The document is a request from ARC to United Engineering for clarification on payment terms and submission of technical documents for a tank maintenance project. Specifically: 1) ARC requests United Engineering submit their proposed payment terms, including paying 15% as an advance and distributing the remaining 85% according to schedules for erection works, supply of materials, and after completion. 2) ARC asks United Engineering to submit a complete technical proposal for the tank maintenance as per the tender documents and API653 standards, including procedures, specifications, and a bill of quantities. 3) ARC lists additional documents and amendments required in the technical offer, scope of work, specifications, and bill of quantities regarding items like tank
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views12 pages

Clarification Request (United Engineering) 1

The document is a request from ARC to United Engineering for clarification on payment terms and submission of technical documents for a tank maintenance project. Specifically: 1) ARC requests United Engineering submit their proposed payment terms, including paying 15% as an advance and distributing the remaining 85% according to schedules for erection works, supply of materials, and after completion. 2) ARC asks United Engineering to submit a complete technical proposal for the tank maintenance as per the tender documents and API653 standards, including procedures, specifications, and a bill of quantities. 3) ARC lists additional documents and amendments required in the technical offer, scope of work, specifications, and bill of quantities regarding items like tank
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Clarification Request (United Engineering)

1. Terms of payment
• The terms of payment ) It was not mentioned in the unpriced
commercial offer except for the 15% as an advanced payment).
ARC requests united engineering to submit the terms of
payment mentioned under unpriced commercial offer, so that
it pays 15% of the total contract value as an advance payment
in exchange for opening a bank guarantee letter for the full
value of the contract issued by the Libyan Foreign Bank, and
this credit remains valid Until the issuance of the work
completion certificate, provided that the remaining 85% is
distributed according to the following breakdown:
1.1 Part I (Erection)
o paying 50% of the total value of the erection works
according to the progress monthly works within 30 days
from the date of invoices.
o Paying 5% of the total value of erection works within 30
days from the date of issuance of the initial acceptance
certificate.
o Paying 5% of the total value of erection works after 12
months of issuing the completion certificate for each
tank.
1.2 Part II (supply of material)
o Paying 15% within 30 days of submitting shipping
documents.
o Paying 5 % within 30 days of the receiving materials at
the site and approval by ARC.
o Paying 5% after 12 months of issuing final acceptance
certificate.
• The Acceptance of foreign currency rates will be according to
the bulletin issued by the Central Bank of Libya corresponding
to the closing date of receiving offers on 15/11/2022.
Please accept
• The acceptance of the general conditions contained in the bid
document and the technical and financial requirements it
contains, including a letter of good performance. Please accept
ARC ask United Engineering co. to submit complete technical proposal for tank
preventive maintenance as per tender’s documents and according to API653.
The technical offer shall include the following information including our
amendment in our scope of work, technical specification, BOQ and supply of
materials.

The following required list has been sent to all bidders, the bidder shall submit
the missed ones to fulfil the ARC's requirements, where the final procedures
shall be submitted to ARC for approval prior to commence any work.
1. Tank foundation repair procedure
2. Tank bottom plates replacement and repair procedure
3. Tank shell plates replacement and repair procedure
4. Door sheet opening procedure
5. Welding procedure specification (WPS) and welding procedure
qualification records (PQR) for supporting (WPS)
6. General inspection procedure
7. NDT testing procedures
8. Tank prepare for inspection procedures
9. Reference electrode installation procedure
10. Tank cleaning procedure
11. Surface preparation and coating procedure
12. Painting repair procedure
13. Sphere tank legs replacement procedure
14. Surface preparation and coating inspection procedure
15. Gap filling application procedure
16. Inspection and testing plan (ITP)

➢ To be amend
The following points have been changed in the original scope of work,
technical specification and bills of quantity. Bidders shall amend their
offer accordingly.

1. Tank Bottom plates (SOW)


• New point (4.2.6) in case of removing and renewing of
bottom accessories which is not falling within the area
of plate replacement the specific unit rate is required
to be added on the Bill of Quantities for “removal and
renewal of tank bottom accessories which is not
falling within the area of plate replacement such as
drain nozzles, bottom sump, roof support pads and
level deck”. please amend
2. Foundation pads (SOW)
• Point (4.4.8.4) The Contractor shall supply and lay fire proofing
(vermiculite cement) (H.D. cement) according to API
2218 approved by ARC and metal mesh if necessary for
06hours. Please amend your proposal and BOQ
accordingly
3. Painting (SOW)
• Point (4.12.1) “Surface preparation prior to applying the
coating by using grit blasting type copper slag (NAstra).
Quality and partial size in accordance with DIN EN ISO
11123-3 11126-3. Please amend
• Point (4.12.5) “Painting shall be the last activity to be
carried out after all work has been completed for each all
parts…” Please amend

4. Materials (ANNEXURE-I)
Materials: Generally, the material used for maintenance of tanks shall
conform to the following Specifications or equivalent as per API 650:
Plates : ASTM A-285 Gr.C / A-283 Gr.C / A-131
Pipes : ASTM A-106 Gr,.B / API 5L / A-53 seamless
Flanges : ASTM A-105 Gr.I
Structural : ASTM A-36
Bolting : ASTM A-193 Gr.B7 and A-194 Gr.2H
Electrodes : Manual Metal Arc Electrodes conforming to
AWS E6010 ER70-3/ E7018
Please confirm amendment accordingly.
ESTIM TOTAL
UNIT RATE
DESCRIPTION UNIT AMOUNT REMARKS
QTY (L. D)
(L. D)

Removal and renewal of tank bottom accessories which is not falling within the
B-6 area of plate replacement such as drain nozzles, bottom sump, roof support To be added
pads and level deck

C- FOUNDATION PAD:

Supply and lay fire proofing (vermiculite cement or equivalent H.D. cement)
C-6.2 including all metal mesh, etc. as detailed in para 4.4.8.4 of section-1 of the M3 40 To be amend
Scope of Work.
C-6.3 Supply and install fire proof coating for 6 hours fire rating M2 498 To be amend

Tank side gauges


supply shall be paid
under item U17.1
Tanks side gauges dismantling, supply,installation and testing Section 5 (Supply of
D-4
including supply of spare parts. material) (Refer to
our notification
letter on
24/10/2022)

F- FLOATING ROOF:

Partial replacement of existing roof sealing system (HMT stainless steel scissor
F-4 LM 100 30 TO be amend
type).

G- HEATING COILS:
ESTIM TOTAL
UNIT RATE
DESCRIPTION UNIT AMOUNT REMARKS
QTY (L. D)
(L. D)

Complete replacement of heating coils system with all its accessories, with 100%
G-1
radiography of the joints ond hydro test.

including heating
G-1.2 616-SL1 (4) Dia 21.34 m EA 1
element

including heating
G-1.3 616-SL2 (5) Dia 21.34 m EA 1
element

including heating
G-1.8 670S1 A/B & 670 S2B Dia 6.10 m EA 3
element

To be added
G-1.9 615F8(2-6) Dia 42.67 m EA 1 including heating
element

Complete replacement steam trap station unit including steam traps for heating
G-2 EA 10 To be amend
coil system

I PIPING:

Dismantling of existing damaged piping in following sizes at various elevations


I-1 and replacing the same with the new piping including wearing patch plates at To be amend
pipe support as per Para 4.7.1 of Section-1 of Scope of Work and piping code
ANSI B-31.3:

I-1.11 Ø 12” Sch.40 STD LM 36 To be amend


ESTIM TOTAL
UNIT RATE
DESCRIPTION UNIT AMOUNT REMARKS
QTY (L. D)
(L. D)

I-1.12 Ø 14” Sch.40 STD LM 36 To be amend

I-1.13 Ø 20” Sch.40 STD LM 24 To be amend

I-1.14 Ø 24” Sch.40 STD LM 24 To be amend

I-1.15 Ø 30” Sch.40 STD LM 24 To be amend

I-2 FIRE FIGHTING PIPES:

Dismantling of existing system piping , and provide new design, fabrication,


installation, inspection and testing of new fire water piping in the following tanks
sizes at various elevations inclusive of radiography of weld joints and testing of
lines as per para 4.7 of section-1 of the Scope of Work including supply of To be amend
materials (Hot Dip Galvanized & painted flanged pipes and fittings)

Note: The design shall comply with ARC specification and the following Codes
and Standards : (NFPA [11, 15, 25 &30] , API 521 & 2021 and ASQ Q9000)

I-4 TANKS COOLING PIPES:

Dismantling of existing system piping and provide New design, Fabrication,


installation, inspection and testing of new cooling water piping in the following
tanks sizes at various elevations inclusive of radiography of weld joints and To be amend
testing of lines as per para 4.7.3 of section-1 of the Scope of Work. including
supply of materials: (Hot Dip Galvanized & painted flanged pipes and
fittings)
ESTIM TOTAL
UNIT RATE
DESCRIPTION UNIT AMOUNT REMARKS
QTY (L. D)
(L. D)

Note: The design shall comply with ARC specification and the following Codes
and Standards : (NFPA [11, 15, 25 &30] , API 521 & 2021 and ASQ Q9000)

Painting system for


Option this material shall be
Alike to item I-2 description but with using Copper Nickel Alloy material
(1) specified on item M
(Painting)

I-5 LPG sphere tanks legs (St33 DIN17100, ASTM/ASME A3553 Gr.B) TO be amend

Replace of LPG spher tank legs pipe Ø 24” Sch.STD40 -(617-LPG 1)& (617-
I-5.1 LM 4222 To be amend
LPG 2) & (617-LPG 3)& (617-LPG 4)

I-5.2 Replace of LPG spher tank legs pipe Ø 12” SCH. 30 (617-LPG3) & (617_LPG4) LM 20 To be added

I-5.23 Replace of LPG spher tank legs pipe Ø 24” Sch.STD40 -(617-LPG 5) LM 36 To be amend

L- TANK HYDRO TESTING: (Including final settlement) To be amend

M- PAINTING:

External surfaces of tank shell and all accessories mounted on it such as wind
M-1 girders, ladders, handrail, platforms, external side of foam deflectors and fire M² 18,000
fighting pipes of the tank.

Internal surfaces of top 1m portion of tank shell and foam deflectors of


M-2 M² 2,600
floating roof tanks.
ESTIM TOTAL
UNIT RATE
DESCRIPTION UNIT AMOUNT REMARKS
QTY (L. D)
(L. D)

M-3 Internal surfaces of of top 1m portion of tank shell for fixed roof tanks. M² 17,400

M-3 Internal surfaces of tank bottom plates and shell Internal 1ST course M2 800

M-1 External surfaces of fixed roofs including all Accessories mounted on it. M² 8,000

External surfaces of floating roofs including rolling ladder and all other
M-5 M² 13,400
accessories mounted on it

M-6 Loading and unloading lines in the tank boundary wall area. M² 2,300

All internal surfaces of bottom, shell, roof plates and roof supporting structure
M-3 M² 900
of water service tanks.

item B has been


omitted (Refer to
B Underneath of the annular bottom plates M² 800 our notification
letter on
2/11/2022)

M-1
External surfaces of spheres including all accessories mounted on it like
M-4 M² 2,400
ladders, platforms, supports, level indicators, hand rails, piping etc.
M-6

M-1 sand papering and cleaning the external surface of tank shell with soap
M-4 solution and water thoroughly and apply one coat of a finish paint as per Para
M² 15,200
M-5 4.12.10 of section 1 of the Scope of Work and painting specifications to match
the colour with the surrounding tanks.
M-6
ESTIM TOTAL
UNIT RATE
DESCRIPTION UNIT AMOUNT REMARKS
QTY (L. D)
(L. D)

Tanks with insulated roofs, the roof plates in these tanks should be coated by (Refer to our
M-4 MASCOAT layer (minimum total thickness of 3mm) instated of the existed M² 1000 notification letter on
mineral wool insulation. 2/11/2022)

T Training on (API & ASME) standards To be added

The Contractor shall provide training for (20) Owner's Specialist Engineers for a
two weeks period (abroad) at an ASME and API approved training provider,
Including the provision of training materials in various specializations and
T-1 L.S.
accredited certificates (all training expenses shall be included in the
contract price and at the expense of the contractor), provided that ARC
bears travel and accommodation expenses.
UNIT TOTAL
EST.
S.N. DESCRIPTION UNIT RATE AMOUNT Notes
QTY (L.D.) (L.D.)

U-2 Structural:

Carbon steel structural conforming to


ASTM STD A-283 Gr. C or
Equivalent.

U-2.2 Channel 120 LM 400 To be omitted

U- 4 PIPE:

Carbon steel seamless pipe To be amend


confirming to ASTM A53G (B)API 5L
(A) standard with plain Ends:

U-4.1 Dia.30 inch STD SCH40 LM 24 To be amend

U-4.2 Dia. 24 inch STDSCH40 LM 24 To be amend

U-4.3 Dia.20 inch STDSCH40 LM 24 To be amend

U-4.4 Dia. 14 inch STDSCH40 LM 48 To be amend

U-4.5 Dia. 12 inch STDSCH40 LM 36 To be amend

U-4.11 Dia. 2 inch SCH 80SCH40 LM 300 To be amend

U-4.12 Dia.1 1/2 inch SCH 80 SCH40 LM 60 To be amend

U-4.12 Dia.1 inch SCH 80 SCH40 LM 200 To be amend

U-8 FLANGES:

Carbon steel slip on, raised face


flange, confirming to ASTM –105
U-8.1
Material having Dimensions as per
ANSI B16.5:

U-8.1.7 Dia. ½ inch 150 # Rating EA 10 Socket weld

Carbon steel blind flange, raised To be omitted


face. Confirming to ASTM –105
U-8.2
Material having Dimensions as per
ANSI B16.5:

U-8.2.1 Dia. 3 inch 150#Rating EA 30 To be omitted

Dia. 2 inch 150#Rating EA 30 To be omitted

U-9 TEE:

Forged Carbon Steel and Butt Soket


Welded tee Conforming to ASTM
Standard A-234 WPB Material &
Dimensions as per ANSI B16.9
Standard:
UNIT TOTAL
EST.
S.N. DESCRIPTION UNIT RATE AMOUNT Notes
QTY (L.D.) (L.D.)

U-9.6 Dia. ½ inches SCH 80 EA 5 Socket weld

U-11 BOLTS:

Galvanized Bolts class 6.8 in


U-11.2
following size:

U-11.2.1 Bolts M12 x 30 EA 3,250.00 To be amend

FIRE FIGHTING SYSTEM FOR


FIXED ROOF TANKS
U-13
EQUIPMENTS MINIMAX
COMPANY FOR TANKS:

Foam chamber, foam pourer & foam


making .

U-13.1 Tank No., 670S2B: To be amend

Foam chamber MX-STO 8S EA 1

Foam making MX-L8 St EA 1

Tank Nos., 614S1(4-1), 615F8(2-6)& To be amend


U-13.2
616SL1 (4):

Foam chamber MX-STO16 s EA 8

Foam making MX-L16st EA 8

U-13.3 Tank Nos., 670 - S1(A/B) To be amend

Foam chamber MX-STO 4 s EA 2 To be amend

Foam making MX-L 4 st EA 2 To be amend

SEALING SYSTEM (HMT


U-14 STAINLESS STEEL SCISSOR
TYPE):

Double Sealing System For Floating With all


U-14.4 LM 30
Roof Tanks (primary & secondary) accessories

Heating coils system including To be amend


Carbon steel seamless pipe
confirming materail to
U-15
ASTM A-106 Gr,.B
Sch80standard with plain Ends
and fittings

U-17 Tanks side gauges

U-17.1 Tanks side gauges with all EA 29 Latest design


accessories fitted with a mechanical
UNIT TOTAL
EST.
S.N. DESCRIPTION UNIT RATE AMOUNT Notes
QTY (L.D.) (L.D.)

locally mounted read-out at ground


level.