This document provides information about X20(c)BC0083 bus controllers: 1. The bus controller connects X2X Link I/O nodes to the POWERLINK network and can operate the X2X Link synchronously to POWERLINK. Coated modules are protected from condensation and corrosive gases. 2. Technical data includes order numbers, certifications, interfaces, transfer properties, and operating conditions. 3. Additional documents provide supplementary information on the X20 system user manual, installation guide, and EMC guide.

Uploaded by

dalitso ngoma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views6 pages

X20bc0083-Eng V2.40

This document provides information about X20(c)BC0083 bus controllers: 1. The bus controller connects X2X Link I/O nodes to the POWERLINK network and can operate the X2X Link synchronously to POWERLINK. Coated modules are protected from condensation and corrosive gases. 2. Technical data includes order numbers, certifications, interfaces, transfer properties, and operating conditions. 3. Additional documents provide supplementary information on the X20 system user manual, installation guide, and EMC guide.

Uploaded by

dalitso ngoma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

X20(c)BC0083

X20(c)BC0083

1 General information
The bus controller makes it possible to connect X2X Link I/O nodes to POWERLINK. It is also possible to operate
the X2X Link cycle synchronously 1:1 or synchronous to POWERLINK using a prescaler.
POWERLINK is a standard protocol for Fast Ethernet with hard real-time characteristics. The POWER-
LINK Standardization Group (EPSG) ensures that the standard remains open and is continually developed:
www.ethernet-powerlink.org.
• POWERLINK
• I/O configuration and firmware update via the fieldbus
• Integrated hub for economical wiring

1.1 Coated modules

Coated modules are X20 modules with a protective coating for the electronics component. This coating protects
X20c modules from condensation and corrosive gases.
The modules' electronics are fully compatible with the corresponding X20 modules.
For simplification purposes, only images and module IDs of uncoated modules are used in this data
sheet.
The coating has been certified according to the following standards:
• Condensation: BMW GS 95011-4, 2x 1 cycle
• Corrosive gas: EN 60068-2-60, method 4, exposure 21 days

1.1.1 Starting temperature

The starting temperature describes the minimum permissible ambient temperature in a voltage-free state at the
time the coated module is switched on. This is permitted to be as low as -40°C. During operation, the conditions
as specified in the technical data continue to apply.

Information:
It is important to absolutely ensure that there is no forced cooling by air currents in the closed control
cabinet, e.g. due to the use of a fan or ventilation slots.

1.2 Other applicable documents

For additional and supplementary information, see the following documents.

Other applicable documents


Document name Title
MAX20 X20 system user's manual
MAEMV Installation / EMC guide

Data sheet V 2.40 1


X20(c)BC0083

2 Order data
Order number Short description Figure
Bus controllers
X20BC0083 X20 bus controller, 1 POWERLINK interface, integrated 2-port
hub, 2x RJ45, order bus base, power supply module and termi-
nal block separately!
X20cBC0083 X20 bus controller, coated, 1 POWERLINK interface, integrated
2-port hub, 2x RJ45, order bus base, power supply module and
terminal block separately!
Required accessories
System modules for bus controllers
X20BB80 X20 bus base, for X20 base module (BC, HB, etc.) and X20
power supply module, X20 end cover plates (left and right)
X20AC0SL1/X20AC0SR1 included
X20PS9400 X20 power supply module, for bus controller and internal I/O
power supply X2X Link power supply
X20PS9402 X20 power supply module, for bus controller and internal I/O
power supply, X2X Link supply, supply not galvanically isolated
X20cBB80 X20 bus base, coated, for X20 base module (BC, HB, etc.) and
X20 power supply module, X20 end cover plates (left and right)
X20AC0SL1/X20AC0SR1 included
X20cPS9400 X20 power supply module, coated, for bus controller and internal
I/O power supply X2X Link power supply
Terminal blocks
X20TB12 X20 terminal block, 12-pin, 24 VDC keyed

Table 1: X20BC0083, X20cBC0083 - Order data

3 Technical description
3.1 Technical data
Order number X20BC0083 X20cBC0083
Short description
Bus controller POWERLINK (V1/V2) controlled node
General information
B&R ID code 0x1F1E 0xE216
Status indicators Module status, bus function
Diagnostics
Module status Yes, using LED status indicator and software
Bus function Yes, using LED status indicator and software
Power consumption
Bus 2W
Additional power dissipation caused by actuators -
(resistive) [W]
Certifications
CE Yes
UKCA Yes
ATEX Zone 2, II 3G Ex nA nC IIA T5 Gc
IP20, Ta (see X20 user's manual)
FTZÚ 09 ATEX 0083X
UL cULus E115267
Industrial control equipment
HazLoc cCSAus 244665
Process control equipment
for hazardous locations
Class I, Division 2, Groups ABCD, T5
DNV Temperature: B (0 - 55°C)
Humidity: B (up to 100%)
Vibration: B (4 g)
EMC: B (bridge and open deck)
LR ENV1
KR Yes
ABS Yes
EAC Yes
KC Yes -
Interfaces
Fieldbus POWERLINK (V1/V2) controlled node
Type Type 2 1)
Variant 2x shielded RJ45 (hub)
Line length Max. 100 m between 2 stations (segment length)
Transfer rate 100 Mbit/s

Table 2: X20BC0083, X20cBC0083 - Technical data

2 Data sheet V 2.40


X20(c)BC0083
Order number X20BC0083 X20cBC0083
Transfer
Physical layer 100BASE-TX
Half-duplex Yes
Full-duplex No
Autonegotiation Yes
Auto-MDI/MDIX Yes
Hub propagation delay 0.96 to 1 µs
Min. cycle time 2)
Fieldbus 200 μs
X2X Link 200 μs
Synchronization between bus systems possible Yes
Electrical properties
Electrical isolation POWERLINK isolated from bus and I/O
Operating conditions
Mounting orientation
Horizontal Yes
Vertical Yes
Installation elevation above sea level
0 to 2000 m No limitation
>2000 m Reduction of ambient temperature by 0.5°C per 100 m
Degree of protection per EN 60529 IP20
Ambient conditions
Temperature
Operation
Horizontal mounting orientation -25 to 60°C
Vertical mounting orientation -25 to 50°C
Derating -
Starting temperature - Yes, -40°C
Storage -40 to 85°C
Transport -40 to 85°C
Relative humidity
Operation 5 to 95%, non-condensing Up to 100%, condensing
Storage 5 to 95%, non-condensing
Transport 5 to 95%, non-condensing
Mechanical properties
Note Order 1x terminal block X20TB12 separately. Order 1x terminal block X20TB12 separately.
Order 1x power supply module Order 1x power supply mod-
X20PS9400 or X20PS9402 separately. ule X20cPS9400 separately.
Order 1x bus base X20BB80 separately. Order 1x bus base X20cBB80 separately.
Pitch 3) 37.5+0.2 mm

Table 2: X20BC0083, X20cBC0083 - Technical data


1) For additional information, see section "Communication / POWERLINK / General information / Hardware - CN" in Automation Help.
2) The minimum cycle time specifies how far the bus cycle can be reduced without communication errors occurring.
3) Pitch is based on the width of bus base X20BB80. In addition, power supply module X20PS9400 or X20PS9402 is always required for the bus controller.

3.2 Operating and connection elements

1 POWERLINK connection with 2x RJ45 for simple wiring 2 Node number switches
3 LED status indicators 4 Terminal block for bus controller and I/O supply

Data sheet V 2.40 3


X20(c)BC0083

3.2.1 LED status indicators

Figure LED Color Status Description


S/E1) Green Off No power supply or mode NOT_ACTIVE.
The controlled node (CN) is either not supplied with power or it is in state
NOT_ACTIVE. The CN waits in this state for about 5 s after a restart. Communi-
cation is not possible with the CN. If no POWERLINK communication is detected
during these 5 s, the CN changes to state BASIC_ETHERNET (flickering).
If POWERLINK communication is detected before this time expires, however,
the CN immediately changes to state PRE_OPERATIONAL_1.
Flickering Mode BASIC_ETHERNET.
The CN has not detected any POWERLINK communication. In this state, it is
possible to communicate directly with the CN (e.g. with UDP, IP).
If POWERLINK communication is detected in this state, the CN changes to state
PRE_OPERATIONAL_1.
Single flash Mode PRE_OPERATIONAL_1.
When operating on a POWERLINK V1 manager, the CN immediately changes
to state PRE_OPERATIONAL_2.
When operating on a POWERLINK V2 manager, the CN waits until an SoC frame
is received and then changes to state PRE_OPERATIONAL_2.
Double flash Mode PRE_OPERATIONAL_2.
The CN is normally configured by the manager in this state. It is then switched to
state READY_TO_OPERATE by command (POWERLINK V2) or by setting flag
"Data valid" in the output data (POWERLINK V1).
Triple flash Mode READY_TO_OPERATE.
In a POWERLINK V1 network, the CN switches to state OPERATIONAL auto-
matically as soon as input data is present.
In a POWERLINK V2 network, the manager switches to state OPERATIONAL
by command.
On Mode OPERATIONAL.
PDO mapping is active, and cyclic data is evaluated.
Blinking Mode STOPPED.
Output data is not being output, and no input data is being provided. It is only
possible to switch to or leave this state after the manager has given the appro-
priate command.
Red On The controlled node (CN) is in an error state (failed Ethernet frames, increased
number of collisions on the network, etc.).
If an error occurs in the following states, the red LED is superimposed by the
green flashing LED:
• PRE_OPERATIONAL_1
• PRE_OPERATIONAL_2
• READY_TO_OPERATE
Status
green
t
Error
red
t
LED "S/E"

t
Note:
• Several red blinking signals are displayed immediately after the device
is switched on. This is not an error, however.
• The LED is lit red for CNs with configured physical node number 0 but that
have not yet been assigned a node number via dynamic node allocation
(DNA).
L/A IFx Green On The link to the remote station is established.
Blinking The link to the remote station is established, and Ethernet activity is taking place
on the bus.
1) The Status/Error LED "S/E" is a green/red dual LED.

LED status indicators - Blink times

Triple flash
200 200 200 200 200 1000

Double flash
200 200 200 1000

Single flash
200 1000

Blinking
200 200

Flickering
All times in ms

4 Data sheet V 2.40


X20(c)BC0083

System stop error codes


A system stop error can occur due to incorrect configuration or defective hardware.
The error code is indicated by LED "S/E" blinking red. The blinking signal of the error code consists of 4 switch-on
phases with short (150 ms) or long (600 ms) duration. The error code is repeated every 2 seconds.

RAM error

150 300 150 300 150 300 600 2000

Hardware error

600 300 150 300 150 300 600 2000 All times in ms

Error Error description


RAM error The device is defective and must be replaced.
Hardware error The device or a system component is defective and must be replaced.

3.2.2 POWERLINK node number

The node number for the POWERLINK node is set using the two number switches.
Switch position Description
0x00 Only permitted when operating the POWERLINK node in DNA mode.
0x01 - 0xEF Node number of the POWERLINK node. Operation as a controlled node (CN).
0xF0 - 0xFF Reserved, switch position not permitted.

3.2.3 Ethernet interface

For information about wiring X20 modules with an Ethernet interface, see section "Mechanical and electrical con-
figuration - Wiring guidelines for X20 modules with Ethernet cables" in the X20 user's manual.

IF1

IF2

Interface Pinout
Pin Ethernet
1 RXD Receive data
2 RXD\ Receive data\
1
3 TXD Transmit data
4 Termination
5 Termination
6 TXD\ Transmit data\
Shielded RJ45 7 Termination
8 Termination

Data sheet V 2.40 5


X20(c)BC0083

3.3 Dynamic node allocation (DNA)

Most POWERLINK bus controllers have the ability to dynamically assign node numbers. This has the following
advantages:
• No setting of the node number switch
• Easier installation
• Reduced error sources
For information regarding configuration as well as an example, see Automation Help → Communication → POW-
ERLINK → General information → Dynamic node allocation (DNA)

3.4 SG3

This module is not supported on SG3 target systems.

3.5 SG4

The module comes with preinstalled firmware. The firmware is also part of the Automation Runtime operating
system for the PLC. With different versions, the Automation Runtime firmware is loaded onto the module.
The latest firmware is made available automatically when updating Automation Runtime.

6 Data sheet V 2.40