS WITH
BACKDRAFT/GRAVITY
EXHAUST DUCT EXHAUST DUCT DAMPERS
RISER UP RISERS UP ISSUE
X2 FILING SET
T REVISIONS
AH # DATE DESCRIPTION
AH AH 07 0 09/02/22 INITIAL
09 EF PROPOSED KITCHEN
07 2 AND LIVING AREA 1 09/13/22 REVISION
BEDROOM 3
2 11/14/22 REVISION
100
CFM 2ND FL LIVING/KITCHEN AREA 3 11/17/22 REVISION
KEF MIN 7.20 MBH
1ST FL BEDROOM-3 1ST FL BEDROOM-2 INTERMITTENT EXHAUST 4 11/21/22 REVISION
MIN 3.45 MBH T MIN 3.71 MBH
T DUCT OPENING WITH
BEDROOM 2 BACKDRAFT/GRAVITY
AH DAMPER
OPEN CELLAR 07
T
STAIRS DN
MIN 17.9 MBH
50
EF CFM AH
1ST FL BEDROOM-1 1 BATH
MIN 2.74 MBH TEF 07
WC EF
STAIRS UP
STAIRS UP
50 AH LAV T 2ND FL BEDROOM-4
1 MIN 3.09 MBH
CFM 07 T
COMMON TEF
T LAV BEDROOM 4
SPACE LAV BATH BEDROOM 1 50
BATHCFM
AH EF
09 1 TEF
2ND FL BEDROOM-3
T 50 MIN 3.09 MBH
CFM TEF
WC
AH BATH
12 EF AH
1 LAV 07
T
LAV BEDROOM 3
WC BATH
OPEN SPACE TEF
T EF 50
T
1 CFM
LAV
DR.
AH
AH SHEET TITLE
DR. ELECTRICAL 07
ROOM 07 MECHANICAL
FLOOR PLANS
SEAL & SIGNATURE DRAWN BY
HH
CHECKED BY
MV
CELLAR MECHANICAL PLAN FIRST FLOOR MECHANICAL PLAN SECOND FLOOR MECHANICAL PLAN
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0"
MICHAEL J. VORLAND, RA
M-101.00
NYS LICENSE: 036993 3 OF 9
829 EAST 15 STREET
BROOKLYN NY 11230
T: 718-865-9350
E: [email protected]
INTERMITTENT EXHAUST
DUCT OPENINGS WITH ISSUE
BACKDRAFT/GRAVITY
DAMPERS FILING SET
REVISIONS
# DATE DESCRIPTION
0 09/02/22 INITIAL
09/13/22
6'-4" FDNY
1 REVISION
ACCESS
PATH
EF PROPOSED KITCHEN 2 11/14/22 REVISION
2 AND LIVING AREA
3 11/17/22 REVISION
100 4 11/21/22 REVISION
CFM 3RD&4TH FL LIVING/KITCHEN AREA
KEF
MIN 7.20 MBH
6' FDNY
AH ACCESS
07 PATH
HP
T
STAIRS DN
36
50
CFM AH
EF
1 TEF 07 HP
36
STAIRS UP
LAV T 3RD&4TH FL BEDROOM-4
MIN 3.09 MBH
T
LAV BEDROOM 4
50 HP
EF CFM 36
1 TEF
3RD&4TH FL BEDROOM-3 HP
50 MIN 3.09 MBH
CFM TEF 36
WC
EF AH
1 LAV 07 HP
T 36
LAV BEDROOM 3
WC 50
CFM
HP
EF TEF 36
1
AH
07
3RD&4THFL BEDROOM-2
MIN 3.21 MBH
3RD&4TH FL T
CORRIDOR BEDROOM 2 PROJECT ADDRESS
MIN 4.67 MBH
645 PUTNAM AVENUE
BROOKLYN, NY 11221
BUILDING DATA
AH BLOCK: 1644 LOT: 42
07 BEDROOM 1
ZONE: R6B MAP: 17a
3RD&4TH FL BEDROOM-1 JOB NUMBER
DN 17 MIN 2.99 MBH
B00784565-I1
EWH AH
1 07 APPROVAL STAMP
T
CL
6' FDNY
ACCESS
T PATH
3RD&4TH FL EXIST. BEDROOM-1
3RD&4TH FL EXIST. BEDROOM-2 T
MIN 5.23 MBH
MIN 3.64 MBH
EXISTING EXISTING
BEDROOM BEDROOM
6'-4" FDNY
ACCESS SHEET TITLE
PATH MECHANICAL
AH
AH 07 FLOOR PLANS
07
THIRD & FOURTH FLOOR MECHANICAL PLAN ROOF FLOOR MECHANICAL PLAN
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0"
MICHAEL J. VORLAND, RA
M-102.00
NYS LICENSE: 036993 4 OF 9
EXHAUST FAN SCHEDULE
TYPE ESP IN ELECTRICAL DATA
MANUFACTURER MODEL LOCATION OPERATION SERVING CFM SONES WEIGHT QUANTITY REMARKS
MARK W.C. VOLTAGE HZ AMPS
EF-1 HAMPTON BAY 7114-01 BATHROOMS INTERMITTENT 1 FOR EACH BATHROOM 50 0.10000 1.0 3.65 LBS 120 60 0.18 14
EF-2 WINFLO WR003C30 KITCHENS INTERMITTENT 1 FOR EACH KITCHEN RANGE 150-280 0.10000 10.0 21 LBS 110 60 1.5 4
NOTES:
1. PROVIDE DISCONNECT SWITCH, BACKDRAFT DAMPER, ALUMINUM INSECT SCREEN AND PREFABRICATED FLAT ROOF CURB BY FAN MANUFACTURER
2. AS PER MC 928.3.4, FAN EQUIPMENT WITH MOTORS IN EXCESS OF 1/2 HORSEPOWER LOCATED ABOVE GRADE SHALL BE MOUNTED ON VIBRATION ISOLATORS. THEREFORE, IF FAN EQUIPMENT MOTORS HAVE 829 EAST 15 STREET
BROOKLYN NY 11230
LESS THAN 1/2 HORSEPOWER, VIBRATION ISOLATORS ARE NOT REQUIRED. T: 718-865-9350
E: [email protected]
EF EF EF EF EF
1 1 1 1 2 EWH
1
50 CFM 50 CFM 50 CFM 50 CFM 100 CFM
6"X4"
6"X4" INTERMITTENT EXHAUST
6"X4" DUCT OPENINGS TO OUTSIDE
WITH BACKDRAFT/GRAVITY
6"X4" DAMPERS
6"X6"
6"X4" 6"X4" 6"X4" 6"X4" 6"X6"
EF EF EF EF EF
1 1 1 1 2 EWH
1
50 CFM 50 CFM 50 CFM 50 CFM 100 CFM
6"X4"
6"X6" INTERMITTENT EXHAUST
6"X4"
6"X4" DUCT OPENINGS TO OUTSIDE
INTERMITTENT EXHAUST WITH BACKDRAFT/GRAVITY
DUCT OPENINGS TO OUTSIDE 6"X4" 6"X4" DAMPERS
WITH BACKDRAFT/GRAVITY 6"X6"
DAMPERS 6"X4" 6"X4" 6"X4" 6"X4" 6"X6"
6"X4"
EF EF EF EF EF
1 1 1 1 2 EWH
1
50 CFM 50 CFM 50 CFM 50 CFM 100 CFM
PROJECT ADDRESS
645 PUTNAM AVENUE
BROOKLYN, NY 11221
BUILDING DATA
6"X4" 6"X6" BLOCK: 1644 LOT: 42
EF EF ZONE: R6B MAP: 17a
1 2 EWH JOB NUMBER
1
50 CFM 100 CFM B00784565-I1
APPROVAL STAMP
6"X4"
EF
1 EWH
50 CFM 1
CELLAR&FIRST FLOOR VRF RISER DIAGRAM FIRST FLOOR BEDROOMS VRF RISER DIAGRAM SECOND FLOOR LIVING VRF RISER DIAGRAM SECOND FLOOR BEDROOMS VRF RISER DIAGRAM
SCALE: N/A SCALE: N/A SCALE: N/A SCALE: N/A
PROJECT ADDRESS
645 PUTNAM AVENUE
BROOKLYN, NY 11221
BUILDING DATA
BLOCK: 1644 LOT: 42
ZONE: R6B MAP: 17a
JOB NUMBER
B00784565-I1
APPROVAL STAMP
SHEET TITLE
VRF RISER DIAGRAMS
& SCHEDULES
SEAL & SIGNATURE DRAWN BY
HH
THIRD FLOOR LIVING VRF RISER DIAGRAM THIRD FLOOR BEDROOMS VRF RISER DIAGRAM FOURTH FLOOR LIVING VRF RISER DIAGRAM FOURTH FLOOR BEDROOMS VRF RISER DIAGRAM CHECKED BY
SCALE: N/A SCALE: N/A SCALE: N/A SCALE: N/A MV
MICHAEL J. VORLAND, RA
M-202.00
NYS LICENSE: 036993 6 OF 9
SI
AS F I
System No. W-L-5029
CL
ED
TAPE SEAMS AT INSULATION C US
JOINTS NO PIPE EXPOSURE Classified by
ANSI/UL1479 (ASTM E814) CAN/ULC S115
Underwriters Laboratories, Inc.
to UL 1479 and CAN/ULC-S115 F Ratings — 1, 2 and 3 Hr (See Items 1, 3 F Ratings — 1, 2 and 3 Hr (See Items 1, 3
and 4) and 4)
T Ratings — 0, 1/2, 1 and 1-1/4 Hr (See FT Ratings — 0, 1/2, 1 and 1-1/4 Hr (See
Item 3) Item 3)
FH Ratings — 1, 2 and 3 Hr (See Items 1, 829 EAST 15 STREET
L Rating At Ambient — 4 CFM/Sq Ft BROOKLYN NY 11230
2 and 4)
POLYETHYLENE PIPE INSULATION MIN R 3 T: 718-865-9350
L Rating At 400 F — Less Than 1 CFM/Sq FTH Ratings — 0, 1/2, 1 and 1-1/4 Hr E: [email protected]
Ft (See Item 3)
HOT DOMESTIC WATER LINE
L Rating At Ambient — 4 CFM/Sq Ft
4
4 3 3
TAPE SEAMS AT INSULATION
JOINTS NO PIPE EXPOSURE
ISSUE
2 FILING SET
PIPE INSULATION MIN THICKNESS AS PER NYCECC TABLE 6.8.3.2: REVISIONS
· FOR NOMINAL SIZES 1.5" AND LESS, 0.5" THICK INSULATION
· FOR NOMINAL SIZES >1.5", 1" THICK INSULATION # DATE DESCRIPTION
REFRIGERANT LINE 2
0 09/02/22 INITIAL
1
PIPE INSULATION for refrigerant line A
SECTION A-A
5 1 09/13/22 REVISION
2 11/14/22 REVISION
1. Wall Assembly — The 1, 2 or 3 hr fire-rated gypsum board/stud wall assembly shall be constructed of the materials and in the manner specified in the individual U300, U400, V400 3 11/17/22 REVISION
or W400 Series Wall and Partition Designs in the UL Fire Resistance Directory and shall include the following construction features:
A. Studs — Wall framing may consist of either wood studs or steel channel studs. Wood studs to consist of nom 2 by 4 in. (51 by 102 mm) lumber spaced 16 in. (406 mm) OC. 4 11/21/22 REVISION
Steel studs to be min 2-1/2 in. (64 mm) wide for 1 and 2 hr F and FH rating and 3-1/2 in. (89 mm) wide for 3 hr F and FH rating and spaced max 24 in. (610 mm) OC.
B. Gypsum Board* — Min 5/8 in. (16 mm) thick with square or tapered edges. The gypsum board type, thickness, number of layers, fastener type and sheet orientation shall be as
specified in the individual Wall and Partition Design. Max diam of opening is 18-5/8 in. (473 mm).
The hourly F and FH Ratings of the firestop system are equal to the hourly fire rating of the wall assembly in which it is installed.
2. Through Penetrants — One metallic pipe or tubing to be installed within the firestop system. Pipe or tubing to be rigidly supported on both sides of wall assembly. The following
types and sizes of metallic pipes or tubing may be used:
A. Steel Pipe — Nom 12 in. (305 mm) diam (or smaller) Schedule 10 (or heavier) steel pipe.
B. Iron Pipe — Nom 12 in. (305 mm) diam (or smaller) cast or ductile iron pipe.
C. Copper Tubing — Nom 6 in. (152 mm) diam (or smaller) Type L (or heavier) copper tubing. When the hourly F or FH Rating of the firestop system is 3 hr, the nom diam of
copper tube shall not exceed 4 in. (102 mm).
D. Copper Pipe — Nom 6 in. (152 mm) diam (or smaller) Regular (or heavier) copper pipe. When the hourly F or FH Rating of the firestop system is 3 hr, the nom diam of copper
pipe shall not exceed 4 in. (102 mm).
3. Pipe Covering* — Nom 1, 1-1/2 or 2 in. (25, 38 or 51 mm) thick hollow cylindrical heavy density (min 3.5 pcf or 56 kg/m³) glass fiber units jacketed on the outside with an all service
jacket. Longitudinal joints sealed with metal fasteners or factory-applied self-sealing lap tape. Transverse joints secured with metal fasteners or with butt tape supplied with the
product. For 1 and 2 hr F and FH Ratings, the annular space between insulated penetrant and periphery of opening shall be min 0 in. (point contact) to max 1-7/8 in. (48 mm). For 3
hr F and FH Ratings, the annular space shall be min 0 in. (point contact) to max 1-1/4 in. (32 mm).
See Pipe and Equipment Covering — Materials (BRGU) category in the Building Material Directory for the names of manufacturers. Any pipe covering material meeting the above
specifications and bearing the UL Classification Marking with a Flame Spread Index of 25 or less and a Smoke Developed Index of 50 or less may be used.
The hourly T, FT, FTH Ratings of the firestop system are 1/2 hr for 1 hr rated walls and 1 hr for 2 hr rated walls. For 3 hr rated walls, the hourly T, FT and FTH Ratings when steel
and iron pipes are used are 1 hr. For 3 hr rated walls, the hourly T, FT and FTH Ratings when copper penetrants are used are 1-1/4 hr for 2 in. (51 mm) thick pipe covering and 0 hr
for pipe covering thickness less than 2 in. (51 mm).
3A. Pipe Covering* — (Not Shown) — As an alternate to Item 3, max 2 in. (51 mm) thick cylindrical calcium silicate (min 14 pcf) units sized to the outside diam of the pipe or tube may
be used. Pipe insulation secured with stainless steel bands or min 18 AWG stainless steel wire spaced max 12 in. (305 mm) OC. When the alternate pipe covering is used, the T and
FT Rating shall be as specified in item 3 above.
See Pipe and Equipment Covering — Materials (BRGU) category in the Building Materials Directory for names of manufacturers. Any pipe covering material meeting the above
specifications and bearing the UL Classification Marking with a Flame Spread Index of 25 or less and a Smoke Developed Index of 50 or less may be used.
4. Fill, Void or Cavity Material* — Sealant — For 1 and 2 hr F and FH Rating, min 5/8 in. (16 mm) thickness of fill material applied within the annulus, flush with both surfaces of wall.
For 3 hr F and FH Rating, min 1 in. (25 mm) thickness of fill material applied within the annulus, flush with both surfaces of wall. At the point contact location between pipe covering
and gypsum board, a min 1/2 in. (13 mm) diam bead of fill material shall be applied at the pipe covering/gypsum board interface on both surfaces of wall.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-One Sealant or FS-ONE MAX Intumescent Sealant
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
PROJECT ADDRESS
645 PUTNAM AVENUE
BROOKLYN, NY 11221
BUILDING DATA
BLOCK: 1644 LOT: 42
ZONE: R6B MAP: 17a
JOB NUMBER
B00784565-I1
APPROVAL STAMP
SHEET TITLE
DETAILS
MICHAEL J. VORLAND, RA
M-301.00
NYS LICENSE: 036993 7 OF 9
TABLE II - PROGRESS INSPECTION FOR ENERGY CODE COMPLIANCE -
PROFESSIONAL ENERGY COMPLIANCE STATEMENTS COMMERCIAL OR MULTIPLE-DWELLING BUILDINGS (ECC C2- C6 OR ASHRAE 90.1)
1 TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THESE PLANS AND SPECIFICATIONS ARE IN COMPLIANCE WITH THE 2020 NEW YORK CITY ENERGY CONSERVATION
CODE, COMMERCIAL ENERGY EFFICIENCY USING CHAPTER C4. REFERENCE STANDARD (SEE ECC CHAPTER C6) ECC OR OTHER
2 THIS PROJECT DOES NOT REQUIRE COMMISSIONING AS REQUIRED FOR APPLICATION AS PER C408. Y N INSPECTION / TEST PERIODIC (MINIMUM) OR OTHER CRITERIA CITATION
3 CALCULATION FOR THE HEATING AND COOLING DESIGN LOADS ARE PROVIDED IN COMPLIANCE WITH ANSI/ASHRAE/ACCA STANDARD 183. IIA ENVELOPE INSPECTIONS
♦ PROTECTION OF EXPOSED FOUNDATION INSULATION: INSULATION MUST BE VISUALLY INSPECTED TO VERIFY PROPER PROTECTION WHERE APPLIED TO THE AS REQUIRED DURING FOUNDATION WORK C303.2.1; ASHRAE 90.1 -
IIA1 APPROVED CONSTRUCTION DOCUMENTS, ASTM C272
EXTERIOR OF BASEMENT OR CELLAR WALLS, CRAWEL-SPACE WALLS AND/OR THE PERIMETER OF SLAB-ON-GRADE FLOORS AND PRIOR TO BACKFILL 5.8.1.5.9 829 EAST 15 STREET
BROOKLYN NY 11230
♦ INSULATION PLACEMENT AND R-VALUES: INSTALLED INSULATION FOR EACH COMPONENT OF THE CONDITIONED SPACE ENVELOPE AND AT JUNCTIONS BETWEEN C303.1, C303.2, C402.1,
AS REQUIRED TO VERIFY CONTINUOUS T: 718-865-9350
COMPONENTS, INCLUDING THERMAL BRIDGES AND HEATED SLAB INSULATION, MUST BE VISUALLY INSPECTED TO ENSURE THAT THE R-VALUES ARE MARKED, THAT C402.2; C402.6, C406; ASHRAE
COMMISSIONING REQUIREMENTS IIA2
SUCH R-VALUES CONFORM TO THE R-VALUES IDENTIFIED IN THE CONSTRUCTION DOCUMENTS AND THAT THE INSULATION IS PROPERLY INSTALLED.
ENCLOSURE WHILE WALLS, CEILINGS AND
FLOOR ARE OPEN
APPROVED CONSTRUCTION DOCUMENTS,
90.1 - 5.5, 5.6, 5.8, 5.9, 11 OR
E: [email protected]
CERTIFICATIONS FOR UNMARKED INSULATION ALSO BE VISUALLY INSPECTED. APPENDIX G, APPENDIX I
HEATING COOLING ♦ C303.1, C303.1.3,C402.1.4,
TYPE TOTAL HEATING TOTAL COOLING FENESTRATION AND DOOR U-FACTOR AND PRODUCT RATINGS: U-FACTORS, SHGC AND VT VALUES OF INSTALLED FNESTRATION MUST BE VISUALLY INSPECTED FOR
EQUIPMENT CAPACITY CAPACITY QUANTITY APPROVED CONSTRUCTION DOCUMENTS; NFRC 100, NFRC 200, C402.4; 406; ASHRAE 90.1 -
MARK (BTUH) (BTUH) IIA3 CONFORMANCE WITH THE U-FACTORS, SHGC AND VT VALUES IDENTIEDIED IN THE CONSTRUCTION DRAWINGS BY VERIFYING THE MANUFACTURER'S NFRC LABELS AS REQUIRED DURING INSTALLATION
NFRC 300, ANSI/DASMA 105, ASTM E972 5.4.2,5.5; 5.6, 5.8.2, 5.9, 11 OR
(BTUH) (BTUH) OR WHERE NOT LABELED, USING THE RATINGS IN ECC TABLES C303.1.3(1), (2) AND (3).
APPENDIX G, APPENDING I
HP-36 VRF SYSTEM 36,000 BTUH 36,000 BTUH 8 288,000 BTUH 288,000 BTUH
♦ FENESTRATION AIR LEAKAGE: WINDOWS AND DOOR ASSEMBLIES, EXCEPT SITE-BUILT WINDOWS AND/OR DOORS, MUST BE VISUALLY INSPECTED TO VERIFY THAT
HWH ELECTRIC HOT WATER HEATER 15,355 BTUH N/A 4 61,420 BTUH N/A INSTALLED ASSEMBLIES ARE LSITED AND LABELED BY THE MANUFACTURER TO THE REFERENCE STANDARD.
AS REQUIRED DURING INSTALLATION; PRIOR NFRC 400, AAMA/WDMA/CSA 101/I.S.2/A440; ASTM E283; C402.5.2, C402.5.6; ASHRAE
IIA4 90.1 - 5.4.3.2, 5.4.3.3, 5.8.2, 5.9
TOTAL 349,420 BTUH 288,000 BTUH FOR CURTAIN WALL, STOREFRONT GLAZING, COMMERCIAL ENTRANCE DOORS AND REVOLVING DOORS, THE TESTING REPORTS MUST BE REVIEWED TO VERIFY TO FINAL CONSTRUCTION INSPECTION ANSI/DASMA 105
THAT THE INSTALLED ASSEMBLY COMPLIES WITH THE STANDARD CITED IN THE APPROVED PLANS.
1. WHEN TOTAL COOLING IS LESS THAN 480,000 BTU/H AND TOTAL SPACE HEATING AND SERVICE WATER HEATING IS LESS THAN 600,000 BTU/H, COMMISSIONING IS NOT REQUIRED AS PER C408. WEATHERSEALS AT LOADING DOCKS MUST BE VISUALLY VARIFIED.
2. ECONOMIZERS ARE NOT REQUIRED AS PER C403.5.
♦ C402.4; ASHRAE 90.1 -5.4,
IIA5 FENESTRATION AREAS: DIMENSIONS OF WINDOWS, DOORS AND SKYLIGHTS MUST BE VERIFIED BY VISUAL INSPECTION. PRIOR TO FINAL CONSTRUCTION INSPECTION APPROVED CONSTRUCTION DOCUMENTS 5.5.4, 5.6, 5.9 11 OR APPENDIX
G ISSUE
♦ AIR BARRIER VISUAL INSPECTION: OPENINGS AND PENETRATIONS IN THE BUILDING ENVELOPE, INCLUDING SITE-BUILTS FENESTRATION AND DOORS, MUST BE FILING SET
VISUALLY INSPECTED TO VERIFY THAT A CONTINUOUS AIR BARRIER AROUND THE ENVELOPE FORMS AN AIR-TIGHT ENCLOSURE.
APPROVED CONSTRUCTION DOCUMENTS; ASTM E2178, ASTM C402.5; ASHRAE 90.1 - 5.4.3.1, REVISIONS
IIA6 THE PROGRESS INSPECTOR MUST VISUALLY INSPECT TO VERIFY THAT MATERIALS AND/OR ASSEMBLIES HAVE BEEN TESTED AND MEET THE REQUIREMENTS O FTHE AS REQUIRED DURING CONSTRUCTION E2357, ASTM E1677, ASTM E779, ASTM E283 5.4.3.5, 5.9
RESPECTIVE STANDARDS, OR MUST OBSERVE THE TESTING OF THE BUILDING AND/OR ASSEMBLIES AND VERIFY THAT THE BUILDING AND/OR ASSEMBLIES MEET THE
REQUIREMENTS OF THE STANDARD, IN ACCORDANCE WITH THE STANDARD(S) CITED IN THE APPROVED PLANS. # DATE DESCRIPTION
♦ AIR BARRIER TESTING: TESTING MUST BE PERFORMED IN ACCORDANCE WITH SECTION ECC C402.5.1.3.1 OR ASHRAE 90.1 SECTION 5.4.3.1.3, AND SHALL BE 0 09/02/22 INITIAL
APPROVED CONSTRUCTION DOCUMENTS; ASTM E 779, C402.5, C402.5.1.3, C406;
ACCEPTED IF THE BUILDING MEETS THE REQUIREMENTS DETAILED IN SUCH SECTION. TEST RESULTS SHALL BE RETAINED IN ACCORDANCE WITH THE PROVISIONS OF AS REQUIRED DURING CONSTRUCTION, OR
IIA7
TITIE 28 OF THE ADMINISTRATIVE CODE. TESTING MUST BE PERFORMED BY A THIRD-PARTY INDEPENDENT OF THE CONTRACTOR AND ACCEPTABLE TO THE PRIOR TO FINAL CONSTRUCTION INSPECTION ANSI/BOMA Z65.1, ASTM E3158, RESNET/ICC 380 ASHRAE 90.1 - 5.4.3.1.3, 5.9, 1 09/13/22 REVISION
APPENDIX I
DEPARTMENT.
2 11/14/22 REVISION
♦ AIR BARRIER CONTINUITY PLAN TESTING: EACH UNIQUE AIR BARRIER JIONT OR SEAM MUST BE TESTED OR INSPECTED FOR COMPLIANCE. DOCUMENTATION
INCLUDES THE METHOD OF TEST PERFORMED ON EACH UNIQUE AIR BARRIER JOINT OR SEAM AND THE RESULTS OF THE TEST. IF AN AIR BARRIER JOINT OR SEAM APPROVED CONSTRUCTION DOCUMENTS; ASTM E779, ASTM C402.5.1.3; ASHRAE 90.1 - 3 11/17/22 REVISION
IIA8 HAS A DEFICIENCY, THE DEFICIENCY MUST BE NOTED, AND TESTED UNTIL IT COMPLIES WITH THE TESTING REQUIREMENTS. TEST RESULTS MUST BE RETAINED IN AS REQUIRED DURING INSTRUCTION
E1186, ASTM E2813, ASTM E3158 5.4.3.1.3, 5.9
ACCORDANCE WITH THE PROVISION OF TITLE 28 OF THE ADMINISTRATIVE CODE. 4 11/21/22 REVISION
TESTING MUST BE PERFORMED BY A THIRD-PARTY INDEPENDENT OF THE CONTRACTOR AND ACCEPTABLE TO THE DEPARTMENT.
♦ C402.5.7; ASHRAE 90.1 -
IIA9 VESTIBULES: REQUIRED ENTRANCE VESTIBULES MUST BE VISUALLY INSPECTED FOR PROPER OPERATION. PRIOR TO FINAL CONSTRUCTION INSPECTION APPROVED CONSTRUCTION DOCUMENTS
5.4.3.4
IIB MECHANICAL AND SERVICE WATER HEATING INSPECTIONS
♦ C402.2.8; BC 2111; MC
IIB1 FIREPLACES: PROVISION OF COMBUSTION AIR AND TIGHT-FITTING FIREPLACE DOORS MUST BE VERIFIED BY VISUAL INSPECTION. PRIOR TO FINAL CONSTRUCTION INSPECTION APPROVED CONSTRUCTION DOCUMENTS; UL 127 CHAPTERS 7, 8, 9; FGC
CHAPTER 6
♦ SHUTOFF DAMPERS: DAMPERS FOR STAIR AND ELEVATOR SHAFT VENTS AND OTHER OUTDOOR AIR INTAKES AND EXHAUST OPENINGS INTEGRAL TO THE BUILDING
ENVELOPE MUST BE VISUALLY INSPECTED TO VERIFY THAT SUCH DAMPERS, EXCEPT WHERE PERMITTED TO BE GRAVITY DAMPERS, COMPLY WITH APPROVED
AS REQUIRED DURING INSTALLATION APPROVED CONSTRUCTION DOCUMENTS; AMCA 500D C402.5.5, C403.7.7; ASHRAE
IIB2 CONSTRUCTION DRAWINGS.
90.1 - 6.4.3.4
MANUFACTURER'S LITERATURE MUST BE REVIEWED TO VERIFY THAT THE PRODUCT HAS BEEN TESTED AND FOUND TO MEET THE STANDARD.
♦ HVAC-R, COMMERCIAL KITHEN EQUIPMENT, AND SERVICE WATER HEATING EQUIPMENT: EQUIPMENT SIZING, EFFICIENCIES, PIPE SIZING AND OTHER C403.1, C403.2, C403.3
PERFORMANCE FACTORS OF ALL MAJOR EQUIPMENT UNITS, AS DETERMINED BY THE APPLICANT OF RECORD, AND NO LESS THAN 15% OF MINOR EQUIPMENT C403.7.5, C404.2, C404.5,
PRIOR TO FINAL PLUMBING AND APPROVED CONSTRUCTION DOCUMENTS, ASHRAE 183, ASHRAE
IIB3 UNITS, MUST BE VERIFIED BY VISUAL INSPECTION AND, WHERE NECESSARY, REVIEW OF MANUFACTURER'S DATA. C404.9, C405.10, C406;
CONSTRUCTION INSPECTION HVAC SYSTEMS AND EQUIPMENT HANDBOOK
ASHRAE 90.1 - 6.3, 6.4, 6.5, 6.7,
POOL HEATERS AND COVERS MUST BE VERIFIED BY VISUAL INSPECTION. 7.4, 7.5, 7.8, 10.4.6, APPENDIX I
♦ HVAC-R AND SERVICE WATER HEATING SYSTEM CONTROLS: NO LESS THATN 20% OF EACH TYPE OF REQUIRED CONTROLS AND ECONOMIZERS MUST BE VERIFIED BY
VISUAL INSPECTION AND TESTED FOR FUNCTIONALITY AND PROPER OPERATION. SUCH CONTROLS MUST INCLUDE, BUT ARE NOT LIMITED TO:
- THERMOSTATIC
- OFF-HOUR
- ZONES
- FREEZE PROTECTION/SNOW - AND ICE-MELT SYSTEM
- VENTILATION SYSTEM AND FAN CONTROLS
- ENERGY RECOVERY SYSTEMS
- KITCHEN/LAB EXHAUST SYSTEMS
- FAN SYSTEMS SERVING SINGLE AND MULTIPLE ZONES
- OUTDOOR HEATING SYSTEMS
- HVAC CONTROL IN HOTEL/MOTEL GUEST ROOMS
- AIR/WATER ECONOMIZERS & CONTROLS
- HYDRONIC SYSTEMS AFTER INSTALLATION AND PRIOR TO FINAL
- HEAT REJECTION SYSTEMS ELECTRICAL AND CONSTRUCTION INSPECTION,
- HOT GAS BYPASS LIMITATION EXCEPT THAT FOR CONTROLS WITH APPROVED CONSTRUCTION DOCUMENTS, INCLUDING CONTROL C403, C404, C406; ASHRAE
IIB4 - REFRIGERATION SYSTEMS SEASONALLY DEPENDENT FUNCTIONALITY, SYSTEM NARRATIVES; ASHRAE GUIDELINE 1: THE HVAC 90.1 - 6.3, 6.4, 6.5, 6.6, 7.4, 7.5,
- DOOR SWITCHES SUCH TESTING MUST BE PERFORMED BEFORE COMMISSIONING PROCESS WHERE APPLICABLE APPENDIX I
- COMPUTER ROOM SYSTEMS SIGNOFF FOR ISSUANCE OF A FINAL
- SERVICE WATER HEATING SYSTEMS CERTIFICATE OF OCCUPANCY
- POOL HEATER AND TIME SWITCHES
CONTROLS WITH SEASONALLY DEPENDENT FUNCTIONALITY: CONTROLS SHOSE COMPLETE OPERATION CONNOT BE DEMONSTRATED DUE TO PREVAILING WEATHER PROJECT ADDRESS
CONDITIONS TYPICAL OF THE SEASON DURING WHICH PROGRESS INSPECTIONS WILL BE PERFORMED SHALL BE PERMITTED TO BE SIGNED OFF FOR THE PURPOSE OF
A TERMPORARY CERTIFICATE OF OCCUNPANCY WITH ONLY A VISUAL INSPECTION, PROVIDED, HOWEVER, THAT THE PROGRESS INSPECTOR MUST PERFORM A
645 PUTNAM AVENUE
SUPPLEMENTAL INSPECTION WHERE THE CONTROLS ARE VISUALLY INSPECTED AND TESTED FOR FUNCTIONALITY AND PROPER OPERATION DURING THE NEXT
IOMMEDIATE SEASON THEREAFTER.
BROOKLYN, NY 11221
THE OWNER MUST PROVIDE FULL ACCESS TO THE PROGRESS INSPECTOR WITHIN TWO WEEKS OF THE PROGRESS INSPECTOR'S REQUEST FOR SUCH ACCESS TO BUILDING DATA
PERFORM THE PROGRESS INSPECTION.
BLOCK: 1644 LOT: 42
FOR SUCH SUPPLEMENTAL INSPECTIONS, THE DEPARTMENT MUST BE NOTIFIED BY THE APPROVED PROGRESS INSPECTION AGENCY OF ANY UNRESOLVED
DEFICIENCIES IN THE INSTALLED WORK WITHIN 180 DAYS OF SUCH SUPPLEMENTAL INSPECTION. ZONE: R6B MAP: 17a
♦ HVAC-R AND SERVICE WATER PIPING DESIGN AND INSULATION: INSTALLED PIPING INSULATION MUST BE VISUALLY INSPECTED TO VERIFY PROPER INSULATION JOB NUMBER
C403.11, C404.4, C404.5; MC
PLACEMENT AND VALUES. AFTER INSTALLATION AND PRIOR TO CLOSING
IIB5 APPROVED CONSTRUCTION DOCUMENTS; 603.9; ASHRAE 90.1 - 6.3, 6.4.4,
SERVICE HOT WATER DISTRIBUTION SYSTEMS MUST BE INSPECTED TO VERIFY THE SUPPLY OF HEATED WATER.
SHAFTS, CEILINGS AND WALLS
6.8.2, 6.8.3; 7.4.3
B00784565-I1
♦ DUCT LEAKAGE TESTING, INSULATION AND DESIGN: FOR DUCT SYSTEMS DESIGNED TO OPERATEAT STATIC PRESSURES IN EXCESS OF 3 INCHES W.G. (747 PA),
REPRESENTATIVE SECTIONS, AS DETERMINED BY THE PROGRESS INSPECTOR, TOTALING AT LEAST 25% OF THE DUCT AREA, MUST BE TESTED TO VERIFYTHAT APPROVED CONSTRUCTION DOCUMENTS; SMACNA HVAC AIR
AFTER INSTALLATION AND DEALING AND PRIOR DUCT LEAKAGE TEST MANUAL C403.11; ASHRAE 90.1 - APPROVAL STAMP
IIB6 ACTUAL AIR LEAKAGE IS BELOW ALLOWABLE AMOUNTS. TO CLOSING SHAFTS, CEILING AND WALLS
INSTULLED DUCT INSULATION MUST BE VISUALLY INSPECTED TO VERIFY PROPER INSULATION PLACEMENT AND VALUES. SMACNA DUCT CONCTRUCTION STANDARDS, METAL AND 6.4.4.2.2
JOINTS, LONGITUDINAL AND TRANSVERSE SEAMS AND CONNECTIONS IN DUCT WORK MUST BE VISUALLY INSPECTED FOR PROPER SEALING. FLEXIBLE
MUST BE VERIFIED BY VISUAL INSPECTION AND TESTED FOR FUNCTIONALITY AND PROPER OPERATION.
HH
CHECKED BY
♦ ELECTRIC MOTORS AND ELEVATORS: WHERE QUIRED BY THE CONSTRUCTION DOCUMENTS FOR ENERGY CODE COMPLIANCE, MOTOR LISTING OR LABELS BE C403.8, C405.6, C405.7,
PRIOR TO FINAL ELECTRICAL AND
IIC6 VISUALLY INSPECTED TO VERIFY THAT THEY COMPLY WITH THE RESPECTIVE ENERGY REQUIREMENTS IN THE CONSTRUCTION DOCUMENTS.
CONSTRUCTION INSPECTION
APPROVED CONSTRUCTION AND DOCUMENTS C405.8, C405.9; ASHRAE 90.1 - MV
ELEVATORS AND ESCALATORS MUST BE INSPECTED FOR COMPLIANCE WITH REGENERATIVE DRIVE REQUIREMENTS. 8.4.4, 10.4, 10.8
IID OTHER
♦ APPROVED CONSTRUCTION AND DOCUMENTS, INCLUDING C408.1.1, C408.2.5.2, C408.3.2;
MAINTENANCE INFORMATION: MAINTENANCE MANUALS FOR MECHANICAL, SERVICE HOT WATER AND ELECTRICAL EQUIPMENT AND SYSTEMS REQUIRING
PREVENTIVE MAINTENANCE MUST BE REVIEWED FOR APPLICABILITY TO INSTALLED EQUIPMENT AND SYSTEMS BEFORE SUCH MANUALS ARE PROVIDED TO THE PRIOR TO SIGNOFF OR ISSUANCE OF FINAL ELECTRICAL DRAWINGS WHERE APPLICABLE; ASHRAE GUIDELINE ASHRAE 90.1 - 4.2.2.3, 6.7.2.2,
IID1
OWNER. LABELS REQUIRED FOR SUCH EQUIPMETN OR SYSTEMS MUST BE INSPECTED FOR ACCURACY AND COMPLETENESS. CERTIFICATE OF OCCUPANCY 4: PREPARATION OF OPERATING AND MAINTENANCE 6.7.2.3.5.2, 8.7.2, 9.7.2.2,
DOCUMENTATION FOR BUILDING SYSTEMS 9.4.3.2.2
MICHAEL J. VORLAND, RA
EN-001.00
NYS LICENSE: 036993 8 OF 9
829 EAST 15 STREET
BROOKLYN NY 11230
T: 718-865-9350
E: [email protected]
ISSUE
FILING SET
REVISIONS
# DATE DESCRIPTION
0 09/02/22 INITIAL
1 09/13/22 REVISION
2 11/14/22 REVISION
3 11/17/22 REVISION
4 11/21/22 REVISION
PROJECT ADDRESS
645 PUTNAM AVENUE
BROOKLYN, NY 11221
BUILDING DATA
BLOCK: 1644 LOT: 42
ZONE: R6B MAP: 17a
JOB NUMBER
B00784565-I1
APPROVAL STAMP
SHEET TITLE
COMCHECK
MECHANICAL ENERGY
COMPLIANCE REPORT
SEAL & SIGNATURE DRAWN BY
HH
CHECKED BY
MV
MICHAEL J. VORLAND, RA
EN-101.00
NYS LICENSE: 036993 9 OF 9