0% found this document useful (0 votes)
46 views1 page

DTF Sec 0002

Vivek Kumar Sharma of Grid Solutions SAS submitted three drawings to Mr. Prakash Poudel of Nepal Electricity Authority for approval as part of the design, supply, installation and commissioning of 400 kV Gas Insulated Substations at New Khimti, Barhabise and Lapsiphedi substations. The drawings were Test Trip and Reset drawings for control room and switchyard equipment for the three substations. Mr. Poudel was requested to approve and return a signed copy of the transmittal sheet.

Uploaded by

Anonymous EVFw59
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

DTF Sec 0002

Vivek Kumar Sharma of Grid Solutions SAS submitted three drawings to Mr. Prakash Poudel of Nepal Electricity Authority for approval as part of the design, supply, installation and commissioning of 400 kV Gas Insulated Substations at New Khimti, Barhabise and Lapsiphedi substations. The drawings were Test Trip and Reset drawings for control room and switchyard equipment for the three substations. Mr. Poudel was requested to approve and return a signed copy of the transmittal sheet.

Uploaded by

Anonymous EVFw59
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Grid Solutions SAS

Immeuble Citylights 204 Rond-Point du Pont de Sèvres


92100 Boulogne-Billancourt (France)

DRAWING / DOCUMENT TRANSMITTAL SHEET

To Ref: GE/ENGG/5427PS122/SEC-002

Mr. Prakash Poudel (Project Manager) Date: 5/May/2021


Nepal Electricity Authority Sender: Vivek Kumar Sharma
Training Center Building e-mail [email protected]
Kharipati, Bhaktapur, Nepal

Your Reference: Contract No. PMD/PTDSSP/KBL-75/76-01

Project : Design, Supply, Installation and Commissioning of 400 kV Gas Insulated Substations (GIS) at New Khimti, Barhabise and Lapsiphedi

Sub : Submission of Drawing(s) / Document(s)

Dear Sir,
Please find enclosed the following drawing(s) / document(s) submitted for your approval.

S.No. Drawing/Document Number Rev. Description Category Code No. of Copies

TTR for CRP & SAS Equipments


1 5427PS122-KHM-400-SYD-PCP-S8010-TT-0042 0 RFA 2
(For New Khimti Sub-Station)
TTR for CRP & SAS Equipments
2 5427PS122-BRB-400-SYD-PCP-S8010-TT-0053 0 RFA 2
(For Barhabise Sub-Station)
TTR for CRP & SAS Equipments
3 5427PS122-LAP-400-SYD-PCP-S8010-TT-0046 0 RFA 2
(For Lapsiphedi Sub-Station)
Remarks: PURPOSE:

Please approve and return signed copy √


Returned and Approved x
Returned with Comments x
Documents sent in separate package x
Category Code:
RFA: Released For Approval RFC: Released For Construction RFI: Released For Information
Request you to approve the drawing(s) / document(s) and return the signed copy

Yours faithfully
For Grid Solutions SAS