0% found this document useful (0 votes)
59 views7 pages

Gty Automation: External Device For Weigher

Uploaded by

zul isyma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views7 pages

Gty Automation: External Device For Weigher

Uploaded by

zul isyma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

1 2 3 4 5 6 7 8 9 10

© 2021

A A
220L /

220N /

B B

C 1 C
1 1 1
M
-1M5 -1F2 -1F3 -1F4
PANEL 1~ 10A, 1P 2 6A, 1P 2 6A, 1P 2
VENT
FAN 2
220VAC
1LA 1LB
1LC
D D

+1EXT1

PE
E E

-1U1 -1A1
EXTERNAL DEVICE SBU
CONTROLLER -1V1
/4.2:H
/5.2:H
L N

1 3 FOR WEIGHER L N E PSU /6.2:B RS232


24VDC, 4.5A OMRON
-1F1 CN 2
20A, 2P 2 4
-1R1 1
F CHINT x1 x2 F
+Y 0.01 / 4.3:F
1.6KOHMS
ALARM /2.6:D
6.5:E / 100.02 X0
1
-Y
-1U2
HMI
6.6:E / 100.03 X1 RS232
C0 +24

G G

0
1 2

H H

+1EXT1
1 2
PE

R N E
I M I
‎AC220V, 1Φ PE -1M1
/2.4:H
P24 N24
2.1:A 2.1:B

DATE 1/10/2023 CUSTOMER : CONTRACTOR COMPANY: NOTES : Power Connection = +


J J
PROJECT : Project template with identification structure in accordance DRAWING NUMBER PAGE : 1/ 7
EDITOR EPLAN
with IEC standard: Page structure with higher-level
GTY AUTOMATION IEC_tpl001
CHECK BY function and mounting location SDN BHD AS BUILT
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
© 2021

A A
1.8:I / P24 P24 / 4.1:B

1.8:I / N24 N24 / 4.1:B


B B

C C

+1EXT1
-2U1
D BLH
D
CONTROLLER
1 2

CN 1 -1R1
x1 x2
+Y 1.02 / 5.4:F
1.6KOHMS
ALARM /1.7:F

GND:ORANGE
E 1 E
6.4:E / 100.01 start/stop

1
6.7:E / 100.04 run/brake

1
6.8:E / 100.05 cw/ccw

1
6.8:E / 100.06 int VR / EXT
F F
1
6.9:E / 100.07 alarm reset

G G

H H

1 2

M
-1M1
/1.6:I

I I

DATE 1/10/2023 CUSTOMER : CONTRACTOR COMPANY: NOTES : Power Connection = +


J J
PROJECT : Project template with identification structure in accordance DRAWING NUMBER PAGE : 2/ 7
EDITOR EPLAN
with IEC standard: Page structure with higher-level
GTY AUTOMATION IEC_tpl001
CHECK BY function and mounting location SDN BHD AS BUILT
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
© 2021

A POSITION POSITION A

SBU CW CW MID CCW MID CCW EXTEND EXTRACT EXTEND EXTRACT EXTEND EXTRACT
ESTOP
ALARM LIMIT LIMIT LIMIT LIMIT RS RS RS RS RS RS
2.10:A / P24 P24 / 5.1:B
B B

2.10:B / N24 N24 / 5.1:B

C C

D D

11 11 13 13 13

E -4S4 -4S6 -4S8 -S410 -4S12 E


12 12 14 14 14

11 11 11 13 13 13
-4S1 -4S5 -4S7 -4S9 -4S11 -4S13
12 12 12 14 14 14

1.7:F

F 0.01 F

-X1 1 2 3 4 5 6 7 8

G 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10 0.11 G

-1A1
/1.9:E 01 03 05 07 09 11
H H
00 02 04 06 08 10
COM X1 X3 X5 X7 X11 X13
X0 X2 X4 X6 X10 X12

I I
CP2E-S30DR-A Input

DATE 1/10/2023 CUSTOMER : CONTRACTOR COMPANY: NOTES : PLC INPUT = +


J J
PROJECT : Project template with identification structure in accordance DRAWING NUMBER PAGE : 4/ 7
EDITOR EPLAN
with IEC standard: Page structure with higher-level
GTY AUTOMATION IEC_tpl001
CHECK BY function and mounting location SDN BHD AS BUILT
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
© 2021

A A

EXTEND EXTRACT WEIGH


RS RS OK
4.10:B / P24 P24 /
B B

4.10:B / N24 N24 / 6.1:H

C C

D D

13

E -5S4 E
14

13
-5S3
14

2.7:D

F 1.02 1.03 F

G 1.00 1.01 1.02 1.03 104 105 G

-1A1
/1.9:E 01 03 05
H H
00 02 04
X1 X3 X5
X0 X2 X4

I I
CP2E-S30DR-A Input

DATE 1/10/2023 CUSTOMER : CONTRACTOR COMPANY: NOTES : PLC INPUT = +


J J
PROJECT : Project template with identification structure in accordance DRAWING NUMBER PAGE : 5/ 7
EDITOR EPLAN
with IEC standard: Page structure with higher-level
GTY AUTOMATION IEC_tpl001
CHECK BY function and mounting location SDN BHD AS BUILT
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
© 2021

A A

B B

-1A1
/1.9:E
CP2E-S30DR-A Output

C C
Y0 Y1 Y2 Y4 Y05 Y07
-COM0: -COM0: -COM0: Y3 COM Y06
00 01 02 04 06 07
03 05 07

D D

100.00 100.01 100.02 100.03 100.04 100.05 100.06 100.07

E E

100.01 100.02 100.03 100.04 100.05 100.06 100.07


2.3:E 1.5:F 1.5:F 2.3:E 2.3:E 2.3:F 2.3:F

F F

G G

6.10:G / P24.1 P24.1 / 6.1:G

H H
5.10:B / N24 N24 / 7.1:H

I I

DATE 1/10/2023 CUSTOMER : CONTRACTOR COMPANY: NOTES : PLC OUTPUT = +


J J
PROJECT : Project template with identification structure in accordance DRAWING NUMBER PAGE : 6/ 7
EDITOR EPLAN
with IEC standard: Page structure with higher-level
GTY AUTOMATION IEC_tpl001
CHECK BY function and mounting location SDN BHD AS BUILT
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
© 2021

A A

B B

-2A1
CP2E-S30DR-A Output

C C
Y10 Y12
-COM1: Y11 Y13
00 02
01 03

D D

101.00 101.01 101.02 101.03

E E

x1 x1

F -Y1 -Y3 F
x2 x2

x1 x1
-Y2 -Y4
x2 x2

G G

7.10:G / P24.1 P24.1 / 7.1:G

H H
6.10:H / N24 N24 /

I I

DATE 1/10/2023 CUSTOMER : CONTRACTOR COMPANY: NOTES : PLC OUTPUT = +


J J
PROJECT : Project template with identification structure in accordance DRAWING NUMBER PAGE : 7/ 7
EDITOR EPLAN
with IEC standard: Page structure with higher-level
GTY AUTOMATION IEC_tpl001
CHECK BY function and mounting location SDN BHD AS BUILT
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
© 2021

A A

B B

57 mm

C C

D D

E E

E N C Y
G S
R

T
E M

O
P
F F

E M
P
O

E
T
R
S G
E N C Y

G G

H H

I I

DATE 1/10/2023 CUSTOMER : CONTRACTOR COMPANY: NOTES : PANEL LAYOUT = +


J J
PROJECT : Project template with identification structure in accordance DRAWING NUMBER PAGE : A/ 7
EDITOR EPLAN
with IEC standard: Page structure with higher-level
GTY AUTOMATION IEC_tpl001
CHECK BY function and mounting location SDN BHD AS BUILT
1 2 3 4 5 6 7 8 9 10

You might also like