Q5. Reduce level (R.L) of ground along the centre line of a proposed road from chainage 10 to
20 are given below .The formation level at the 10th chainage is 107 and the road is in downward
gradient of 1 in 150 up to the chainage 14 and then the gradient chainage to 1 in 100 downward.
Formation width of road is 10meter and side slopes of banking are 2:1(horizontal: vertical).
Length of the chain is 30metre. Draw longitudinal section of the road and a typical cross section
and prepare an estimate of earth work at the rate of Rs.275%cu m. Find also the area of the side
slopes and the cost of turfing the side slopes at the rate of Rs.60.00% sq.m