Transformer Installation Checklist

This document provides a checklist for installing transformers with 12 items to check including: 1) type and quantity, 2) location per drawings, 3) vertical and horizontal alignment, 4) level per design, 5) spacing with other equipment, 6) hangers and supports, 7) bolts and nuts, 8) phase per manufacturer, 9) grounding, 10) paint, 11) nameplate and symbol, and 12) filing shop drawings. It also includes a pre-energization checklist with 15 items to inspect such as: presence of safety gear, fire extinguisher, first aid kit, warning signs, earth cable, physical condition, oil leakage, oil level, fixing, space, level, temperature

Uploaded by

thy selaroth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views

Transformer Installation Checklist

This document provides a checklist for installing transformers with 12 items to check including: 1) type and quantity, 2) location per drawings, 3) vertical and horizontal alignment, 4) level per design, 5) spacing with other equipment, 6) hangers and supports, 7) bolts and nuts, 8) phase per manufacturer, 9) grounding, 10) paint, 11) nameplate and symbol, and 12) filing shop drawings. It also includes a pre-energization checklist with 15 items to inspect such as: presence of safety gear, fire extinguisher, first aid kit, warning signs, earth cable, physical condition, oil leakage, oil level, fixing, space, level, temperature

Uploaded by

thy selaroth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Version Revision Code Nº Issued Page

1 1 EL008A 1-Jan-08 1/1 PROJ.

TRANSFORMER INSTALLATION ADRS


CONTRACTING DIVISION
No 8b, Down Town Road 7,P.O.Box 28, CHECKLIST
Phnom Penh, Kingdom of Cambodia PAGE

SYSTEM

SCHEDULE

SPECIFICATION

REF. DRWG

ACTION
No. DESIGNATION
YES NO N/A DATE

1 Type, quantity

2 Check location as per drawing

3 Check vertical/ horizontal in alignment

4 Check level as per design

5 Spacing with other equipment or service

6 Check Hanger & support

7 Bolt & nut

8 Check phase as per manufacturer's design

9 Check grounded with grounding system

10 Paint

11 Nameplate/ symbol

12 Shop Drawing marked up as per actual installation and filed.

REMARK

INSPECTED BY: APPROVED BY: WITNESSED BY:

DATE: DATE: DATE:


Version Revision Code Nº Issued Page
1 1 EL005B 1-Jan-08 1/1 PROJ.

TRANSFORMER ADRS
CONTRACTING DIVISION
No 8b, Down Town Road 7,P.O.Box 28, PRE-ENERGISATION CHECK
Phnom Penh, Kingdom of Cambodia DATE

SYSTEM

SCHEDULE

SPECIFICATION

REF. DRWG

RESULT
ITEM INSPECTION Remark
OK NO N/A

1 Check the presence of safety items (glove, foot step…)

2 Check the presence Fire extinguisher


3 Check the presence of first aid advice's plate
4 Check the presence of warning plate of high voltage
5 Check the presence of earth cable and properly connected

6 Physical check for mechanical damages

7 Check for oil leakage

8 Check oil level

9 Check for fixing on base (if needed)

10 Check requirement space of transformer

11 Check transformer level

12 Check room temperature during operation

13 Check vertical/horizontal alignment

14 Check name plate and symbol

15 Shop drawing mark up as per actual installation and filed

Remark:

READ BY: APPROVED BY: WITNESSED BY:

DATE: DATE: DATE:

You might also like