ECC Presentation

This document provides an overview of a proposed 2 x 612 MW coal-fired power plant project near Chattogram, Bangladesh. Key details include a project cost of 2.506 billion USD, commencement in December 2018, planned operation start in May 2023, and use of coal from Australia and Indonesia. The project includes pollution abatement measures like electrostatic precipitators, seawater flue gas desulfurization, and wastewater treatment systems. Environmental permits have been obtained and compliance will be monitored through regular reporting.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views66 pages

ECC Presentation

This document provides an overview of a proposed 2 x 612 MW coal-fired power plant project near Chattogram, Bangladesh. Key details include a project cost of 2.506 billion USD, commencement in December 2018, planned operation start in May 2023, and use of coal from Australia and Indonesia. The project includes pollution abatement measures like electrostatic precipitators, seawater flue gas desulfurization, and wastewater treatment systems. Environmental permits have been obtained and compliance will be monitored through regular reporting.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 66

Heartiest Welcome to

Honorable Members
of
Department of Environment

Date: xx February, 2023


2 x 612 MW (Net) Coal Fired Power Generation Facility Near
Chattogram, Bangladesh
Project Overview
Capacity of the Power Plant: 1320 MW (Gross)
Project Area: 606.19 acres
Main Plant: 216.55 acres
Jetty & Water Discharge Area: 304.72 acres
Ash Yard: 84.92 acres
Project Cost: 2.506 Billion USD
Commencement of the Project: December, 2018
Planned Commencement of Plant Operation: May, 2023
Raw Material of the Project: Coal
Source of Coal: Australia & Indonesia
Amount of Coal required for Plant Operation: 4.2 million ton (approx.)
Storage Capacity of Coal: 9,50,000 ton
Byproduct of the Plant Operation: Fly Ash and Bottom Ash
Quantity of Fly Ash: 892329 ton/a (approx.)
Quantity of bottom Ash: 892329 ton/a (approx.)
Project Overview

Length of Jetty: 199m


Width of Jetty: 20m
No of berths: 03 nos
Type of berth: 02 berths for coal unloading and 01 berth for ash loading
Capacity of the barge for carrying coal: 2000 ~ 6000 DWT
Capacity of the barge for ash transportation: 1200 DWT
Design high water level: 4.91m CD
Design low water level: 0.43m CD
Extreme high-water level: 9.51m CD
Design Jetty Surface Elevation: 12.6m CD
Design sea bottom elevation alongside jetty apron after dredging: -6.4m CD
Project Overview (Jetty)
No of Ship Unloader for coal: 02 nos
Type of Ship Unloader: Screw Type
Capacity of each unloader: 1000 t/hr
No of ash loader at jetty: 01 nos
Capacity of ash loader: 100 t/hr
No of Breakwater: 02 nos
Length of South Breakwater: 2521 m
Length of North Breakwater: 2190 m
Jetty
North Breakwater Overall
Layout of
Jetty
Barge approach
channel
including
Breakwater

South Breakwater
List of Major Permits and Clearances of the Project

No Objection Certificate from Union Parishad


No Objection Certificate from Union Parishad for Shoreline Activities
Environmental Impact Assessment Report (Main Plant) Clearance Certificate issued by DoE and renewal of the
said certificate every year
Environmental Impact Assessment Report (Jetty) Clearance Certificate issued by DoE renewal of the said
certificate every year
No Objection Certificate from District Commissioner for Land Use
Power Purchase Agreement with Bangladesh Power Development Board
Implementation Agreement with MoPEMR and PGCB
Approval of Factory Layout Plan from DIFE
Registration of Boiler from Bangladesh Boiler Inspector's Office
Permission for storing petroleum from Bangladesh Explosive Department
Clearance from CAAB for construction of Chimney
List of Major Permits and Clearances of the Project

Approval of Fire Safety Plan from Bangladesh Fire Safety Department


No Objection Certificate from Bangladesh Agriculture Department
No Objection Certificate from Chittagong Port Authority for Jetty & Breakwater Construction
No Objection Certificate from Bangladesh Navy for Jetty & Breakwater Construction
No Objection Certificate from Chittagong Port Authority for Commencing Dredging at Project Site
Project Progress as of January 2023

Project Overall 97.98%


Progress

Engineering 99.89%

Procurement 99.37%

Construction 95.82%

11
Manpower of EPC Contractor as of January, 2023

Total Manpower 2025

Chinese 302

Local 1723
Environmental
Conservation Rules,
1997

Submission of
Environmental Environmental
Monitoring Report Regulations &
to DoE prepared by Guidelines of
3rd party Department of
Environmental Environment
Agency Environmental
Compliance Status of
the Project

Performance
Environmental
Standards of
Management Plan
International
as mentioned in
Finance
approved EIA
Corporation (IFC)
Possible Sources of Pollution during Plant Operation
• Particulate Matter

Flue gas • NOX


• SOx

• Turbine Generator Set


• Exciter
Noise • Various Pumps & Fans
• Coal Mill

• Sanitary Wastewater

Wastewater • Chemical Wastewater


• Oily Wastewater

• Ash Dust

Solid Waste • Coal Dust


• Domestic Waste
Pollution Abatement Measures
Flue Gas Treatment
Main Pollutant of Flue Gas Abatement Measure
Particulate Matter Five-electric-field Electro Static Precipitator (ESP) with efficiency not
less than 99.7%.
Dust concentration at the ESP outlet shall not exceed 50 µg/Nm3 < 65
µg/Nm3 (24 hrs) DoE Guideline.
SO2 Seawater FGD will be used for the reduction of SOx Construction.
The sulfur dioxide concentration at the chimney outlet shall not
exceed 200 µg/Nm3 < 250 µg/Nm3 (1 hr) DoE Guideline.

NOx The boiler is in built with Low NOx burner. NOx emission
concentration at the boiler outlet shall not exceed 50 µg/Nm3 < 80
µg/Nm3 (24 hrs) DoE Guideline.
Chimney A 275m high double-flue chimney with an internal diameter at a
single flue outlet of 6.5m has already been constructed
Function of Electro Static Precipitator

Transportation
Charged Dust of Dust Particle
Charging Charged Dust Flue Gas
Flue Gas Particles drift to Ash Silo
Suspended Particle passes through
Ionization towards through
Dust Particles Collection FGD System
Electrode Pneumatic
System
Function of Seawater FGD

The following Chemical SO2 has converted


Entrance of Flue Gas Flue Gas passed Reaction happens: into stable Sulphate
at SO2 Absorption through sprayed
SO2+ ½O2+2HCO3- SO42- + ion and the flue gas
System seawater
H2O +2 CO2 flows to chimney

Dilution will be done to Aeration has been


Discharge of Diluted done to reduce the
reduce the temperature of
water into the sea CO2 concentration in
water
water
Abatement of Noise Level
Selection of Energy Saving & Low Noise Products during design and Equipment Tendering

Installation of Silencer at Boiler Exhaust Vent and Fan Inlet

Installation of Acoustic enclosure at Turbine-Generator Set

Rigid Coupling adopted for Turbine Generator Set

Adoption of sound-proof wall, acoustic ceiling and sound-proof door at Central Control Building

Workers at high noise area shall wear noise protecting ear plug

Development of Green Built for lowering the Noise LevelDevelopment


Wastewater Treatment
Main Source of Wastewater Abatement Measure
Sanitary Wastewater Treatment will be done at Sanitary Sewage Treatment Plant and
Treated water will be reused for the planting.
Acid & Alkali Wastewater from Boiler Acid & Alkali wastewater will be collected into the neutralization
Makeup Water Treatment System and pit, drained into the Central Monitoring Basin (CMB) after
condensate polishing treatment system neutralization to monitor the water quality
Boiler Chemical Cleaning and Air Treatment will be done at Industrial Wastewater Treatment
Preheater Washing waste water System and reused for the plant purposes
Oily Wastewater Treatment will be done in the oil-water separation basin through
the oil-water separator. The treated water will be discharged into
the reuse water basin.
Coal wash water Coal waste water will be collected to coal waste treatment system
and recycled after treatment without discharge.
Function of Sanitary Sewage Treatment System
Function of Effluent Treatment System
Function of Oily Wastewater Treatment System
Function of Coal Wastewater Treatment System
Solid Waste Management
Main Source of Solid Waste Abatement Measure
Ash Dust 1. Dry Ash Handling System
2. Bottom Ash Handling System
3. Construction of Ash Yard for efficient Ash Management
4. To prevent seepage of ash water through ground, anti seepage composite
geomembrane has been installed in Ash Yard
5. To minimize the dust at Ash Yard, regular sprinkling will be ensured.
6. Green belt will be developed around Ash Yard to arrest the emission of particulate
matter

Coal Dust 1. Arrangement of water spray gun at Coal Yard and fog mist at conveyor belt and
transfer towers
2. Storage of Coal in a covered storage yard as well as enclosure with windbreak net
3. Dust removal system with bag filter has been provided at the coal crusher house,
coal bunker and transfer towers.
4. Development of a Green belt adjacent to the Coal Yard to arrest the emission of
particulate matter
Solid Waste Management
Main Source of Solid Waste Abatement Measure
Domestic Waste 1. Solid domestic waste will be collected in designated bins
2. Collected biodegradable waste will be managed following deep burial method
3. Non biodegradable waste and hazardous waste will be stored in a separate
enclosed place which will be further managed by a licensed 3rd party during
operation stage of the project
Environmental Monitoring Plan by Project Proponent
during Plant Operation according to EIA
Establishment of a Continuous Emission Monitoring System (CEMS) at the Chimney

Six Ambient Air Quality Monitoring Systems will be installed at Project Site for monitoring air quality

A meteorological station will be installed along with required sensors for wind speed, Wind direction,
Ambient air temperature, Ambient pressure, Relative humidity sensor, Solar radiation, Rain Gauge,
Meteorological Mast etc.

Continuous Monitoring of water quality and noise level

Laboratory with necessary equipment for monitoring coal quality


Environmental Monitoring Plan of Project Proponent
during Plant Operation according to EIA
Environmental Monitoring Plan of Project Proponent
during Plant Operation according to EIA
Project Photos
Plant View from North Side

31
400 KV Switch Yard

32
GIS & Relay Building outside and Transmission Line
GIS & Relay Building Inside View
Transformers for Unit#1

Transformers for Unit#2


Central Control Room

Engineer Station
MPH Building Unit 1 & Unit 2
Turbine and Generator MPH 1
Turbine and Generator MPH 2
Boiler Area
Boiler Unit#1
Boiler Unit#2
Coal Mills 1 & 2
PA & FD Fan# 1 & 2
Unit 1 ESP
Unit 2 ESP
Chimney Area
Chimney Liner
Unit 1 Absorption Tower-FGD Area Unit 2 Absorption Tower-FGD Area
Unit 1 Aeration Basin Unit 2 Aeration Basin
Crusher House to Boiler
TT 1 TT 2 TT3

TT 4 TT 5 TT 6 TT 7
BCT-02 Belt 3A
BCT 04 BCT 05

BCT 06 BCT 01
BCT 07

BCT 08
Stacker-Reclaimer-3A & 3B
Coal Crusher Building Driving + As Fired Sampling Room
Dry Coal Shed-West

Dry Coal Shed-East


Sea Water Intake Pump House Area

Sea Water Intake Pump


Fly Ash Silo Fly Ash Loading System at Jetty

60
Fuel Oil Area

61
Water Treatment Plant
Water Treatment Plant Inside
ETP area and DM System Acid &
Alkali storage area
Jetty Area
Breakwaters