0% found this document useful (0 votes)
281 views

TMP Drawing - SL2L

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
281 views

TMP Drawing - SL2L

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A-A

EL
DIRECTION

SL
TRAFFIC

FL

MEDIAN

DIRECTION
FL

TRAFFIC
SL

EL

50m 50m Working Area 100m 200m 100m 50m 100m 100m 100m 100m 200m 200m

KESULITAN
KINI UNTUK
KESELAMATAN
60 80
MASA DEPAN
A-A km / j 200 m km / j 400 m

KM ____.__ __B
DILARANG
MEMOTONG

NOTES : LEGEND :

1. Spacing
Safety Cone
Taper Straight Stretch
Super Cones 5.0m -
Super Cones
Safety Cones - 10.0m
Blinker for Barriers/Cones 5.0m 30.0m
Work Area
2. For night work, the contractor shall install a reliable flood/spot light system, SUPER CONE
such as Flood Lighting System, etc.
(Must be anti-glare feature) Flagman
WORKING AREA
3. Access to work site-Flagman required if the construction vehicle enter or
Chevron Light
exit working area.
(For Noght Work)
4. The temporary speed limit area indicative only and shall be amend according
to the gazetted speed limit. Flood Light
Speed Limit 1st Reduction Speed 2nd Reduction Speed (For Night Work) 2.50m - 3.00m 3.65m 3.65m MEDIAN 3.65m 3.65m 2.50m - 3.00m
km/h km/h km/h EL SL FL FL SL EL

110 80 60
90 70 50 SECTION A-A
80 60 40
60 40 20

5.
Location Treatment Time Lane

Day : 0900hrs - 1900hrs


(Proposal) (Proposal) EL
Night: 2200hrs - 0700hrs

DWG NO : REV :

TMP-2LC-SL A
AUTHORITY : MAIN CONTRACTOR : CLIENT : DATE : REF NO : Kinematic ENgineering & Construction Sdn Bhd
TWO(2) LANE CARRIAGEWAY - SLOW LANE CLOSURE KINEMATIC ENGINEERING & PROJEK LEBUHRAYA (KEC) retain copyright of all designs and data
SCALE : NOT TO SCALE shown in this drawing. Written permission is
CONSTRUCTION SDN BHD USAHASAMA BERHAD 14-June-2022 TMP-TD-133 required for any use and/or reproduction. All
prints, specifications and copyrights are the
PROJECT TITLE : DRAWN BY : CHECKED BY : property of KEC and shall be returned on
PROPOSED RETRO REFLECTIVITY TESTING FOR MAINLINE SIGNAGE completion of works. Contractor to check
dimensions on site and notify KEC of
AND ASSOCIATED WORKS ALONG SOUTHERN REGION FOR YEAR 2022 MUS LEOW discrepancies on site. Do not scale off drawings.