Checklist Premove

The document provides a checklist of tasks to complete before moving a rig. It includes checking the boat landing, water supply, and obstacles on decks. Verifying diverter lines are clear of obstacles and their length. Ensuring emergency systems like ESD, generators, and fuel tanks are ready. Plugging any wells. Reviewing documents like route plans, anchor patterns, facility positions, and tide predictions. Holding pre-move meetings to coordinate activities like personnel assignments, equipment needs, and depressurizing pipelines. Notifying relevant parties and preparing authorization to restart production.

Uploaded by

Marc Lefrancq
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Checklist Premove

The document provides a checklist of tasks to complete before moving a rig. It includes checking the boat landing, water supply, and obstacles on decks. Verifying diverter lines are clear of obstacles and their length. Ensuring emergency systems like ESD, generators, and fuel tanks are ready. Plugging any wells. Reviewing documents like route plans, anchor patterns, facility positions, and tide predictions. Holding pre-move meetings to coordinate activities like personnel assignments, equipment needs, and depressurizing pipelines. Notifying relevant parties and preparing authorization to restart production.

Uploaded by

Marc Lefrancq
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CHECKLIST PREMOVE PREPARATION

Platform Visit AUDIT CR 422


Sindhu Check boat landing
FO BPN + FO RSES Check water supply
Supt + Engineer Check obstacles all decks
Drilling Contractor Diverter lines obstacles and length
CWO ESD/Generator/Fuel tank
WLI Wells to plug ( AC ???? )
Derogations shutdown platform after 1/3
Shallow gas
Simops Dossier Sindhu
Simops General Agus
Documents Route
Side view
Anchor pattern
Fugro analysis
Raw datas
Spud cans analysis
Facilities position
Proposed leg position
Crane position
Anchors handler tech spec
Debris survey ( 2 weeks before )
Tide Prediction
Marine JRA
Before rig move Backdown buoy Check with C.Man when ?
Fuel to take before Same
Premove Meeting SUPT Rig situation When boats on location :
TOPO Platform status
FO Boats selection when in POSB- Drilling Contractors to check ? Where ?
TEPI MARINE Mail to send to POSB and all rigs that these 3 boats will be busy
WLI Topo equipment and people Personnel :1 on each boat + 3 on rig When ? Where?
Drilling Contractor How many TEPI marine Personnel : 2 When ? Where : Rig
IT ( Primacom ) captain coverage 24 hours/day
How many Drilling Contractors
Backdown buoy When to take out : Temporary location :
JRA Marine
Depressurization of platform/pipelines Check timing for depressurization
Debris survey

SUPT Mail to send to POSB and all rigs that these 3 boats will be busy
Rig move procedures to have signed by all parties
Loading list to prepare and send
FO Site Authority Names
( Senipah/SPU ) Office Phone
Mobile Phones
FO Balikpapan

Authorization to re-start production


Presimops visit
prespud meeting