Daily Patrolling Detail at CNT Pipeline.: Doha Power Station To JAHARA RESERVIOR & Manifold A To Shuwaikh Power Station

1. D. Rajakumar observed the daily patrolling of pipelines from Doha Power Station to JAHARA RESERVIOR and Manifold A to Shuwaikh power station on June 6, 2021 from 8:00-1:00 pm. 2. The status of all pipelines in the corridor from Doha Power Station to JAHARA RESERVIOR were reported as OK. 3. Several observations were made along the 18" Fuel gas pipeline from Manifold A to Shuwaikh power station including an open trench that was not backfilled, a collapsed route marker board, and trees planted above a buried pipeline corridor.

Uploaded by

Venkatesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

Daily Patrolling Detail at CNT Pipeline.: Doha Power Station To JAHARA RESERVIOR & Manifold A To Shuwaikh Power Station

1. D. Rajakumar observed the daily patrolling of pipelines from Doha Power Station to JAHARA RESERVIOR and Manifold A to Shuwaikh power station on June 6, 2021 from 8:00-1:00 pm. 2. The status of all pipelines in the corridor from Doha Power Station to JAHARA RESERVIOR were reported as OK. 3. Several observations were made along the 18" Fuel gas pipeline from Manifold A to Shuwaikh power station including an open trench that was not backfilled, a collapsed route marker board, and trees planted above a buried pipeline corridor.

Uploaded by

Venkatesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Daily Patrolling Detail at CNT Pipeline.

Area: Doha Power Station to JAHARA RESERVIOR & Date : 06/06/2021 Time : 8.00 - 1:00 pm
Manifold A to Shuwaikh power station

Observed by : D. Rajakumar
Patrolling at CNT Pipeline Doha Power Station to JAHARA RESERVIOR & Manifold A to Shuwaikh Power Station
S.No Location of Patrolling Details of Corridor (Pipeline) Status of Corridor

1 Doha Power Station to JAHARA RESERVIOR 16" HFO Pipeline OK

2 Doha Power Station to JAHARA RESERVIOR 30/42" Fuel Gas Pipeline OK

3 Doha Power Station to JAHARA RESERVIOR 2x20" HFO Pipeline OK

4 Doha Power Station to JAHARA RESERVIOR 2x40" Fuel gas pipeline OK

5 Doha Power Station to JAHARA RESERVIOR 20" New crude oil pipeline OK

6 Doha Power Station to JAHARA RESERVIOR 16" Gas oil pipeline OK

7 Doha Power Station to JAHARA RESERVIOR 12" LSFO pipeline OK

8 Doha Power Station to JAHARA RESERVIOR 10" Gas oil pipeline OK

9 Manifold A to Shuwaikh power station 18" Fuel gas pipeline OK

Sr. No. Location Observation Remark


20" crude pipeline from (Kadma to Doha power KDDB Contractor ( Contract Number 19053630) maintenance crew KOC PTW No: 1112618, 1112619
station) KM - 15+000 and 10 + 500 carrying out manual excavation for cut and replacement of 20" crude Manpower: 43 Excavation Notification -T-
1 pipeline 260074

18" Gasline (Manifold A to Shuwaikh power it is observed that the open trench which is not backfilled(1/2 meter
2 N/A
station) KM - 08 + 100 depth)

18" Gasline (Manifold A to Shuwaikh power it is observed that the collapse of the route marker board due to soil
3 station) KM - 12 + 702 erosion (1/2 meter depth) N/A

4 18" Gasline (Manifold A to Shuwaikh power Khalid al kharafi completed the pedestrian bridge N/A
station) KM - 15 + 000 conctruction(contract no - RA - 224) near crown plaza.

18" Gasline (Manifold A to Shuwaikh power it is observed that the garden and trees planted above the buired 18" Already raised mamo twice - HSE Gas
5 station) KM - 22 + 772 to 23+085 Gas pipeline corridor /777/2020 (DIMS NO 5435704)

UGCC Contractor ( Contract Number- RA - 223) crew (construction


6 18" Gasline (Manifold A to Shuwaikh power of 6.5 ring road) construction of box culvert is completed.Instructed KOC PTW No: 988493 Manpower: 04
station) KM - 12 + 850 site supervisor to clear the area and housekeeping in progress and
after completion of housekeeping planning for backfilling

Senior Engineer sign: Safety Engineer: Safety Officer Sign: