ECC Presentation
ECC Presentation
Honorable Members
of
Department of Environment
South Breakwater
List of Major Permits and Clearances of the Project
Engineering 99.89%
Procurement 99.37%
Construction 95.82%
11
Manpower of EPC Contractor as of January, 2023
Chinese 302
Local 1723
Environmental
Conservation Rules,
1997
Submission of
Environmental Environmental
Monitoring Report Regulations &
to DoE prepared by Guidelines of
3rd party Department of
Environmental Environment
Agency Environmental
Compliance Status of
the Project
Performance
Environmental
Standards of
Management Plan
International
as mentioned in
Finance
approved EIA
Corporation (IFC)
Possible Sources of Pollution during Plant Operation
• Particulate Matter
• Sanitary Wastewater
• Ash Dust
NOx The boiler is in built with Low NOx burner. NOx emission
concentration at the boiler outlet shall not exceed 50 µg/Nm3 < 80
µg/Nm3 (24 hrs) DoE Guideline.
Chimney A 275m high double-flue chimney with an internal diameter at a
single flue outlet of 6.5m has already been constructed
Function of Electro Static Precipitator
Transportation
Charged Dust of Dust Particle
Charging Charged Dust Flue Gas
Flue Gas Particles drift to Ash Silo
Suspended Particle passes through
Ionization towards through
Dust Particles Collection FGD System
Electrode Pneumatic
System
Function of Seawater FGD
Adoption of sound-proof wall, acoustic ceiling and sound-proof door at Central Control Building
Workers at high noise area shall wear noise protecting ear plug
Coal Dust 1. Arrangement of water spray gun at Coal Yard and fog mist at conveyor belt and
transfer towers
2. Storage of Coal in a covered storage yard as well as enclosure with windbreak net
3. Dust removal system with bag filter has been provided at the coal crusher house,
coal bunker and transfer towers.
4. Development of a Green belt adjacent to the Coal Yard to arrest the emission of
particulate matter
Solid Waste Management
Main Source of Solid Waste Abatement Measure
Domestic Waste 1. Solid domestic waste will be collected in designated bins
2. Collected biodegradable waste will be managed following deep burial method
3. Non biodegradable waste and hazardous waste will be stored in a separate
enclosed place which will be further managed by a licensed 3rd party during
operation stage of the project
Environmental Monitoring Plan by Project Proponent
during Plant Operation according to EIA
Establishment of a Continuous Emission Monitoring System (CEMS) at the Chimney
Six Ambient Air Quality Monitoring Systems will be installed at Project Site for monitoring air quality
A meteorological station will be installed along with required sensors for wind speed, Wind direction,
Ambient air temperature, Ambient pressure, Relative humidity sensor, Solar radiation, Rain Gauge,
Meteorological Mast etc.
31
400 KV Switch Yard
32
GIS & Relay Building outside and Transmission Line
GIS & Relay Building Inside View
Transformers for Unit#1
Engineer Station
MPH Building Unit 1 & Unit 2
Turbine and Generator MPH 1
Turbine and Generator MPH 2
Boiler Area
Boiler Unit#1
Boiler Unit#2
Coal Mills 1 & 2
PA & FD Fan# 1 & 2
Unit 1 ESP
Unit 2 ESP
Chimney Area
Chimney Liner
Unit 1 Absorption Tower-FGD Area Unit 2 Absorption Tower-FGD Area
Unit 1 Aeration Basin Unit 2 Aeration Basin
Crusher House to Boiler
TT 1 TT 2 TT3
TT 4 TT 5 TT 6 TT 7
BCT-02 Belt 3A
BCT 04 BCT 05
BCT 06 BCT 01
BCT 07
BCT 08
Stacker-Reclaimer-3A & 3B
Coal Crusher Building Driving + As Fired Sampling Room
Dry Coal Shed-West
60
Fuel Oil Area
61
Water Treatment Plant
Water Treatment Plant Inside
ETP area and DM System Acid &
Alkali storage area
Jetty Area
Breakwaters