This document outlines the method statement for continuity and insulation resistance testing for renovation and repair works at the Johor Bahru Revenue Tower in Johor, Malaysia. It details the scope of work involving electrical continuity testing of circuits. It provides the procedures for testing continuity of protective conductors and insulation resistance in lighting circuits. It also outlines the responsibilities of the project manager, M&E coordinator, and safety officer to ensure testing is carried out according to specifications and that appropriate health and safety measures are implemented.

Uploaded by

Mohamad Najib
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

MS For Continuity Testing PDF

This document outlines the method statement for continuity and insulation resistance testing for renovation and repair works at the Johor Bahru Revenue Tower in Johor, Malaysia. It details the scope of work involving electrical continuity testing of circuits. It provides the procedures for testing continuity of protective conductors and insulation resistance in lighting circuits. It also outlines the responsibilities of the project manager, M&E coordinator, and safety officer to ensure testing is carried out according to specifications and that appropriate health and safety measures are implemented.

Uploaded by

Mohamad Najib
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

KERJA-KERJA PENGUBAHSUAIAN DAN

PEMBAIKAN BANGUNAN MENARA HASIL JOHOR


BAHRU, JOHOR UNTUK LEMBAGA HASIL DALAM
NEGERI MALAYSIA

KERJA-KERJA PENGUBAHSUAIAN DAN PEMBAIKAN


BANGUNAN MENARA HASIL JOHOR BAHRU, JOHOR
UNTUK LEMBAGA HASIL DALAM NEGERI MALAYSIA

KONTRAK IP LHDNM (K) BIL. 2/2022

METHOD STATEMENT FOR


CONTINUITY AND INSULATION RESISTANCE TEST

GOLDEN SHARAR SDN. BHD.


KERJA-KERJA PENGUBAHSUAIAN DAN
PEMBAIKAN BANGUNAN MENARA HASIL JOHOR
BAHRU, JOHOR UNTUK LEMBAGA HASIL
DALAM NEGERI MALAYSIA

CONTENT

1.0 Scope Of Work 3

2.0 Continuity And Insulation Resistance Testing 4-5


Procedure

3.0 Responsibilities 6

4.0 Health & Safety 7

GOLDEN SHARAR SDN. BHD. Page 2


KERJA-KERJA PENGUBAHSUAIAN DAN
PEMBAIKAN BANGUNAN MENARA HASIL JOHOR
BAHRU, JOHOR UNTUK LEMBAGA HASIL
DALAM NEGERI MALAYSIA

1.0 SCOPE OF WORK

An electrical continuity test is the checking of an electric circuit to see if the current flows
throughout the circuit. Continuity test is performed by applying a small voltage to one
end of the circuit and measuring on the other end.

The most common and basic way of performing a continuity test is with the help of a
resistance tester (any simple multi-meter with this function will do). This is because the
resistance of conductors between the two ends is usually very small (less than 100 ohm).

It should be noted that the continuity and insulation resistance tests for lighting circuit
described below can only be applied to a 'loop-in' wiring system only.

When we talk about Continuity Testing within the Inspection and Testing Procedure then
we apply the same principle, but with a bit more detail.

GOLDEN SHARAR SDN. BHD. Page 3


KERJA-KERJA PENGUBAHSUAIAN DAN
PEMBAIKAN BANGUNAN MENARA HASIL JOHOR
BAHRU, JOHOR UNTUK LEMBAGA HASIL
DALAM NEGERI MALAYSIA

3.0 CONTINUITY 1.0 CONTINUITY OF CPC IN LIGHTING CIRCUIT


3.1 Test method 1 (CPC conductor terminated at the last point of the circuit and using the
neutral conductor as a return lead)
3.1.1 Connect the neutral conductor to the CPC conductor (earth wire) at the last point of
the circuit under test.
3.1.2 Test between neutral and earth of the circuit at the DB.
3.1.3 Record the test result obtained.
3.1.4 The readings should be compared with the "Resistance of copper conductors" table
for a particular length and size.

3.2 Test method 2 (CPC terminated at the switch panel and using the phase conductor as a
return lead)
3.2.1 Connect the phase conductor (phase wire) to the CPC conductor (earth wire) at the
switch panel.
3.2.2 Test between the phase and earth of the circuit at the DB.
3.2.3 Record the test result obtained.
3.2.4 The readings should be compared with the "Resistance of copper conductors" table
for a particular length and size.

4.0 INSULATION RESISTANCE IN LIGHTING CIRCUIT


4.1 A d.c voltage not less than twice (2x) the nominal voltage of the circuit concerned (r.m.s
value for an a.c supply) shall be applied for the measurement of insulation resistance,
provided that the test voltage need not exceed 500 V d.c for installations rated up to
500V.
4.2 Test method (CPC conductor terminated at the last point of the circuit)
4.2.1 Test between the phase (join together all phase conductors at the switch panel)
and the neutral at the DB.
4.2.2 Repeat the test for phase to CPC.
4.2.3 Test between the neutral and the CPC at the DB.

GOLDEN SHARAR SDN. BHD. Page 4


KERJA-KERJA PENGUBAHSUAIAN DAN
PEMBAIKAN BANGUNAN MENARA HASIL JOHOR
BAHRU, JOHOR UNTUK LEMBAGA HASIL
DALAM NEGERI MALAYSIA

GOLDEN SHARAR SDN. BHD. Page 5


KERJA-KERJA PENGUBAHSUAIAN DAN
PEMBAIKAN BANGUNAN MENARA HASIL JOHOR
BAHRU, JOHOR UNTUK LEMBAGA HASIL
DALAM NEGERI MALAYSIA

4.0 RESPONSIBILITIES

Project Manager

Responsible for accomplishing the stated project objectives which include creating
clear and attainable project objectives, building the project requirements, and
managing the constraints of the project management triangle, which is cost, time,
scope, and quality .The Project Manager shall be responsible for ensuring that the
Project Quality Plan and the Inspection and Testing procedures, Continuity And
Insulation Resistance Testing Method Statement, HSE safety, and all contractual
documentation are maintained up to date and accessible to all parties.

M & E Coordinator

Responsible for overall construction activities ensuring that all Insulation Continuity
And Insulation Resistance Testing Method Statement, quality, and safety procedures
shall be implemented and required approval permits shall be obtained.

Safety And Health Officer

Safety And Health Officer (SHO) generally plan, coordinate and implement issues and
directives within the organization. Ensures safe environmental working conditions for
all employees. Ensure enforcement of safety procedures in accordance as per
approved HSE Plan. Will be closely monitoring the site engineer’s strict implementation
of the Continuity And Insulation Resistance Testing Method Statement, the use of
proper tools and equipment to maintain safety, certifications of equipment and their
adherence to safety regulations, reporting of any unsafe work or stopping work that
does not comply with HSE procedures.

GOLDEN SHARAR SDN. BHD. Page 6


KERJA-KERJA PENGUBAHSUAIAN DAN
PEMBAIKAN BANGUNAN MENARA HASIL JOHOR
BAHRU, JOHOR UNTUK LEMBAGA HASIL
DALAM NEGERI MALAYSIA

5.0 HEALTH & SAFETY


5.1 Safety

• Safety induction to be conducted to all new workers that involved to this


activity and safety tool box meeting shall be conducted every day to remind
the workers about concerning the safety.
• All workers shall provide with proper PPE (Personal Protective Equipment)
and shall be worn every time they are entering the site. Safety Officer /
Safety Supervisor shall ensure all the workers wear all the safety equipment
provided.
• Safety Officer / Safety Supervisor shall ensure that the activity shall carry out
in a safe manner.
• All workers shall fully support and actively participate in all safety related
activities and comply with all practicable safety measures.
• All workers shall be advised to report any accident or injury to supervisor
and proper treatment to be obtained.
• The Safety Supervisor / Safety Officer shall ensure that the workers
understand the safety regulations and explain in detail in particular hazards,
where the workers are working and the precaution to be taken to ensure
their safety.
• Proper and adequate provision of temporary signage’s and barricades at
diversions and temporary haul road as necessary.