Key Plan: Section of A-RMG Track Beam
Key Plan: Section of A-RMG Track Beam
Buildi
ative
929,3
istr
Admin
2
6
187,2
Key Plan
1:30,000
14.1
10 20
31
9 19
20
8 18
31
7 17
24
6 16
31
298
5 Trenchlok 15
20
4 14
31
3 28 28 13
20
TB3
TB4 TB1 TB1 TB1 TB1 TB2 TB2 TB1 TB1 TB1 TB1 TB2 TB2 TB1 TB1 TB1 TB1 TB4
6.88
(17+0.02)×3=51.06 0.02 (17+0.02)×3=51.06
24 14 20 (15+0.02)×7=105.14 15 (15+0.02)×6=90.12 20 20 (15+0.02)×7=105.14 15 (15+0.02)×6=90.12 20 20 (15+0.02)×6=90.12 15 (15+0.02)×7=105.14 20 14 48
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
960 C32/40 Concrete Slab 400mm A-RMG Track Beam 1050mm
Cement Stabilized Crushed Stone 300mm C12/15 Lean Concrete 100mm
Graded Broken Stone 150mm Graded Broken Stone 150mm
Cable Slot 1400
1700 1100
Control Point Coordinates Table A-RMG Track Beam Statistical Table
1
1:
1:
1
Excavation Slope Excavation Slope
2200
LEGEND:
Type 12
0 ISSUED FOR CONSTRUCTION 2021-05-10 Zhang Yong Chang Zhanwei Wu Zhefeng NOTES: PROJECT: DRAWING TITLE: SCALE :
CLIENT: DESIGNER : A1: 1:2000
F For Revision 2020-10-20 Zhang Yong Chang Zhanwei Wu Zhefeng 1.The dimensions are in meters. A3: 1:4000
E For Revision 2020-09-21 Zhang Yong Chang Zhanwei Wu Zhefeng 2.Coordinates system: local topographic coordinates.
D For Revision 2020-08-18 Zhang Yong Chang Zhanwei Wu Zhefeng Chancay Multipurpose Terminal New First Stage, Peru DATE :
3.The final handover elevation, which includes pavement thickness and ground improvement should consist with Drawings: Port Operating Zone Elevation System(I) ~ (VI).
C For Revision 2020-03-23 Zhang Yong Chang Zhanwei Wu Zhefeng Layout Plan For A-RMG Track Beam 2021-05-10
中远海运港口秘鲁钱凯公司 2020-03-20 Zhang Yong Chang Zhanwei Wu Zhefeng Detailed Engineering
COSCO SHIPPING Ports Chancay PERÚ S.A. CCCC Water Transportation Consultants Co.Ltd B For Revision CODE : REVISION:
Rev. DESCRIPTION DATE BY. CKD. APD. AUD.
The Ports for ALL P114143-E-000-RY-DWG-008-R0 R0
REVISIONS