SAUDI ARAMCO ID/PIEU-31-May-2019 - REV.2019.05.00 (Standards Cutoff - May 31,2019) Rev.2019.05.00 31-May-19
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Coating Equipment Inspection SAIC-H-2026 29-Oct-19 COAT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Compressed air for blasting is not contaminated with oil, moisture or other
contaminants. This is determined by performing a blotter test as follows:
a) Attach a piece of blotter or absorbent paper to a clip board.
b) Operate the blast system for at least 5 minutes, then allow air
SAES-H-001,
B2 flow out of the blasting nozzle at a nozzle pressure of 50 psig.
Para. 6.5.1
c) Hold the paper approx. 45-60 cm in front of the nozzle for at
least 1 minute.
d) Satisfactory results shall be no water or oil contamination on
the blotter.
C AIR RECEIVER:
# Saudi Aramco: Company General Use Saudi Aramco: Company General Use
#
SAUDI ARAMCO ID/PIEU-31-May-2019 - REV.2019.05.00 (Standards Cutoff - May 31,2019) Rev.2019.05.00 31-May-19
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Coating Equipment Inspection SAIC-H-2026 29-Oct-19 COAT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Air receiver between compressor and the blasting pot is built and stamped SAES-H-102,
C1
in accordance with ASME Sec. VIII, Div 1 or equivalent. Para. 4.4.1.4
Air receiver has been revalidated annually by a successful hydro test at
250 psig. SAES-H-102,
C2
Note: The hydro test certificate can be accepted as proof of the Para. 4.4.1.4
revalidation test.
The calibration period of Pressure gauges and relief valves has not
SAES-H-102,
C3 exceeded one year.
Para. 4.4.1.5
Note: The calibration certificate and tags shall be provided.
Blasting pot control valves, for air and abrasive mixing are operational SAES-H-001
D1
and good condition. (SSPC Chapter 2.4, Para. III F & Para V-A). Para. 8.1.4
Oil and Moisture separators at the blasting pot are operational and good
SAES-H-001
D2 condition verified by partially opening the moisture trap to drain moisture.
Para. 8.1.3
(SSPC Chapter 2.4, Para. III F & Para V-A).
Blasting hoses are in good condition (free of kinks, and signs of wear and SAES-H-001
E1
tear such as thinning of ply wrapping and punctures). Para. 8.1.3
SAES-H-102,
E2 The blasting hose is the static dissipating type with external couplings
Para. 4.4.2.3
Blasting Nozzle is equipped with a remote control shut-off switch SAES-H-102,
E3
'deadman'. Para. 4.4.2.1
Blasting nozzle tip is not worn out (orifice size is maintained) or cracked. SAES-H-001
E4
(SSPC Chapter 2.4, Para. III E) Para. 8.1.3
Respirable air-fed hoods and OSHA approved in-line air filters are used SAES-H-102,
E5
by the blaster at all times. Para. 4.4.2.4
Compressor hoses, airlines and blast hoses are safety wired at each SAES-H-102,
E6
coupling using proper safety pins Para. 4.4.2.5
F Coating Equipment
SAES-H-101V,
F1 Spray Nozzle Tip Size is as per SAES-H-101V Data sheets. Coating
Data Sheet
Airless spray equipment components, hoses, spray gun are in good SAES-H-102,
F2
working condition. Hoses are of anti-static type and grounded. Para. 4.4.5
Airless spray equipment are grounded with a wire of size AWG-4 or
SAES-H-102,
F3 larger.
Para. 4.4.5.8
Safety pressure relief valves set at 5000 psi or less are provided on the
out bound side of pressure pump.
SAES-H-102,
F4 Note : Hoses, pumps, and accessories shall never be operated at
Para. 4.4.5.5
pressures exceeding their rated pressure. In no case shall the working
pressure in the paint line exceed 5000 psi.
The trigger safety catch and tip guard provided on the airless gun are in SAES-H-102,
F5
good operating condition. Para.4.4.5
G Other Accessories
SAES-H-102,
G1 Electrically driven power mixers shall be grounded
Para. 4.4.4.2
Ventilators provided are functioning well and provide adequate flow of air
SAES-H-102,
G2 in confined spaces. Note: Table 4-1 of SAES-H-102 provides the
Para. 4.2
ventilation requirements for various sizes of confined spaces.
# Saudi Aramco: Company General Use Saudi Aramco: Company General Use
#
SAUDI ARAMCO ID/PIEU-31-May-2019 - REV.2019.05.00 (Standards Cutoff - May 31,2019) Rev.2019.05.00 31-May-19
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Coating Equipment Inspection SAIC-H-2026 29-Oct-19 COAT-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
REFERENCE DOCUMENTS
1. SAES-H-001,Coating Selection and Application Requirements for Industrial Plants and Equipment (23 May 2019)
2. SAES-H-102: Safety requirements for Coating Applications (29 October 2017)
3. SAES-H-101V, Approved Saudi Aramco Data Sheets – Paints and Coatings, ( 16 October 2017 )
4. G.I.-0006.021, Safety Requirements for Abrasive Blast Cleaning, (19 June 2012 )
5. Steel Structures Painting Council (SSPC), September 1993
# Saudi Aramco: Company General Use Saudi Aramco: Company General Use