Lighting and Control Systems Commissioning

This document outlines the commissioning process for lighting and control systems. It lists various lighting equipment and control systems that may require commissioning including fixtures, scheduled controls, occupancy sensors, daylight dimming, and switching. It also includes sections for project details, the commissioning plan checklist, and an approval section.

Uploaded by

Bruno Celis
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views

Lighting and Control Systems Commissioning

This document outlines the commissioning process for lighting and control systems. It lists various lighting equipment and control systems that may require commissioning including fixtures, scheduled controls, occupancy sensors, daylight dimming, and switching. It also includes sections for project details, the commissioning plan checklist, and an approval section.

Uploaded by

Bruno Celis
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Lighting and Control Systems Commissioning

Chapter 1
Project: _____________________________________________ Address: ________________________________
Owner: _____________________________________________ Email/Phone: _____________________________
Owner’s Project Manager: ______________________________ Email/Phone: _____________________________
Cx Provider: _________________________________________ Email/Phone: _____________________________
Date Initiated: ______________________ Date Revised: ______________________
System Integrated System

Chapter 2
Commissioning
Commissioning Commissioning
Item Equipment/System Complete—
Required— Required—
Date
Y/N Y/N
1. Lighting fixtures and lamps
2. Scheduled lighting control systems and

Chapter 3
exterior lighting controls
3. Occupancy sensor controls
4. Daylight dimming systems
5. Lighting switching
6. Lighting level verification

Chapter 4
Chapter 5
Appendix B
Appendix B

The approval section that follows can be used if applicable to the planning process. Approval can be granted by the
Owner/representative, Design Team, or CxP depending on the Owner’s requirements.

I have reviewed the required items and plans and verified that they meet the project requirements:
Owner or Owner’s Representative Name: ___________________________________________________________
Appendix B

Company Name: ______________________________________________________________________________


Signature: _____________________________________________ Date: _________________________________