ESTIMATE
Major Head :-
Service Head :-
Departmental Head :-
ESTIMATE FRAMED IN THE OFFICE OF THE EXECUTIVE ENGINEER, P.M.G.S.Y M.R.R.D.A. DIVISION, GADCHIROLI FOR
THE PROBABLE EXPENSES THAT WILL BE INCURED IN CONSYRUCTION OF SUBMERSIBLE IN KM 4/200 ON MARPALLI -
REGULWAHI ROAD, IN ETAPALLI TALUKA OF DISTRICT GADCHIROLI (LR-46)
Estimate Prepared By :-
Estimate Checked By :-
GENERAL DESCRIPTION
( Attached Separately)
Name of work :-
CONSTRUCTION OF SUBMERSIBLE BRIDGE IN KM 4/950 ON MARPALLI - REGULWAHI ROAD, IN
ETAPALLI TALUKA OF DISTRICT GADCHIROLI (LR-46)
1.1 Introduction :-
The road from Marpalli - Regulwahi is part of the Link Route No. LR-46 in Etapalli Taluka of District
Gadchiroli. This bridge is proposed in New connectivity Program under 'PMGSY"
Total 0
1.3 Necessity :-
The Link Route No. LR-46, connects the village Kasurwahi & Kohka to the Taluka headquarter at Etapalli,
Presently there is an Unbridge Crossing at the proposed bridge site. Hence it is necessary to construct a
Submersible bridge at this proposed location so that the bridge is not overtopped during ordinary bridge.
Year Rainfall
2013 mm
2014 mm
2015 mm
2016 mm
2017 mm
Avg. mm
1.7 Hydraulic Data :-
The hudraulic details of the river at the proposed site of bridge are given below :-
1.8 Foundation :-
As per trail pit result, rock is available at workable depth, hence Open Foundation is proposed. The trial pits
result is attached with this DPR. The bearing capacity of strata at foundation level is 20 t/m 2.
1.9 Proposal :
A) Bridge Propoer
It is proposed to construct a submersible bridge clearing H.F.L. R.L. 88.43 m
The length of the bridge required is 16.00 Mtr. 2 Spans of 8.00 mtr C/c
(Right Angle Crossing)
For the various bridge components Type drawings of Designs Circle (Bridge), P.W.D. Govt. Of
Maharashtra are adopted as mentioned below.
B) Approaches
Submersible Approaches of 68m. On Marpalli side and 100m. Length on Regulwahi Side are considered in
the proposal.
1.10 Specifications :-
Quality Assurance handbook, Vol-I and Vol.-II, Specification for Rural Roads (2004), Rural Road Manual,
IRC : SP:20 (2002), IRC: SP : 13: 2004, IRC : SP : 82 : 2008 and Guidelines for Bridge Design by Designs
Circle, PWD, Govt. Of Maharashtra are followed. Type drawings issued by Design Circle, PWD, Govt. of
Maharashtra are adopted for Abutments. Piers, Caps, Slab, Wearing Course, Returns, etc.
1.11 Drawings :-
The Following drawings are attached with the DPR.
1) General Arrangement Drawing
2) Index Map
3) Key Map
4) Type design Drawing
5) Cross section of river at defined section and proposed site, nalla bed.
6) Site plan & L-section of the crossing at proposed site with approaches
7) I Trial Pit Result
1.12 Lead :-
Govt. Quarry is not available near the work site, hence nearest private quarries for material are considered
for preparing the estimate. Shortest distance is considered for obtaining quarry materials. Detailed Quarry
Chart and Lead Statement is enclosed separately.
1.13 Rates :-
Schedule of Rates (SOR) - 2015-2016 for PMGSY work in Maharashtra is adopted for preparing the
estimate.
2.3 Hydraulies :-
2.3.1 Hydraulic done at the cross section 60m U/s of proposed site.
2.3.3 Observed High flood level is considered as design H.F.L. To fix road top level and length of
bridge as per site condition.
2.3.4 The bridge is proposed to be designed (5.95 in overall width) submersible bridge.
2.4 Foundation :-
As per trial pit result, rock is not available at workable, depth, hence Raft Foundation is proposed. The
Trial pits result is attached with this DPR. The bearing capacity of strata at foundation level is 20 t/m 2.
Open foundation top 2.5m below the L.B.L. & Solid Return 1.5m below the L.B.L
2.5 Proposal :-
2.5.1 It is proposed to construct submerssible bridge having total length 16 Mtr.
.
2.5.2 It is proposed to provide - 2 Spans of 8.00 mtr C/c (Right Angle crossing) the RTL works out
as below with this proposal.
2.5.3 With the above proposal the percentage obstruction works out to be 17.7 % which is less than
30%.
2.5.4 As per Designs Circle (Bridge), P.W.D. Govt. Of Maharashtra, the bridge is designed for two
train of Class-A
2.6 Sub Structures :-
It is proposed to provide solid type Abutment as per Type Dwg. No. BR-2/2002/55 & Solid type Pier as per
Type Dwg. No. BR-2/2002/43. Abutment & Pier are proposed in CC M-15 with surface reinforcement. The
top width of pier and abutment are 0.90m. The batter for Abutment is 1 in 6 (inner side) & 1:5 (outer side)
2.6.2 Solid Returns in M-15 as per type drawing are proposed for 2.96m length on either side of the
bridge.
2.7 Superstructure :-
2.7.1 The superstructure is proposed in M-25 as per Design Circle's type drawing of Solid Slab of
8.00m C/c.
2.7.2 Tar paper bearing are proposed below the solid slab.
2.7.3 As the bridge is submersible Pipe Railing is proposed. Type drawing of Design Circle is
adopted for it.
2.8 Standards :-
2.8.1 The bridge is proposed to be intermediate lane clear width 5.50m (overall width 5.95m),
submersible bridge without footpath.
2.8.2 The bridge site lies in Seismic Zone-II. The type drawings adopted from Design Circle which
designed for this Seismic Zone-II.
2.9 Miscellancous :-
2.9.1 The RCC Wearing Coat is proposed of 80mm thick in M-30.
2.9.2 25mm thick bituminous pad for expansion joints are proposed.
2.10 Approaches :-
Submersible Approaches of 68m. On Marpalli side and 100m. Length on Regulwahi Side are considered
in the proposal.
Supreintending Engineer
PMGSY, MRRDA
Nagpur Division, Gadchiroli
PRADHAN MANTRI GRAM SADAK YOJNA (PMGSY)
GENERAL ABSTRACT
Sr. Description of Item No. Length Bredth Depth Quantity Unit Rate Amount
A) EXCAVATION
1 Earthwork in excavation for structures as per
drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50m, dressing
of sides and bottom and backfilling in trenches with
excavated suitable material. (Item No. 11.1 (I) (i) /
P.No. 43)
AVERAGE G.L. FOR ABUTMENT
( 86.505 86.625 86.562 86.551 86.562
86.552 )/6
86.560
AVERAGE G.L. FOR PIER
( 86.432 86.430 86.428 86.431
)/4
86.430
2 I) Ordinary Rock
a) Upto 3.00m Depth
86.173 - 84.673 1.500
FOR ABUTMENT 2 6.250 3.920 1.500 73.500
p 2
At 7.450 0.900 + /4 x 0.90 7.340
p 2
Ab 7.450 0.900 + /4 x 0.90 7.340
p 2
Am 7.450 0.900 + /4 x 0.90 7.340
1 ( H / 6 ) x ( At+ Ab + 4 x Am )
FOR ABUTMENT
Front Side 2 5.950 4.703 55.966
Back Side 2 4.950 4.179 40.295
4 2.495 0.900 + 1.309 11.023
2
4 0.375 2.495 / 2 1.871
4 0.951 1.684 + 2.82 8.563
2
4 0.400 3.418 5.469
284.253 Sqm
SURFACE REINFORCEMENT @ 5 Kg /Sqm 284.25 x 5.00 1.421 MT
1000
KERBS 0.06 Cum / Rmt. 2 24.620 0.060 2.954 Cum 8451.90 24967.00
16 Supplying fitting, and placing TMT bar
reinforcement in superstructure complete as per
drawing and technical spcifications Clauses
1002,1010 and 1202 (Item No. 13.3 P.No. 50)
CONSTRUCTION OF SUBMERSIBLE BRIDGE IN KM 4/200 ON MARPALLI-REGULWAHI ROAD, IN ETAPALLI TALUKA OF DISTRICT GADCHIROLI (L.R.-46)
BRIDGE APPROACHES
MARPALLI SIDE 68 PACKAGE :- MH
REGULWAHI SIDE 100 BLOCK :- ETAPALLI
-1 168 Mtr. DISTRICT :-GADCHIROLI
Sr. Description of Item No. Length Bredth Depth Quantity Unit Rate Amount
1 168 12 - 6 1008
Sqm
1008 / 10000 0.1 0.1 Hector 18929.65 1908.00
B) EARTHWORK
2 Excavation for roadway in soil using manual means
for carrying of cut earth to embankment site with a
lift upto 1.05m and lead upto 50m as per Technical
Specification Clause 302.3 (Item No. 3.5 (i)/P.No.
13)
E PROECTION WORK
5 Providing and laying filter material undermeath
pitching in slopes complete as per drawing and
Technical Specification Clause 1302 (Item No.
14.6/P.No. 54)
F ROAD FURNITURE
EARTHWORK STATEMENT
Ch. Ground Road Top Formation Diff. Betn Top Width Bottom Width Area Average Area Dist. Quantity Silent Avg. Area for
Level Level Level F.E. & OGL Bank. Cutt. Bank. Cutt. Bank. Cutt. Bank. Cutt. Bank. Cutt. Height Height Pitching
TO KASURWAHI
4950 89.793 89.793 89.468 -0.325 8.80
4960 88.988 89.443 89.118 0.130 8.80 10.620 1.37 10.00
4970 88.503 89.268 88.943 0.440 8.80 11.860 1.90 1.635 10.00 16.35
4980 88.038 89.093 88.768 0.730 8.80 13.020 3.19 2.545 10.00 25.45 0.733
4990 87.648 89.093 88.768 1.120 8.80 14.580 3.55 3.370 10.00 33.70 1.129 0.931 18.62
5000 86.648 88.818 88.493 1.845 8.80 17.480 4.63 4.090 10.00 40.90 1.973 1.551 31.02
5010 86.133 88.818 88.493 2.360 8.80 19.540 9.26 6.945 10.00 69.45 3.464 2.7185 54.38
5017 85.763 88.818 88.493 2.730 8.80 21.020 14.89 12.075 7.00 84.53 3.952 3.708 51.92
Proposded Bridge
TO KOHKA
4966 87.728 89.793 89.468 1.740 8.80 17.060 14.290 7.145 3.572
4976 87.808 89.793 89.468 1.660 8.80 16.740 6.240 10.265 10.00 102.65 2.700 3.136 62.72
4986 87.988 89.793 89.468 1.480 8.80 16.020 3.500 4.870 10.00 48.70 1.817 2.259 45.17
4996 87.898 89.608 89.283 1.385 8.80 15.640 3.430 3.465 10.00 34.65 1.042 1.430 28.59
5006 87.823 89.283 88.958 1.135 8.80 14.640 3.110 3.270 10.00 32.70 1.491 1.267 25.34
5016 87.948 89.098 88.773 0.825 8.80 13.400 2.770 2.940 10.00 29.40 0.798 1.145 22.90
5026 88.078 88.913 88.588 0.510 8.80 12.140 2.740 2.755 10.00 27.55
5036 88.178 88.733 88.408 0.230 8.80 11.020 3.000 2.870 10.00 28.70
5046 88.288 88.548 88.223 -0.065 8.80 9.840 1.920 2.460 10.00 24.60
5056 88.073 88.363 88.038 -0.035 8.87 8.8 0.31 10.00
5066 88.178 88.178 87.853 -0.325 9.45 8.8 2.97 1.64 10.00 16.37
Total Qty 599.33 16.37 340.66
Cum Cum Sqm
CONSTRUCTION OF SUBMERSIBLE BRIDGE IN KM 4/200 ON MARPALLI-REGULWAHI ROAD, IN ETAPALLI TALUKA OF DISTRICT GADCHIROLI (L.R.-46)
A) EXCAVATION
C) FOUNDATION
Rs. 8104.66
Deduct 6% for VAT Rs. -486.28
Total Rs. 7618.38 7618.40 /Cum
PCC Grade M-15 (Nominal Mix 1:2.5:5) Rate as per S.O.R. Rs. 4685.70
Deduct Royalty Charges 0.48 Cum 141.34 -67.84
Rs. 4617.86
Add for Transportation of Metal 0.800 Cum 3289.15 2631.32
Add for Transportation of Sand 0.480 Cum 210.56 101.07
Add for Transportation of Cement 0.275 M.T. 873.80 240.30
Rs. 7590.55
Deduct 6% for VAT Rs. -455.43
Total Rs. 7135.11 7135.10 /Cum
D) SUBSTRUCTURE
9 Providing and laying P.C.C. M-15 Grade cement
concrete in substructure complete as per drawings
and technical specification Clause 802, 804, 805,
806, 807, 1202 and 1204 (Item No. 12.5 (I) (i)/
P.No. 47)
For Abutment & Pler for Height Upto 5m
Sr. Description of Item Quantity Unit Rate Amount Final Rate
I) PCC Grade M-15 (i) Nominal Mix (1:2:5:5) Rate as per S.O.R. Rs. 5020.90
Deduct Royalty Charges 0.48 Cum 141.34 -67.84
Rs. 4953.06
Add for Transportation of Metal 0.800 Cum 3289.15 2631.32
Add for Transportation of Sand 0.480 Cum 210.56 101.07
Add for Transportation of Cement 0.275 M.T. 873.80 240.30
Rs. 7925.75
Deduct 6% of VAT Rs. -475.54
Total Rs. 7450.20 7450.20 /Cum
For Pier & Abutment Cap III) RCC Grade M-20 Rate as per S.O.R. Rs. 5704.90
Deduct Royalty Charges 0.45 Cum 141.34 -63.60
Rs. 5641.30
Add for Transportation of Metal 0.900 Cum 3289.15 2960.24
Add for Transportation of Sand 0.450 Cum 210.56 94.75
Add for Transportation of Cement 0.350 M.T. 873.80 305.83
Rs. 9002.12
Deduct 6% of VAT Rs. -540.13
Total Rs. 8461.99 8462.00 /Cum
For Box Return IV) RCC Grade M-25 Rate as per S.O.R. Rs. 6079.10
Deduct Royalty Charges 0.45 Cum 141.34 -63.60
Rs. 6015.50
Add for Transportation of Metal 0.900 Cum 3289.15 2960.24
Add for Transportation of Sand 0.450 Cum 210.56 94.75
Add for Transportation of Cement 0.404 M.T. 873.80 353.02
Rs. 9423.51
Deduct 6% of VAT Rs. -565.41
Sr. Description of Item Quantity Unit Rate Amount Final Rate
Total Rs. 8858.10 8858.10 /Cum
E) SUPERSTRUCTURE
19 Providing and laying reinforced cement concrete M-
25 in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5
(Item No. 13.1 (II) / P.No. 50)
For Slab II) RCC Grade M-25 Rate as per S.O.R. Rs. 6601.50
Deduct Royalty Charges 0.45 Cum 141.34 -63.60
Rs. 6537.90
Add for Transportation of Metal 0.900 Cum 3289.15 2960.24
Add for Transportation of Sand 0.450 Cum 210.56 94.75
Add for Transportation of Cement 0.404 M.T. 873.80 353.02
Rs. 9945.91
Deduct 6% of VAT Rs. -596.75
Total Rs. 9349.15 9349.15 /Cum
Sr. Description of Item Quantity Unit Rate Amount Final Rate
LEAD STATEMENT
Sr. Material Sources Loading Unloadin Haulag Lead in Density Total Rate Net Rate
No. g Rate Km
1 2 3 4 5 6 7 8 = 3+4+(5X7) 9
1 CRUSHER BROKEN METAL (QUARRY TO WORK SITE) NANDORI 87.30 17.20 1819.80 247.00 1.75 3289.15 3289.15
2 HAND BROKEN METAL KHANDOLI 87.30 17.20 935.40 113.00 1.75 1741.45 1741.45
3 COARSE SAND LOCAL AVAILABLE 27.30 14.30 105.60 5.00 1.60 210.56 210.56
4 FINE SAND LOCAL AVAILABLE 27.30 14.30 105.60 5.00 1.60 210.56 210.56
5 MURUM LOCAL QUARRY 45.90 17.20 121.20 6.00 1.67 265.50 265.50
6 MURUM - FOR SIDE BERM LOCAL QUARRY 183.60 10.00 1.67 306.61 306.61
6 BITUMEN (MUMBAI RFINERY TO WORK SITE) MUMBAI Heating & Unloading 8.40 1192.00 - 10012.80 10012.80
Haulage Charges
a) Upto 5 Kms Lead Fixed 105.60 MT Deduct VAT on Basic Rate Net Basic Rates
b) 6 Km to 10 Kms Lead 15.60 MT/Km (60/70) 36170 -2170.20 33999.80
c) 11 Km to 50 Kms Lead 8.40 MT/Km (RS-1) 27812 -1668.72 26143.28
d) Beyond 50 Kms Lead 6.60 MT/Km (SS-1) 28814 -1728.84 27085.16
e) Bulk Bitument from Refinery including 8.40 MT/Km
Heating and Unloading (From Initial Lead)
CONSTRUCTION OF SUBMERSIBLE BRIDGE IN KM 4/200 ON MARPALLI- REGULWAHI ROAD, IN ETAPALLI TALUKA OF DISTRICT GADCHIROLI (L.R.-46)
By Manual Means (Rs. 20137.95/ Hectare) Rate as per S.O.R. Rs. 20137.95
Rs. 20137.95
Deduct 6% for VAT Rs. -1208.28
Total Rs. 18929.67 18929.65 /Cum
By Mechanical Means
Rate as per S.O.R. Rs.
81.40
Rs. 81.40
Deduct 6% for VAT Rs. -4.88
Total Rs. 76.52 76.50 /Cum
Matrial obtained from Borrow Pits (With Lead Upto 1000m) Rate as per S.O.R. Rs. 352.90
Rs. 352.90
Add for Transportation of 1.000 Cum 24.96 24.96
Rs. 377.86
Deduct 6% for VAT Rs. -22.67
Total Rs. 355.19 355.20 /Cum
Typical MMGSY Citizen Informatory Board Rate as per S.O.R. Rs. 15000.00
Rs. 15000.00
Deduct 6% of VAT Rs. -900.00
Total Rs. 14100.00 14100.00 /Cum
3 CC M-10, Levelling Course 11.726 Cum Sand 0.480 5.628 141.34 796.00
4 CC M-15, Cross Toe Wall 94.387 Cum Sand 0.480 45.306 141.34 6404.00
5 CC M-15, Cutoff Wall 0.000 Cum Sand 0.450 0.000 141.34 0.00
6 CC M-25, Raft Slab 0.000 Cum Sand 0.450 0.000 141.34 0.00
7 Rubble Filling 101.795 Cum Rubble 1.000 101.795 141.34 14388.00
101.795 Cum Sand 0.200 20.359 141.34 2878.00
8 CC M-15, Abutment, Pier & Solid 220.181 Cum Sand 0.450 99.082 141.34 14004.00
Return
9 C.C. M-20, Cap 21.706 Cum Sand 0.450 9.768 141.34 1381.00
10 C.C. M-25, Box Return 0.000 Cum Sand 0.450 0.000 141.34 0.00
11 Filling Sand in Foundation 0.000 Cum Sand 1.000 0.000 141.34 0.00
12 Providing & Laying Filter Media 117.622 Cum HB Metal 1.200 141.146 141.34 19950.00
13 Back Filling in Abutment Return 15.019 Cum Murum 1.200 18.022 141.34 2547.00
14 Boulder Apron 102.720 Cum Boulder 1.200 123.264 141.34 17422.00
15 C.C. M-25, Solid Slab 58.328 Cum Sand 0.450 26.247 141.34 3710.00
16 C.C. M-30, Wearing Coat 8.102 Cum Sand 0.450 3.646 141.34 515.00
17 C.C. M-25, Ballast Wall & Kerb 5.292 Cum Sand 0.450 2.381 141.34 337.00
APPROACHES
4 Providing Earthwork 732.120 Cum Soil 1.000 732.120 141.34 103478.00
10 Filter Material Undermeth 58.110 Cum HB Metal 1.200 69.732 141.34 9856.00
11 Pitching on Side Slopes 116.220 Cum HB Metal 1.200 139.464 141.34 19712.00
12 Random Rubble Masonary 45.000 Cum HB Metal 1.160 52.200 141.34 7378.00
45.000 Cum Sand 0.350 15.750 141.34 2226.00
1605.91 Total Rs. 226982.00
Proposal for approval DSD of Bridges is received from Executive Engineer (PMGSY), MRRDA Division Gadchiroli is
received vide letter under reference and same is scrutinised in this office, and approval is accorded as below.
Proposal for construction of bridge of chainage _____________ 4/950 __________ on Kasurwahi - Kohka Road
road with hydraulic details mentioned above for a linear waterway of 16.00 mtr with 2 Spans 8 mts with Open
Foundation is hereby approved.
Note :
1 Type drawings issued by Design circle in the year 2002 shall be adopted for execution of bridges including RCC
drawings etc.
2 Stoppers on D/s side of pier cap level shall be provided as per shown in drawing in submerssible.
3 EE shall ensure that the stoppers on D/s at pier cap level shall invariobly be provided during execution.
4 EE shall check the strata of foundation and decide suitability of foundation during execution and shall not rely on trial
pit taken during survey.
5 EE shall prepared DPR for bridge based on SOR 2017-18 and submit for according technical sanction.
No. __________________________________________________
Copy to Executive Engineer (PMGSY), MRRDA Division, Gadchiroli for information & compliance
NAME OF WORK
CONSTRUCTION OF SUBMERSIBLE BRIDGE IN KM 4/200 ON MARPALLI- REGULWAHI ROAD, IN
ETAPALLI TALUKA OF DISTRICT GADCHIROLI (L.R.-46)
TECHNICAL REPORT
Name of work : The Detaile Survey Data for the Construction of High level Minor Bridge in Km 4/950
on Marpalli - Regulwahi Road in Etapalli Taluka of district Gadchiroli.
Authority : This work is included Under "Pradhan Mantri Gram Sadak Yojana" (LWE Block) for
the year 2016-17
Necessity : This proposed Linki Route (L- 045) in Block - Etapalli is serving the
___________________________________________ having existing Cart Track.
This is a rural road connecting rural habitation to Main nearby Market center, Health
centre and Education centre etc. It is necessary to construct bridge to give all
weather connectivity to unconnected habitations.
Present Position : In Km 4/950 at present there is an Unbridge crossing. Also during rainy season the
road gets interrupted for 2 days (8 to 10 times) in flood, and villagers of these
villages get disconnected from Taluka Place, Main Market, Health Centre and
Education centre etc. So to make the road all weather and maintain interruptions
within limit, it is necessary to construct a High level Minor Bridge at this crossing.
Provision : Proposed 2 Span of 8.00m C/c High Level Minor Bridge with Open Foundation &
Right Angle Crossing.