Method of Statement
Method of Statement
Risk Identification
Manual Handling
Electrical fire/shock
Slip/Trips and Falls – use of stepladder
Use of tools and electrical equipment
The above is only guidance to possible risks involve with the works and is not a complete list of the risks
involved with the works, all risks involved with the works must be suitably assessed and controlled prior to
works commencing.
4. Safety Equipment and Personal Protective Equipment
Personal use Specify type (if required)
Head protection Hardhat Climbing helmet
Eye protection Goggles Visor
Ear protection
Breathing protection Dust mask Respirator
Safety footwear Standard Climbers
Climbing equipment Harness Lanyard
High visibility clothing Yellow Orange
Miscellaneous Railok Latchway
Knee pads Gloves IR Gloves
Collective Equipment Specify type if necessary
Any defect or loss of PPE equipment is to be reported immediately to the After Sales Manager/Senior
Administrator and work ceased until further replacements have been provided. The After Sales
Manager/Senior Administrator is to periodically inspect the PPE in use on site in accordance with relevant
legislation.
Page 1 of 3
Method Statement
6. Safety Methodologies
Park vehicle close to site of installation to reduce manual handling and re-position to a safe parking
space after equipment and tools unloaded.
Ensure working area is clear of obstructions and hazards – cordon off area, visually inspect all tools
to be used.
Safe manual handling practices will be observed when lifting equipment from vehicle to location of
installation. Use mechanical aids, pallet truck or 2 person lift.
Unpack and remove packing materials out of the way. Ensure good housekeeping maintained
throughout the entire process.
Safe assembly of equipment – column to be bolted to floor prior to aligner imaging arm and camera
to be fitted. Stepladders may be required for the locating and fitting to the assembly framework –
visually inspect stepladder for any signs of wear or damage before use.
Test equipment – under supervision of a client employee a wheel may be required to carry out
testing of the system.
Clear away all packing and waste, clean down area as required. Remove tools/barriers to vehicle and
waste to be disposed of correctly.
If applicable, demonstrate/train client staff on correct use, maintenance of equipment and any
equipment specific hazards and controls. (Handover operator manual).
7. Training
8. Permits to Work
Page 2 of 3
Method Statement
9. Site Supervision/Management
On Site Supervisor:
Project Manager:
Monitoring: -
Distribution
Copy to remain on site
Copy at Head Office
I hereby confirm that I have read and under stood the Method Statement and agree to work to the agreed
safe system of work.
Page 3 of 3