The document outlines a 10 task project plan to develop a new system from October 2022 through June 2023. The key tasks include: 1) determining system requirements, 2) identifying involved workers, 3) mapping the system flow, 4) designing the database dependent on the first 3 tasks, 5) designing the UI/UX, 6) coding the program, 7) evaluating the program, 8) testing the program, 9) creating documentation, and 10) installing the system. The tasks have defined durations and dependencies to be completed over 10 months.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

Indri 8a PDF

The document outlines a 10 task project plan to develop a new system from October 2022 through June 2023. The key tasks include: 1) determining system requirements, 2) identifying involved workers, 3) mapping the system flow, 4) designing the database dependent on the first 3 tasks, 5) designing the UI/UX, 6) coding the program, 7) evaluating the program, 8) testing the program, 9) creating documentation, and 10) installing the system. The tasks have defined durations and dependencies to be completed over 10 months.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID Task Task Name Duration Start Finish Predecessors 01 October 21 November 11 January 01 March 21 April 11 June

Mode Week -3 Week 1 Week 4 Week 7 Week 10 Week 13 Week 16 Week 19 Week 22 Week 25 Week 28 Week 31 Week 34 Week 37 Week 40
1 A. Determine 21 days Mon Mon
system 03/10/22 31/10/22
requirement
2 B. Determine the 7 days Tue Wed 1
workers involved 01/11/22 09/11/22
3 C. Identification 14 days Tue Fri 1
of system flow 01/11/22 18/11/22
4 D. Design 35 days Mon Fri 3;2
database 21/11/22 06/01/23
5 E. Design UI/UX 21 days Mon Mon 3
21/11/22 19/12/22
6 F. Coding 14 days Mon Thu 4
program 09/01/23 26/01/23
7 G. Evaluation 21 days Fri Fri 6;5
27/01/23 24/02/23
8 H. Program 35 days Mon Fri 7;6
testing 27/02/23 14/04/23
9 I. Documentatiom 35 days Mon Fri 8;7
17/04/23 02/06/23
10 J. Install 14 days Mon Thu 9
05/06/23 22/06/23

Task Project Summary Manual Task Start-only Deadline

Split Inactive Task Duration-only Finish-only Progress

Project: TP M2 8A Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone

You might also like